ML17258A451
| ML17258A451 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/14/1982 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| TASK-03-02, TASK-03-04.A, TASK-03-06, TASK-03-11, TASK-3-11, TASK-3-2, TASK-3-4.A, TASK-3-6, TASK-RR NUDOCS 8201190146 | |
| Download: ML17258A451 (4) | |
Text
lf REGULAIT+lf, IAVFORMA~TION DrISTRIBUTlIOL STEiUl'RIDS)
A C C KS S I 0>>V>>
iV8 R 8 2.0 1 1 9 0 1.4'6 D0 C l D A.T K'.
82'/ 0 1 / 1 0'V0 IT'AR I Z KD' O'OCKElTr tl.
F'ACILl:50 244 Rbpert>> KlnmetI Glinnai iVuclea'r Pilant'E Un4 tI 1E Rochester Gl 05000244
'UTH ~ N A>>%El AUTHOR'FFilLlIAiTION MAIKREJ;Er..
Ror:hester:
Ghs L ElectricI C'oro; REC'IPT,>>VA>>4lEl RKClIPiIKlViTlAFFTILlIATION CR1JTCHF>>IKLD'ED.',oera.tiing Reactors Br ahch 5>>
SUBJEClT:
Resoonds tol 8'10107 r equest for ever) uati'op>>
olf>> refuel ing ~ster stoir aige tank per SKPr Topics IIIP b" L III'>>1E "Seismfc>> Design(
C'onsi'deralt i orle.,"" Revi es of other. SEP topi ce-could influence' inail'old;Imoilementati'on>> schedul e
wi lil follilow.,
DISTRISUTIOR'ODES, ADZSS COP~IES'ECEIVED:LITR L< ENCLI 0 SIZE'ITLE::
Seismic,'eview for" SKPr P'lants
~
NOTES:1, copy:SKPr Sect;, LUr;,
05000244 R EClIPIIKPJlTl ID COD KT/>>VA,'>>iEI ACiT'ION:.
ORB= 05'. BCl 01>>
INTERNALl: El.D, NRR'/DKI/KQBr 1Sr NRR/DK'/HGKBi 18" PBr 14 RGFil 04'DPiI ES LlTiTR ENCL) 1>>
1 2:
1.
1>>
RECiI P>>IENiTl IDl CODE'/iV'Ai~iKl I El 12, NRR/DE'/GB>>
1.7 NRR/DLT/DRAB<
NRR/DST/GI3r 16.
COPIKS'lTTR KNCl.l 2',
1 1;
EXTKRiVALit ACRS NRCr PDR, 2.0 02 1,0 1
11*
3P 0
TOTAL( NURSER OP>> COPEES REQUIRED.:
LITTR
~
ERCLI
lf 1I If I'
ZZtseiZZ Zts(ti<ZI u7i sss uzsztu'OCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER. N.Y I ~~~9 I
JOHN E. MAILER Wce PresIOent T
N Ac@A oh' January 14, 1982 (
Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
SEP Topics III-6 and III-ll, "Seismic Design Considerations" R.
E. Ginna Nuclear Power Plant Docket, No. 50-244
Dear Mr. Crutchfield:
We have evaluated the Refueling Water Storage Tank as required by your letter dated January 7,
1981 (open issue C5) and as addressed in our response dated March 23, 1981.
Our structural analysis, utilizing the very conservative assumptions of Regulatory Guide 1.60 for response spectrum and Regulatory Guide 1.61 for damping values, indicates overstresses in the tank wall, attach-ment bracket, and anchor bolts.
An earlier analysis of the
- RWST, transmitted via a letter from Leon D. White, Jr. to Dennis L. Ziemann dated February 12,
Nevertheless, modifi-cations will be made to the RWST design to upgrade into more current criteria.
Rochester Gas and Electric is not at this time able to make a commitment regarding the exact nature of the modification, nor the time schedule.
As part of the
- SEP, the review of certain other topics could influence the final modification.
These topics include III-4.A, "Tornado Missiles" and III-2, "Wind and Tornado Loadings."
In keeping with the philosophy of the Systematic Evaluation
- Program, RGRE will define modifications to the RWST, addressing seismic as well as other considerations of differences from current criteria, during the course of the Ginna Integrated Assessment.
Following the definition of the integrated modifications, a schedule for implementation will be proposed.
('OOIS9OIe DR gggcg 820iiy 0>00Op44 PDp Very truly yours, POTS le