| | Q | CCA | Title |
|---|
| 05000244/FIN-2009006-02 | 2009Q4 | | Post-Fire Safe Shutdown From Outside Main Control Room (Alternative Shutdown) and Normal Shutdown |
| 05000244/FIN-2009005-03 | 2009Q4 | | Inadequate Selection of Alternating Current-Powered Relays in Control Room Emergency Air Treatment System Fan Control Logic |
| 05000244/FIN-2009005-01 | 2009Q4 | | Failure to Demonstrate the Performance of the Diesel Air Compressor was Being Effectively Controlled Through Preventive Maintenance |
| 05000244/FIN-2009005-02 | 2009Q4 | H.8 | Failure to Correctly Implement Containment Closeout Procedure |
| 05000244/FIN-2010006-01 | 2010Q2 | P.3 | Failure to Take Adequate Corrective Actions for Elevated Chlorides in the A EDG Jacket Water Heat Exchanger |
| 05000244/FIN-2010010-01 | 2010Q3 | | Deliberately Providing Inappropriate Assistance During General Employee Training |
| 05000244/FIN-2010004-02 | 2010Q3 | P.2 | Failure to Identify Five Pumps in the Inservice Testing Alert Range |
| 05000244/FIN-2010004-01 | 2010Q3 | H.4 H.5 | Failure to Adequately Assess the Risk of Technical Support Center Inverter Maintenance |
| 05000244/FIN-2010403-01 | 2010Q3 | H.5 | Security |