05000219/LER-2009-005, Regarding Reactor Scram Following a Transmission Line Lightning Strike

From kanterella
Jump to navigation Jump to search
Regarding Reactor Scram Following a Transmission Line Lightning Strike
ML092590061
Person / Time
Site: Oyster Creek
Issue date: 09/10/2009
From: Massaro M
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-09-070 LER 09-005-00
Download: ML092590061 (4)


LER-2009-005, Regarding Reactor Scram Following a Transmission Line Lightning Strike
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2192009005R00 - NRC Website

text

Exelkn Oyster Creek Generating Station www.exeloncorp.com Route 9 South Nuclear PO Box 388 Forked River, NJ 08731 RA-09-070 10 CFR 50.73 September 10, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

Licensee Event Report (LER) 2009-005-00, Reactor Scram Following a Transmission Line Lightning Strike Enclosed is LER 2009-005-00, Reactor Scram Following a Transmission Line Lightning Strike. This event did not affect the health and safety of the public or plant personnel.

This event did not result in a safety system functional failure. There are no regulatory commitments made in this LER submittal. The detailed analysis of the event, determination of the cause of the affected transmission line breaker failure and circumstances surrounding the event is being investigated and will be reported in a supplement to this LER.

Should you have any questions concerning this letter, please contact Richard Milos, Regulatory Assurance, at (609) 971-4973.

Respectfully, Michael J. Massaro Vice President Oyster Creek Nuclear Generating Station Enclosure: NRC Form 366, LER 2009-005-00 cc:

Administrator, NRC Region 1 NRC Senior Resident Inspector - Oyster Creek Nuclear Generating Station NRC Project Manager - Oyster Creek Nuclear Generating Station

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 08/31/2010 (9-2007)

, the NRC may digits/characters for each block) not conduct or sponsor, and a person is not required to respond to, the information collection.

13. PAGE Oyster Creek, Unit 1 05000219 1 OF 3
4. TITLE Reactor Scram Following a Transmission Line Lightning Strike
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL I REV MONTH DAY YEAR N/A O

N/A FACILITY NAME DJOCKET NUMBER 07 12 2009 2009 005 -

00 09 10 2009 N/A N/A

9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)

[1 20.2201(b)

El 20.2203(a)(3)(i)

El 50.73(a)(2)(i)(C)

El 50.73(a)(2)(vii)

N El 20.2201(d)

El 20.2203(a)(3)(ii)

El 50.73(a)(2)(ii)(A)

[I 50.73(a)(2)(viii)(A)

El 20.2203(a)(1)

El 20.2203(a)(4)

[I 50.73(a)(2)(ii)(B)

El 50.73(a)(2)(viii)(B)

[I 20.2203(a)(2)(i)

El 50.36(c)(1)(i)(A)

C3 50.73(a)(2)(iii)

El 50.73(a)(2)(ix)(A)

10. POWER LEVEL [I 20.2203(a)(2)(ii)

[- 50.36(c)(1)(ii)(A) 9 50.73(a)(2)(iv)(A)

El 50.73(a)(2)(x)

El 20.2203(a)(2)(iii)

[I 50.36(c)(2)

E3 50.73(a)(2)(v)(A)

E3 73.71 (a)(4) 100

[] 20.2203(a)(2)(iv)

El 50.46(a)(3)(ii)

El 50.73(a)(2)(v)(B)

El 73.71 (a)(5)

El 20.2203(a)(2)(v)

El 50.73(a)(2)(i)(A)

El 50.73(a)(2)(v)(C)

[E OTHER El 20.2203(a)(2)(vi)

[I 50.73(a)(2)(i)(B)

Cl 50.73(a)(2)(v)(D)

Specify in Abstract below or in

Corrective Actions

The detailed analysis and cause determination is still under investigation. Complete descriptions of corrective actions will be included in a Supplemental LER.

Corrective actions taken to date include, restoring the EDG

  1. 1 to full operable status, flushing the "B" IC level indication lines and repairing the Q-121 line breaker. These actions addressed the anomalies noted above.

The Q-121 line breaker was repaired by First Energy. Any lessons learned from that repair and the cause determination will be placed in Oyster Creek's corrective action program database.

Previous Occurrences

There have been no similar LERs submitted due to lightning strikes at Oyster Creek in the last three years.

However, there was a lighting strike in June 2009 on the Q-121 transmission line, which resulted in a less severe grid disturbance and no plant scram occurred.

Component Failure Data

Component: Transmission Line Breaker Manufacturer: General Electric Serial No: NA

Cause

Trip Coil MisalignedPRINTED ON RECYCLED PAPERPRiNTED ON RECYCLED PAPER