Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N30021 October 1999Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced FigureProcess Control Program
Fuel cladding
ML20217K87318 October 1999Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02
ML20212F69421 September 1999Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank
ML20211J02131 August 1999Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected SolutionScram Discharge Volume
Fuel cladding
ML20211B70518 August 1999Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRMShutdown Margin
Spiral reload
ML20211B67818 August 1999Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS SurveillanceTime of Discovery
Process Control Program
ML20210D24820 July 1999Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems
ML20210D33720 July 1999Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core FlowFuel cladding
ML20209G16712 July 1999Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 ValuesFuel cladding
ML20196K29529 June 1999Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves
ML20196H28824 June 1999Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass PermissivesScram Discharge Volume
Fuel cladding
ML20195J86915 June 1999Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TSScram Discharge Volume
Power change
ML20195F9539 June 1999Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01
ML20195C88426 May 1999Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases
ML20206H3776 May 1999Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4
ML20206J7235 May 1999Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC SysShutdown Margin
ML20205S94320 April 1999Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range MonitorShutdown Margin
Spiral reload
ML20205T47219 April 1999Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208
ML20205S40816 April 1999Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01
ML20205S31215 April 1999Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative CalculationFuel cladding
ML20202E54525 January 1999Proposed Tech Specs Re Technical Requirements Manual Content
ML20206S06622 January 1999Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRMSafe Shutdown
Process Control Program
Fire Protection Program
Fire Watch
ML20198D53815 December 1998Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160
ML20198B74211 December 1998Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACsSafe Shutdown
Process Control Program
ML20197J46310 December 1998Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors
ML20197H0037 December 1998Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant OperationSafe Shutdown
Process Control Program
ML20155F7423 November 1998Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or ApplicationReactor Vessel Water Level
Scram Discharge Volume
Fuel cladding
Power change
ML20155G5062 November 1998Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements
ML20151U0134 September 1998Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies
ML20236H45530 June 1998Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement
ML20247E5678 May 1998Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202Shutdown Margin
ML20247J8128 May 1998Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool
ML20217P4171 May 1998Proposed Tech Specs Re Administrative Controls SectionSafe Shutdown
Shutdown Margin
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML20217G71323 April 1998Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements
ML20217C45920 March 1998Proposed Tech Specs Re Containment Purge & Vent
ML20217A12713 March 1998Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage
ML20202H2616 February 1998Revised TS Pages Re Change 190,w/typos CorrectedPower Operated Valves
ML20197E84822 December 1997Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial ChangesPower Operated Valves
ML20203F01311 December 1997Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating CycleFuel cladding
ML20199K85021 November 1997Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies
ML20199J76620 November 1997Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries
ML20217H69310 October 1997Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources
ML20211A64618 September 1997Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193Shutdown Margin
Fire Barrier
Annual Radioactive Effluent Release Report
Continuous fire watch
Fire Watch
Early Warning Fire Detection
ML20217Q33122 August 1997Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression SysFire Barrier
Continuous fire watch
Fire Watch
Early Warning Fire Detection
ML20217N41120 August 1997Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLRShutdown Margin
Annual Radioactive Effluent Release Report
ML20141H11711 July 1997Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected PagesPower Operated Valves
ML20148J1869 June 1997Proposed Tech Specs Change 191,updating Section 6.0 Administrative ControlsShutdown Margin
Annual Radioactive Effluent Release Report
ML20132B57710 December 1996Proposed Tech Specs 3.13 Re Fire Protection SysSafe Shutdown
Fire Barrier
Fire Protection Program
Fire Watch
Early Warning Fire Detection
ML20129C45217 October 1996Proposed Tech Specs,Revising Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149Shutdown Margin
Overtravel
Fuel cladding
ML20128N60311 October 1996Proposed Tech Specs,Revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2