Title | Failure to Promptly Correct Conditions Adverse to Quality Regarding Electrical Power Cable Sizing and Protection |
Description | The inspectors identified a finding of very-low safety significance, and an associated Non-Cited Violation of Title 10, Code of Federal Regulations (CFR) Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement timely corrective actions to address the longstanding issue of electrical power cables that have not been verified to be sized or protected in accordance with their design bases, as described in PBNPs Final Safety Analysis Report Section 8.0.1. Specifically, the licensee failed to correct known deficiencies regarding: (1) power cables with operating currents in excess of their current-carrying capacities; (2) power cables that are not protected against overload in accordance with the National Electrical Code; and (3) power cables for which their current-carrying capacities are undetermined. Although various corrective action documents have been initiated since these issues first came to light in the 1990 to 1991 time period, the licensee has not taken appropriate actions to correct the conditions adverse to quality to this date. The licensee entered this finding into their Corrective Action Program as Condition Report (CR) 02035020 and CR 02035680, with recommended actions to perform ampacity analysis for applicable cables, verify cables are protected against overload in accordance with the National Electrical Code, verify cable ampacities are higher than their respective load currents, and perform an evaluation to determine why this issue has not been resolved and address the safety culture aspect. The inspectors determined the licensees failure to promptly correct the conditions adverse to quality regarding electrical power cables was a performance deficiency warranting a significance determination. The performance deficiency was determined to be more than minor, and a finding in accordance with IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, because it was associated with the Design Control attribute of the Reactor Safety, Mitigating Systems Cornerstone, and it adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated the finding in accordance with IMC 0609.04, Phase 1, Initial Screening and Characterization of Findings. The finding screened as having very-low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function on the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. The inspectors identified a crosscutting aspect associated with this finding in the area of Human Performance, associated with the Design Margin component, because the licensee failed to ensure equipment is operated within design margins, and margins are carefully guarded and changed only through a systematic and rigorous process. |
Site: | Point Beach |
---|---|
Report | IR 05000266/2015008 Section 1R21 |
Date counted | Mar 31, 2015 (2015Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | B Jose C Edwards C Lipa C Phillips H Leake J Gilliam V Meghani |
Violation of: | 10 CFR 50 Appendix B Criterion XVI |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |