Start date | Title | Topic | |
---|---|---|---|
05000461/FIN-2017007-01 | 30 September 2017 23:59:59 | Failure to Evaluate Defeating Reactor Core Isolation Cooling System Interlocks and Trips before Adding Them to an Emergency Operating Support Procedure | Significance Determination Process |
05000461/FIN-2017003-02 | 30 September 2017 23:59:59 | Failure to Adequately Control Access in Locked High Radiation Area | High Radiation Area Locked High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000461/FIN-2017002-07 | 30 June 2017 23:59:59 | Root Cause Evaluation Failed to Identify Corrective Action to Preclude Repetition | |
05000461/FIN-2017001-04 | 31 March 2017 23:59:59 | Failure to Perform Maintenance on Residual Heat Removal Pump C Breaker in Accordance with Procedures | |
05000461/FIN-2016002-02 | 30 June 2016 23:59:59 | Inspection Fails to Identify Safety Related Cables Submerged in Cable Vault | Condition Adverse to Quality |
05000461/FIN-2016002-06 | 30 June 2016 23:59:59 | Failure to Perform Surface Examination Prior to Weld Repair of a Reactor Water Cleanup System Pipe | Significance Determination Process |
05000461/FIN-2016001-02 | 31 March 2016 23:59:59 | Operability Determination Failed to Examine Test Failures | Significance Determination Process Maintenance Rule Program |
05000461/FIN-2015003-01 | 30 September 2015 23:59:59 | Failure to Follow Procedure leaves Control Room Cabinet doors Unattended in Seismically Unanalyzed Condition | Unanalyzed Condition |
05000461/FIN-2015002-05 | 30 June 2015 23:59:59 | Failure to Evaluate the Operational Impact of the TDRFP Lockout Switch Position | Significance Determination Process |
05000461/FIN-2011004-06 | 30 September 2011 23:59:59 | Missing Respirator Spectacle Kits | Significance Determination Process |