Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000277/202301115 August 2023Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011
ML23110A19110 April 20239 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML23110A24610 April 20239 to Updated Final Safety Analysis Report, PEA Chapter 00, Cover Page and General Table of Contents
ML23172A27510 April 20239 to Updated Final Safety Analysis Report, Appendix a, Table of Contents - Redacted
ML23173A03710 April 20239 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted
ML23173A03310 April 20239 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted
ML23110A21910 April 20239 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Sections 1 Thru 8
ML23110A19710 April 20239 to Updated Final Safety Analysis Report, Appendix H, Conformance to AEC (NRC) Criteria
ML23110A18010 April 20239 to Updated Final Safety Analysis Report, Chapter 2, Site, Table of Contents
ML23110A22810 April 20239 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3
ML23110A16710 April 20239 to Updated Final Safety Analysis Report, Chapter 11, Power Conversion Systems, Sections 1 Thru 8
ML23110A19310 April 20239 to Updated Final Safety Analysis Report, Chapter 14, Table of Contents
ML23173A05710 April 20239 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted
ML23173A05910 April 20239 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted
ML23173A04010 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted
ML23173A05610 April 20239 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted
ML23173A03810 April 20239 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted
ML23110A17210 April 20239 to Updated Final Safety Analysis Report, Appendix Q, License Renewal UFSAR Supplement
ML23110A25310 April 20239 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8
ML23173A01310 April 20239 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted
ML23173A04310 April 20239 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted
ML23173A01710 April 20239 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted
ML23110A25610 April 20239 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML23110A22310 April 20239 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis
ML23173A01510 April 20239 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Sections 1 Thru 10 - Redacted
ML23062A21131 March 20238 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts, Table of Contents (Redacted)
ML23062A4203 March 20238 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 Thru 24 (Redacted)
ML23062A4293 March 20238 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts (Redacted)
ML23062A4303 March 20238 to Updated Final Safety Analysis Report, Chapter 2, Sections 1 Through 9. (Redacted)
ML23062A2173 March 20238 to Updated Final Safety Analysis Report, Chapter 14, Sections 1 Through 10. (Redacted)
ML23062A4193 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted)
ML23062A2203 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Through 23 (Redacted)
ML23062A4273 March 20238 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 9 (Redacted)
ML23062A4263 March 20238 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Through 8 (Redacted)
ML23062A2163 March 20238 to Updated Final Safety Analysis Report, Chapter 12, Sections 1 Through 4 (Redacted)
ML23062A4173 March 20238 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns (Redacted)
ML23062A4283 March 20238 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted)
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2023Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML22304A04831 October 2022Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection
IR 05000277/202200228 July 2022Integrated Inspection Report 05000277/2022002 and 05000278/2022002
IR 05000277/202201118 May 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011
ML22090A08629 April 2022Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position
IR 05000482/202200125 April 2022Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-1031 January 2022Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
IR 05000482/20210035 November 2021Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
IR 05000277/202101020 July 2021Triennial Fire Protection Inspection Report 05000277/2021010 and 05000278/2021010
ML21074A41114 May 2021Issuance of Amendment Nos. 338 and 341, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4B