05000266/FIN-2016004-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | The following violation of very low significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as an NCV. The licensee identified a finding of very low safety significance (Green) and an NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, due to the failure to properly implement instructions in Work Order (WO) 40461957 for the replacement of the power range nuclear instrument (NI) 1N-43 gain potentiometer vernier dial. Specifically, step 5 of the WO stated, Replace the gain pot vernier with the preset spare. Prevent movement of the potentiometer shaft as much as possible. Contrary to the WO instructions, the technician performing the work believed it was necessary to dial the gain potentiometer to zero before replacing the dial and in doing so caused the 1N-43 NI high flux trip function to become inoperable. This was identified when the control room operators observed the indicated NI power reading for 1N-43 decrease to 82 percent and questioned the technician performing the work about the observed power change. Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings required, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Contrary to the above, on December 2, 2016, the licensee did not accomplish activities affecting quality in accordance with the documented instructions. Specifically, the licensee did not follow step 5 of the work instructions in WO 40461957, causing the NI high flux trip function for 1N43 to become inoperable. The licensee entered this issue into the CAP as AR 02172378. The inspectors determined that this issue was of very low safety significance (Green) after reviewing IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings, dated October 7, 2016 and IMC 0609, Appendix A, The Significance Determination Process (SDP) For Findings At-Power, dated July 1, 2012. The inspectors answered no to all questions in Exhibit 2, Section C, Reactivity Control Systems. This resulted in the finding screening as Green. |
Site: | Point Beach |
---|---|
Report | IR 05000266/2016004 Section 4OA7 |
Date counted | Dec 31, 2016 (2016Q4) |
Type: | NCV: Green |
cornerstone | No Cornerstone |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | D Krause J Boettcher J Cameron J Havertape J Mancuso J Park J Rutkowski J Stewart K Barclay L Haeg M Garza R Baker |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
INPO aspect | |
' | |
Finding - Point Beach - IR 05000266/2016004 | |||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Point Beach) @ 2016Q4
Self-Identified List (Point Beach)
| |||||||||||||||||||||||||||||||||||||||||||||||||