Title | Agastat Time Delay Relays Design, Testing and Configuration Control Issues |
Description | A finding of very low safety-significance (Green) and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III Design Control, was identified by the inspectors for the licensees failure to translate the design bases into design drawings, procedures and appropriate test instructions. Specifically, the design basis requirements for Agastat Time Delay Relays (TDR) settings, as well as vendor tolerances, were not accurately reflected in the design drawings, procedures and test instructions for numerous TDR calibrations. This issue was entered into the licensees corrective action program. The inspectors determined that the finding was more than minor because it was associated with the Mitigating System Cornerstone attribute of Design Control, and affected the cornerstone objective of ensuring the capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, failure to ensure that safety-related TDRs would operate, within the design specified setpoints and allowed tolerances, could lead to the inability of safety-related systems and components to respond to design basis events (e.g., during load sequencing onto the EDG). The finding screened as being of very low safety-significance because the finding was a design or qualification deficiency confirmed not to result in loss of operability or functionality. Specifically, the licensees subsequent evaluation of the TDRs tolerances showed that available margin remained for satisfactory completion of the required safety function. This finding has an associated cross-cutting aspect in the area of problem identification and resolution because the licensee did not incorporate operating experience (OE)information, including internally generated lessons learned, to support plant safety. Specifically, even though the licensee was aware of the potential inadequacies of the Agastat TDR setpoints through internal OE, the licensee failed to adequately respond to the OE by implementing appropriate changes to station processes, procedures, equipment, and training program. P.2.(b) |
Site: | Palisades |
---|---|
Report | IR 05000255/2009006 Section 1R17 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.17 |
Inspectors (proximate) | A Dunlop Z Falevits R Daley J Gilliam |
CCA | P.5, Operating Experience |
INPO aspect | CL.1 |
' | |