Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000280/20220041 September 2023Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004
ML23041A02313 February 2023Integrated Inspection Report 05000280/2022004 and 05000281/2022004
ML22188A08123 June 2022ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report
IR 05000280/202100212 August 2021Integrated Inspection Report 05000280/2021002 and 05000281/2021002
ML21168A33917 June 2021Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report
ML21106A2794 May 2021Technical Specifications
ML21210A13830 September 20202 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards (EPID L-2020-LRO-0076) - Redacted
ML21208A42930 September 20202 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Epids L-2020-LRO-0076) - Redacted
ML21210A13530 September 20202 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted
IR 05000280/202000210 August 2020Integrated Inspection Report 05000280/2020002 and 05000281/2020002 and Exercise of Enforcement Discretion
ML20182A69229 June 2020& ISFSI, Millstone Power Station, Units 1, 2 3, & ISFSI, North Anna Power Station, Units 1, 2 & ISFSI, Virgil C. Summer Station, Surry Power Station, Units 1 & 2 and ISFSI - Submission of Revision 28 of the Quality Assurance.
ML19360A02027 December 2019SER 2019-12-23 for ADAMS
ML19204A35717 July 2019Subsequent License Renewal Application Response to Request for Additional Information - Set 2
ML19095A6022 April 2019Enclosure 2 - SLRA Mark-Ups Change Notice 2
IR 05000280/201800412 February 2019Nuclear Regulatory Commission Integrated Inspection Report 05000280/2018004 and 05000281/2018004
ML19042A13831 January 2019PWROG-17011-NP, Revision 2, Update for Subsequent License Renewal: WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination and WCAP-15666-A, Extension of Reactor Coolant Pump Motor Flywheel Examination.
ML19058A58327 September 2018UFSAR Chapter 14-18
ML18215A1253 August 2018U2 ISI SGI 2018004 - Notification of Inspection and RFI (Public)
IR 05000280/201800223 July 2018Nuclear Regulatory Commission Integrated Inspection Report 05000280/2018002 and 05000281/2018002
ML18291A83730 June 2018Enclosure 4, Attachment 2, ANP-3680NP, Revision 0, Topical Report
ML18159A0344 June 2018ASME Section XI Inservice Inspection Program, Relief Requests for Limited Coverage Examinations Performed in the First Period of the Fifth 10-Year Inservice Inspection Interval
ML18086A02921 March 2018ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the First Period of the Fifth 10-Year Inservice Inspection Interval
ML16365A11817 February 2017Requests for Relief LMT-R01, LMT-SS01, LMT-CS01, LMT-P01, LMT-C01, LMT-C02, LMT-C03, and LMT-C04 - for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval
ML16309A03627 October 2016Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in 4th 10-Year Inservice Inspection Interval
ML16208A00924 August 2016Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME Code
ML16188A1585 July 2016Notification of Inspection and Request for Information Dated 07/05/2016
ML16131A6355 May 2016ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Preformed in the Fourth 10-Year Insevice Inspection Interval
ML15293A1249 October 2015ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval
ML14233A51430 June 2014Redacted - Surry Power Station Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 20
ML14112A07311 April 2014Proposed License Amendment Request Relocation of Augmented Inspection Requirements from TS 4.2 and TS 4.15 to Technical Requirements Manual
ML14073A73013 March 2014Notification of Inspection and Request for Information
IR 05000280/201300510 February 2014IR 05000280-13-005, 05000281-13-005; 10/01/2013 - 12/31/2013; Surry Power Station, Units 1 and 2: Plant Modifications; Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
IR 05000280/201200331 July 2012IR 05000280-12-003 & 05000281-12-003; Virginia Electric and Power Company; 04/01/2012 - 06/30/2012; Surry Power Station, NRC Integrated Inspection Report
IR 05000280/200900528 January 2010IR 05000280-09-005, 05000281-09-005, on October 1, 2009 Through December 31, 2009, Surry Units 1 & 2 - NRC Integrated Inspection Report
ML0912806038 May 2009ASME Section XI Inservice Inspection Program Proposed Alternative to Code Requirements - SPT-008
IR 05000280/200800330 July 2008IR 05000280-08-003 & 05000281-08-003 on 04/01/2008 - 06/30/08 for Surry Power, Units 1 & 2
ML08072008911 March 2008Notification of Inspection and Request for Information
ML0806501943 March 2008Provision of Final Report Required by 10CFR21.21(d)(4) of Condition Identified by Transnuclear, Inc. as Failure to Comply with License Conditions for Certificate of Compliance for Spent Fuel Storage Casks, No. 1030
IR 05000280/200700531 January 2008IR 05000280-07-005, 05000281-07-005 on 10/01/2007- 12/31/2007 for Surry, Units 1 & 2, and Independent Spent Fuel Storage Installation; Fire Protection, Inservice Inspection Activities, Post-Maintenance Testing, and Other Activities
ML0800800604 January 2008Transnuclear, Inc. - Interim Report for a Failure to Comply Under the Provisions of 10CFR21
ML0731105195 November 2007Interim Report for a Failure to Comply Under the Provisions of 1OCFR21
ML07275034226 September 2007Notification of Potential Transnuclear Part 21 Re Dry Cask Canister Documentation Lost
ML07260014014 September 2007IR 05000280-07-006; 05000281-07-006; and 07200055-07-001, on 06/18/2007 - 08/03/2007, Surry Power Station Independent Spent Fuel Storage Installation (ISFSI) Dry Run and Initial Loading Inspection Report
ML07135035614 May 2007License Renewal Commitment, Pressurizer Surge Line Weld Inspection Plan Summary
IR 05000280/200600426 October 2006IR 05000280-06-004, IR 05000281-06-004, and IR 07200055-06-001, Virginia Electric and Power Company
ML0628301709 October 2006Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J
ML06209037527 July 2006ASME Section XI Inservice Inspection Program Relief Request CMP-007 Regenerative and Residual Heat Exchangers
IR 05000280/200600321 July 2006IR 05000280-06-003, IR 05000281-06-003; 04/01/2006 - 06/30/2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated Report
IR 05000280/200500421 October 2005IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance Effectiveness
ML05269031728 September 2005Relief Request, ASME Section XI ISI on Partial Examination (Tac No. MC4633, MC4634, MC4635, MC4636, MC4637)