05000482/FIN-2018002-02 | 2018Q2 | Wolf Creek | Failure to Maintain Adequate Pressurization of the Control Room Envelope | |
05000298/FIN-2018002-01 | 2018Q2 | Cooper | Failure to Maintain Alarm Procedure for Service Water Booster Pump Ventilation Manual Actions | |
05000528/FIN-2017404-01 | 2017Q4 | Palo Verde | Security | |
05000298/FIN-2017012-02 | 2017Q4 | Cooper | Inadequate Testing Activities for Emergency Transformer Bus | Significance Determination Process |
05000382/FIN-2017002-03 | 2017Q2 | Waterford | Failure to Ensure Appropriate Testing of TSP Baskets Inside Containment | Past operability Significance Determination Process |
05000275/FIN-2017002-01 | 2017Q2 | Diablo Canyon | Inadequate Expansion Scope of Risk - Informed Welds | Significance Determination Process |
05000285/FIN-2016004-01 | 2016Q4 | Fort Calhoun | Failure to Provide Training on Changes to Protective Action Recommendation Procedures | Significance Determination Process |
05000416/FIN-2016007-01 | 2016Q4 | Grand Gulf | Inadequate Technical Specification Surveillance Requirements for Reactor Protection System | Significance Determination Process Fuel cladding |
05000298/FIN-2016004-02 | 2016Q4 | Cooper | Failure of an Analysis to Demonstrate that Changes Did Not Reduce the Effectiveness of the Emergency Plan | Significance Determination Process |
05000368/FIN-2016009-03 | 2016Q2 | Arkansas Nuclear | Failure to Ensure that the Assumptions in the Engineering Analysis Remain Valid | Safe Shutdown Probabilistic Risk Assessment Significance Determination Process Fire Protection Program |
05000482/FIN-2016002-01 | 2016Q2 | Wolf Creek | Failure to Adequately Establish Control Room Air Conditioning System Testing Flow Rate Acceptance Criteria | Significance Determination Process |
05000498/FIN-2016007-07 | 2016Q1 | South Texas | Failure to Implement Administrative Controls for a Nonconservative Technical Specification of Standby Diesel Generator Frequency Variation | Condition Adverse to Quality Significance Determination Process |
05000313/FIN-2016007-14 | 2016Q1 | Arkansas Nuclear | Failure to Properly Implement the Corrective Action Program | Significance Determination Process |
05000285/FIN-2015012-01 | 2015Q4 | Fort Calhoun | Failure to Adequately Implement and Maintain Required NFPA 805 Implementation Items | Significance Determination Process Fire Protection Program |
05000285/FIN-2015012-03 | 2015Q4 | Fort Calhoun | Failure to Set Action Levels to Ensure that the Assumptions in the Engineering Analysis Remain Valid | Significance Determination Process Maintenance Rule Program Fire Protection Program |
05000458/FIN-2015004-02 | 2015Q4 | River Bend | Failure to Properly Implement Surveillance Testing of Penetration Valve Leakage Control System Leads to Inoperability in Excess of Technical Specification Allowed Outage Time | |
05000397/FIN-2015502-01 | 2015Q2 | Columbia | Failure to follow an emergency plan requirement to provide for a shelter as a protective action for the public | Significance Determination Process |
05000445/FIN-2015405-01 | 2015Q2 | Comanche Peak | Security | |
05000529/FIN-2015002-03 | 2015Q2 | Palo Verde | Failure to Identify and Correct Engineered Safety Features Actuation System Steam Generator Differential Pressure Setpoint Drift | |
05000285/FIN-2015001-01 | 2015Q1 | Fort Calhoun | Failure to Conduct and Evaluate Simulator Testing In Accordance with ANSI/ANS-3.5-2009 | Significance Determination Process |
05000285/FIN-2015001-02 | 2015Q1 | Fort Calhoun | Failure to Implement Risk Management Actions for Planned Maintenance Activities | Significance Determination Process |
05000298/FIN-2014004-02 | 2014Q3 | Cooper | Failure to Follow a Requirement of the Emergency Plan | Significance Determination Process |
05000298/FIN-2014202-01 | 2014Q3 | Cooper | Security | |
05000483/FIN-2014007-08 | 2014Q2 | Callaway | Inadequate Procedure for Cooling Instrumentation During a Station Blackout Event. | Significance Determination Process |
05000397/FIN-2014003-02 | 2014Q2 | Columbia | Failure to Implement Procedures That Ensure Operators Could Perform Time Critical Steps For Fire Events | Significance Determination Process |
05000458/FIN-2014002-02 | 2014Q1 | River Bend | Failure to Assess and Manage Risk for Electrical Switchyard Impacting Maintenance | Significance Determination Process Large early release frequency |
05000528/FIN-2013009-05 | 2014Q1 | Palo Verde | Improper Extension of Surveillance Interval for Surveillance Requirements Associated with the Engineered Safety Features Actuation Signal System Sequencer and Relays | Significance Determination Process Surveillance Frequency Control Program |