Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23067A0821 November 2023Enclosure 2 - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Safety Exemption Evaluation for Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50
ML22332A04822 November 2022New York State Alyse Peterson Comments on Completion of Emergency Planning Nd License Amendment Request Prior to Spent Fuel Transfer from Spent Fuel Pools to Casts (Dockets 50-003, 50-247, 50-286)
ML22257A12714 September 2022Biennial Defueled Safety Analysis Report Update, and Regulatory Commitment Change Summary - September 2020 to September 2022
ML20259A20114 September 2020Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes
ML20259A20414 September 2020Defueled Safety Analysis Report, Chapter 3, Facility Design and Operation
NL-20-012, Application to Revise Provisional Operating License and Technical Specifications30 June 2020Application to Revise Provisional Operating License and Technical Specifications
NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device24 March 2020Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device
ML17222A2394 October 2017NRC Response to Request for Deferral of Actions Related to Beyond-Design-Basis Seismic and Flooding Hazard Reevaluations
ML17188A3387 July 2017Public Comments on Indian Point License Renewal L13 - Comment of John Sipos
ML17065A17127 March 2017Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16280A21219 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System
ML16280A16619 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System
ML16280A20619 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems
ML16280A19019 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems
NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System19 September 2016Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System
ML16293A00312 August 2016Lr Hearing - Please Put in ADAMS Document No. NSAL-16-1, Westinghouse Nuclear Safety Advisory Letter, Baffle-Former Bolts
ML16223A5639 August 2016Lr Hearing - (External_Sender) Transmittal of Revised Westinghouse NSAL-16-1, Revision 1, Baffle-Former Bolts
ML16196A2458 July 2016Lr Hearing - Westinghouse Nuclear Safety Advisory Letter on Baffle-Former Bolts
ML16177A0188 June 2016Lr Hearing - (External_Sender) Ucs Bolt Assessment of Operability
ML16163A1068 June 2016Lr Hearing - FW: Ucs Bolt Assessment of Operability
ML16069A0674 March 2016Comment (13) of John Sipos Regarding Renewal of Operating Licenses for Indian Point Units 2 and 3
ML16061A3012 March 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016
NRC-2011-0189, Comment (20) of Michel Lee on Behalf of the Indian Point Safe Energy Coalition on the Proposed Rule for 10 CFR Parts 50 and 52 - Mitigation of Beyond-Design-Basis Events11 February 2016Comment (20) of Michel Lee on Behalf of the Indian Point Safe Energy Coalition on the Proposed Rule for 10 CFR Parts 50 and 52 - Mitigation of Beyond-Design-Basis Events
ML15293A58520 October 2015NYS Brief in Support of Appeal of LBP-15-26
ML16057A54820 October 2015NYS Exhibit 11 on NYS Brief Supporting Appeal
ML15232A66715 September 2015Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementating Near Term Task Force
ML15231A39212 August 2015NRR E-mail Capture - Indian Point Nuclear Generating Units 2 and 3 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC NO.MF5245 and MF5246)
ML15334A22810 August 2015Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts)
ML15222A83010 August 2015ENT000634 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts)
ML15337A31810 August 2015Official Exhibit - ENT000679-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fat
ML15223A77910 August 2015NRC000224 - IP3 FSAR Rev. 04 Chapter 16
ML15337A25910 August 2015Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16
ML15261A83310 August 2015ENT000679 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fatigue) (Aug. 10, 2015)
ML15337A28130 June 2015Official Exhibit - NYS000565-00-BD01 - Technical Letter Report on Literature Review and Assessment of Potential Seismic Effects on Ongoing Material Degradation Tensile Strength, Fracture Toughness and Physical Properties (Published June 20
ML15252A44230 June 2015NYS000565 - Technical Letter Report on Literature Review and Assessment of Potential Seismic Effects on Ongoing Material Degradation Tensile Strength, Fracture Toughness and Physical Properties (Published June 2015)
NL-15-081, Additional Information Regarding Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review Of..25 June 2015Additional Information Regarding Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review Of..
ML15161A3009 June 2015NYS000481 - Revised Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (June 9, 2015)
ML15334A2129 June 2015Official Exhibit - NYS000481-PUB-00-BD01 - Revised Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (June 9, 2015)
ML15148A3761 June 2015Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015
ML15138A41518 May 2015NYS Petition to Intervene and Request for Hearing W Cos
ML16057A53618 May 2015NYS Exhibit 3 on Petition to Intervene and Request for Hearing
ML15096A3407 May 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations for Recommendation 2.1, Seismic, of the NTTF Review of Insights from the Fukushima Dai-Ichi Accident
ML15055A51220 February 2015Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years
IR 05000247/20140055 February 2015IR 05000247-14-005, 05000286-14-005; 10/01/2014 - 12/31/2014; Indian Point Nuclear Generating (Indian Point), Units 2 and 3; Licensed Operator Requalification Program
NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...22 December 2014Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From...
ML14197A58318 September 2014Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1
ML14287A34617 September 2014Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Auxiliary and Emergency Systems