| | Q | CCA | Title |
|---|
| 05000259/FIN-2017003-01 | 2017Q3 | P.6 | Degraded EDG Flood Door Seals |
| 05000259/FIN-2017003-02 | 2017Q3 | H.12 | Failure to Maintain Intake Building Flood Barrier |
| 05000296/FIN-2017004-02 | 2017Q4 | H.13 | Failure to Perform an IDO without delay for 3A EDG after Observing Indications of a Degraded Condition |
| 05000260/FIN-2017004-01 | 2017Q4 | P.2 | Inadequate Determination of Operability for the HPCI System |
| 05000296/FIN-2018001-04 | 2018Q1 | | Inadequate Configuration Control of High Pressure Coolant Injection (HPCI)ValveDesign Issues |
| 05000259/FIN-2018001-01 | 2018Q1 | | Inadequate Post-Maintenance Testing of 4kV Breaker Stationary Switches |
| 05000259/FIN-2018001-02 | 2018Q1 | | Unauthorized Entry into a High Radiation Area(HRA |
| 05000259/FIN-2018001-03 | 2018Q1 | | Failure to Implement Controls for Locked High Radiation Area (LHRA) Access |
| 05000259/FIN-2018002-01 | 2018Q2 | P.3 | HPCI System Over Pressurization due to Failure to Maintain Procedure |
| 05000296/FIN-2018002-02 | 2018Q2 | | Inoperable Residual Heat Removal (RHR) Pump Results in Condition Prohibited by Technical Specifications |
| 05000259/FIN-2018412-01 | 2018Q2 | H.12 | Security |