Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center 2024-02-06
[Table view] |
Text
TRANSNUCLEAR AN AREVA COMPANY D 6C,, -
E-25976 Janua~ry 4, 2008 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Subject. Interim Report for a Failure to Comply under the Provisions of I1OCFR21
References:
- 1. Transnuclear Letter E-25576 to U. S. Nuclear Regulatory Commission, Evaluation of a Deviation for Notification under the Provisions of 10CFR2 1, dated 9/19/07.
- 2. Transnuclear Letter E-25623 to U. S. Nuclear Regulatory Commission, Notification of a Failure to Comply under the Provisions of I1OCFR2 1, dated 9/26/07.
- 3. Transnuclear Letter E-25784 to U. S. Nuclear Regulatory Commission, Interim Report for a Failure to Comply under the Provisions of I1OCFR21, dated 11/5/07.
- 4. Transnuclear Letter E-25967 to U. S. Nuclear Regulatory Commission, ASME Code Alternative Request, Temporary Welded Attachment Records, Docket 72-1030, dated 12/27/07.
To Whom It May Concern:
The purpose of this letter is to provide the staff with an interim report as discussed in Reference 3 and required per I1OCFR21.21(a)(2) of a condition identified by Trausnuclear, Inc. (TN) as a failure to comply with the license conditions for Certificate of Compliance for Spent Fuel Storage Casks, No. 1030 including Appendix A, NlJHOMS H-lD System Generic Technical Specifications. TN had initially identified and documented in Supplier Finding Report 2007-111 that our fabricator, GE-Hitachi Nuclear Energy Americas (GHNEA), had provided inadequate fabrication records resulting in a nonconforming condition relative to the possibility of undocumented Temporary Weld Attachments (TWAs) to the confinement boundary of a loaded NUHOMS 32PTH Dry Shielded Canister (DSC) at Surry Power Station (DSC S/N DOM-32PTH-00 I1-C).
This initial con dition reported as a failure to comply in Reference 2 involved a lack of documentation for use of qualified welders, approved welding procedures, approved weld filler material and compatible TWA base material, as well as a lack of the required liquid penetrant surface examination report subsequent to TWA removal. Such documentation is required per Article NB-4435 of the ASIVIE B&PV Code Section 111, which is a design feature embedded in the Technical Specifications for the NUHOMS HD license. Therefore, the nonconforming TWAs constituted a Code violation such that the affected canister was not compliant with the NUIHOMS HD Technical Specifications.
Subsequent to the initial extent of condition performed by our fabricator, TN identified an additional instance of a TWA application which was previously believed to have been isolated to a single DSC. Upon further investigation by our fabricator and extensive review by TN, it was concluded that undocumented TWAs had most likely been utilized on the surface of the inner bottom covers installed in DSC S/Ns DOM-32PTH-00 1-C and DOM-32PTH-003-C for fixturing purposes in support of machining operations. This determination resulted in a revised notification to the NRC Operations Center that undocumented TWAs were most likely installed on the inner bottom covers for DSCs S/N DOM-32PTH-00 I1-C and DOM-32PTH-003-C, currently loaded with spent fuel at the Surry Power Station.
This 120 day interim report is necessary such that TN can complete our evaluation including corrective actions-identified in Reference 2. TN has reconfmrined the extent of condition review for prior canisters fabricated-by GHNEA and has determined the reportable condition is limited to the two subject canisters loaded at Surry Power Station. In Reference 4 TN submitted to the NRC a request for exception to the ASME Code requirements for the subject loaded canisters. Pending NRC response to~this request, we expect to submit our final evaluation within 180 days of initial discovery, established as 9/7/07 in Reference 1.
(C(
7135 Minstrel Way, Suite 300 Columbia, Maryland 21045 Phone: 410-910-6900 Fax: 410-910-6902
TRANSNUCLEAR AN AREVA COMPANY Any questions you may have regarding this matter should be directed to Steven C. White, Director Corporate Quality Assurance at 410-910-6870.
Very truly yours, Tara Neider President Transnuclear Inc.
c: J. Davis (NRC) J. Bondre J. Boshoven P. Quinlan R. Grubb S. Petras S. White 7135 Minstrel Way, Suite 300 Columbia, Maryland 21045 Phone: 410-910-6900 Fax: 410-910-6902
TRANSNUCLEAR INC.
7135 Minstrel Way Suite 300 Columbia, MID 21045 AR EVA Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION 11555 Rockville Pike One White Flint North Rockville, MVD 20852