Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000277/2023011 | 15 August 2023 | Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 |
ML23110A191 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 14, Figures |
ML23110A246 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, PEA Chapter 00, Cover Page and General Table of Contents |
ML23172A275 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix a, Table of Contents - Redacted |
ML23173A037 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted |
ML23173A033 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted |
ML23110A219 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Sections 1 Thru 8 |
ML23110A197 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria |
ML23110A180 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 2, Site, Table of Contents |
ML23110A228 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3 |
ML23110A167 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 11, Power Conversion Systems, Sections 1 Thru 8 |
ML23110A193 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents |
ML23173A057 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted |
ML23173A059 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted |
ML23173A040 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted |
ML23173A056 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted |
ML23173A038 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted |
ML23110A172 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix Q, License Renewal UFSAR Supplement |
ML23110A253 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8 |
ML23173A013 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted |
ML23173A043 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted |
ML23173A017 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted |
ML23110A256 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML23110A223 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis |
ML23173A015 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Sections 1 Thru 10 - Redacted |
ML23062A211 | 31 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts, Table of Contents (Redacted) |
ML23062A420 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 Thru 24 (Redacted) |
ML23062A429 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts (Redacted) |
ML23062A430 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 2, Sections 1 Through 9. (Redacted) |
ML23062A217 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 14, Sections 1 Through 10. (Redacted) |
ML23062A419 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted) |
ML23062A220 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23 (Redacted) |
ML23062A427 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9 (Redacted) |
ML23062A426 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Through 8 (Redacted) |
ML23062A216 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 12, Sections 1 Through 4 (Redacted) |
ML23062A417 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns (Redacted) |
ML23062A428 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted) |
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2023 | Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML22304A048 | 31 October 2022 | Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection |
IR 05000277/2022002 | 28 July 2022 | Integrated Inspection Report 05000277/2022002 and 05000278/2022002 |
IR 05000277/2022011 | 18 May 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011 |
ML22090A086 | 29 April 2022 | Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position |
IR 05000482/2022001 | 25 April 2022 | Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 |
ML22021B660 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 |
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2022 | Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 |
ML21277A193 | 16 November 2021 | Enclosure 2, Draft Conforming License Amendments |
IR 05000482/2021003 | 5 November 2021 | Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
IR 05000277/2021010 | 20 July 2021 | Triennial Fire Protection Inspection Report 05000277/2021010 and 05000278/2021010 |
ML21074A411 | 14 May 2021 | Issuance of Amendment Nos. 338 and 341, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4B |