Issue date | Title | |
---|---|---|
NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems | 6 December 2023 | Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems |
ML23206A041 | 2 August 2023 | SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 |
ML23206A053 | 25 July 2023 | 2A, Exam Draft Items (Hatch 2021-301) |
ML22297A146 | 22 December 2022 | Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS |
NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable | 30 November 2022 | Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable |
IR 05000366/2022003 | 8 November 2022 | Integrated Inspection Report 05000321 /2022003 and 05000366/2022003 |
NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten | 18 August 2022 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten |
ML22200A043 | 22 July 2022 | Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear |
IR 05000321/2022011 | 13 July 2022 | Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011 |
ML22167A140 | 22 June 2022 | Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment |
NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 | 31 March 2022 | License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 |
ML22073A084 | 21 March 2022 | an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information |
NL-21-0576, Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 26 October 2021 | Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
ML21264A644 | 24 September 2021 | Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) |
NL-21-0852, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable | 21 September 2021 | Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable |
IR 05000321/2021011 | 25 June 2021 | Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021011 and 05000366/2021011 |
ML20303A186 | 29 September 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5 Through Chapter 7 |
ML20303A183 | 29 September 2020 | Rev. 117 to Technical Requirements Manual, Unit 1, Part 1 |
ML20303A180 | 29 September 2020 | Rev. 123 to Technical Requirement Manual, Unit 2 |
ML20254A075 | 18 September 2020 | Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 307 to Facility Operating License No. DPR-57 and Amendment No. 252 to Facility Operating License No. NPF-5 |
ML20254A057 | 18 September 2020 | Issuance of Amendments Nos. 307 and 252, Regarding License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC (Alternating Current) Sources - Operating, |
NL-20-1000, Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time | 23 August 2020 | Responses to NRC Requests for Additional Information to License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time |
NL-20-0843, License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time for Unit 1 and Swing Emergency Diesel Generators | 31 July 2020 | License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time for Unit 1 and Swing Emergency Diesel Generators |
ML20077J704 | 26 June 2020 | Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
ML20066F592 | 11 June 2020 | Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) |
ML20149K625 | 27 May 2020 | NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests |
NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval | 9 December 2019 | Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval |
NL-19-1455, Emergency License Amendment Request for Technical Specification 3.7.1 Regarding One-Time Extension of Completion Time for RHRSW Pump Inoperable | 29 November 2019 | Emergency License Amendment Request for Technical Specification 3.7.1 Regarding One-Time Extension of Completion Time for RHRSW Pump Inoperable |
NL-19-1203, Response to Request to Additional Information Regarding Application to Adopt National Fire Protection Association Standard 805 | 7 October 2019 | Response to Request to Additional Information Regarding Application to Adopt National Fire Protection Association Standard 805 |
ML19220A036 | 8 August 2019 | NRR E-mail Capture - RAI - Edwin I. Hatch Nuclear Plant, LAR Regarding Adoption of NFPA 805, Request for Additional Information, EPID L-2018-LLA-0107 |
NL-19-0850, Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and ... | 16 July 2019 | Response to Request for Addition Information Regarding Application to Adopt Title 10 of Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and ... |
NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update | 2 April 2019 | Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update |
ML19088A009 | 29 March 2019 | NRR E-mail Capture - Hatch 1 and 2 - LAR to Adopt NFPA 805 Fire Protection Standard, EPID L-2018-LLA-0107, Request for Additional Information |
ML19053A093 | 22 February 2019 | Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) |
IR 05000021/2019011 | 13 February 2019 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) |
ML19044A600 | 13 February 2019 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) |
IR 05000321/2018004 | 13 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000321/2018004 and 05000366/2018004 |
ML19010A009 | 28 January 2019 | Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation |
ML19018A231 | 23 January 2019 | Edwin Hatch 1 & 2 - Regulatory Audit in Support of the License Amendment Requests to Implement a Risk-Informed, Performance-based, Fire Protection Program |
ML19029B340 | 23 January 2019 | Southern Nuclear Operating Company, Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Draft Request for Additional Information for the License Amendment Requests to Adopt the Risk-Informed Provisions of Title 10 of the Code of Federal Regulat |
NL-18-1333, Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 12 November 2018 | Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
ML18278A280 | 10 October 2018 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 |
ML18222A296 | 29 August 2018 | Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) |
ML18228A835 | 22 August 2018 | Online Reference Portal for License Amendment Request to Adopt National Fire Protection Association Standard 805 |
IR 05000321/2018002 | 10 August 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000321/2018002 and 05000366/2018002 |
ML18226A094 | 9 August 2018 | Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables |
NL-17-1962, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. | 7 June 2018 | Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. |
NL-17-1089, Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis | 10 April 2018 | Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis |
ML18226A095 | 10 April 2018 | Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis |
NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis | 10 April 2018 | Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis |