Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML19045A28215 February 2019R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies
ML16228A06215 August 2016Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin
ML16124A03814 July 2016Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML15154B33218 June 2015Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
L-14-032, August 2014 Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 August 2014August 2014 Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14176A12916 May 2014Clarification to April 7, 2014 Supplement to Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14069A31827 February 2014February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14007A70419 February 2014R. E. Ginna Nuclear Power Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML13254A27827 August 2013Clavert Cliffs, Units 1 & 2, R.E. Ginna, Nine Mile Point, Units 1 & 2, Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Exter
ML13074A0568 March 2013Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13073A1558 March 2013Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13066A17128 February 2013R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13066A17228 February 2013R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML11237A00725 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/1125 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML0834600514 December 2008R. E. Ginna Nuclear Power Plant - License Amendment Request: Revision of Tech Spec. 3.9.3 to Allow Refueling Operations Inside Containment with Both Personnel Hatch Air Lock Doors Open Under Administrative Control, and Obtain Regulatory Rev
ML06094031224 March 2006R. E. Ginna - Response to BOP Systems Questions Discussed on March 2, 2006 Conference Call
ML05032049125 February 2005Issuance of Amendment Modification of the Control Room Emergency Air Treatment System
ML0419703838 July 2004Response to Request for Additional Information (RAI) Dated June 9, 2004, Regarding Proposed Control Room Emergency Air Treatment System (Creats) Modification and Change in Dose Calculation Methodology to Alternate Source Term
ML0416103569 June 2004R. E. Ginna Nuclear Power Plant, RAI, Control Room Emergency Air Treatment System Modification
ML04121100322 April 2004R. E. Ginna Nuclear Power Plant, Design Information for the Proposed Control Room Emergency Air Treatment System (Creats) Modification
ML0228200488 October 2002Slides and Viewgraphs of September 24, 2002, Summary of Meeting with Rochester Gas and Electric Corporation Proposed Digital Upgrades to the Emergency Control Room Air Treatment System Actuation Instrumentation
ML02212024928 August 2002R. E. Ginna Nuclear Power Plant, Request for Additional Information, License Amendment Request Relating to the Control Room Emergency Air Treatment System Actuation Circuitry
ML17309A53231 July 19931993 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1992 - Jul 1993. W/ 931203 Ltr
ML17262A71126 December 1991Responds to Suppl 4 to Generic Ltr 88-20, Individual Plant Exam of External Events for Severe Accident Vulnerabilities. Fire PRA Will Be Performed Using Guidance in NUREG/CR-1407 & NUREG/CR-2300
ML17261A48626 May 1987Responds to 870324 SER on Structural Upgrade Program.Bulk of Mods Re SEP Topics II-3.A,III-2,III-4.A,III-6 & III-7.B Will Be Completed as of Dec 1988.Resolution of Issues Will Serve to Document Completion of Agreements Reached During SEP
ML17254A93427 August 1984Forwards Responses to NRC Questions Re 840402 Application for Amend to License DPR-18.Response Provides Statement Whether Spent Fuel Pool Liner Would Be Perforated as Result of Failure of Bottom Plate Welds
ML17256A74227 May 1983Forwards Info & Rept Re SEP Topic III-7.B, Design Codes, Design Criteria & Load Combinations. as Result of Review, Util Has Identified Two Commitments Re Scupper Installation & Diesel Generator Bldg Concrete Walls
ML17256A74523 May 1983Evaluation of Concrete Code Changes, 'Design Codes,Design Criteria & Load Combinations' Portion of USNRC SEP Topic III-7.B.
ML17256A63711 April 1983Forwards Responses to SEP Topics III-1,III-6 & IX-3 Re Tanks.Some Seismic Upgrading of Sodium Hydroxide Tank Warranted.Mod Will Be Completed During 1984 Refueling Outage
ML17256A7088 March 1983App C to Structural Reanalysis Program, Utility Pole Tornado Missile Trajectory Analysis.
ML17256A88029 April 1982Proposes That SEP Topics II-2.A,III-2,III-4.A & III-7.B Be Consolidated in One Overall Structural Review of Plant.Also Proposes,Where Review of Topics Affects Resolution of Related Topics,Evaluation Be Coordinated
ML17258A56818 February 1982Responds to Draft Safety Evaluation for SEP Topic III-4.A, Tornado Missiles.Specified 250-mph Tornado Too Conservative. Suitable Tornado Velocity to Be Included in Review of SEP Topic III-2,wind & Tornado Loadings
ML17258A45114 January 1982Responds to 810107 Request for Evaluation of Refueling Water Storage Tank Per SEP Topics III-6 & III-11, Seismic Design Considerations. Review of Other SEP Topics Could Influence Final Mod.Implementation Schedule Will Follow
ML17257A53813 August 1981Advises That NRC 810707 Ltr Criticizing Poor Quality of licensee-generated SEP Topic Assessments Is Not Applicable to Util.Forwards NRC 810630 Status Summary Rept for SEP, NUREG-0485,indicating Status of Util SEP Topics as of 810801
ML17249A79521 March 1980Responds to NRC 800214 Ltr Requesting Refs for 35 SEP Topics.Forwards Internal Memos Re Review
ML17261A14914 November 1979Forwards Response to 790801 Ltr Requesting Info on SEP Structural Topics III-2,III-3.A & III-7.B.Relevant Articles from Ny State Bldg Const Code & Subcontracter 1966-67 Tech Specs Encl
ML18143A44828 July 1978R. E. Ginna - Response to Letter of 6/21/1978. Additional Information About Standby Auxiliary Feedwater System Attached
ML17258A5705 August 1976Forwards Responses to Questions Posed at 760521 Meeting Re Spent Fuel Pool Mod