 QuarterSiteTitleTopic
05000482/FIN-2018002-022018Q2Wolf CreekFailure to Maintain Adequate Pressurization of the Control Room Envelope
05000298/FIN-2018002-012018Q2CooperFailure to Maintain Alarm Procedure for Service Water Booster Pump Ventilation Manual Actions
05000528/FIN-2017404-012017Q4Palo VerdeSecurity
05000298/FIN-2017012-022017Q4CooperInadequate Testing Activities for Emergency Transformer BusSignificance Determination Process
05000382/FIN-2017002-032017Q2WaterfordFailure to Ensure Appropriate Testing of TSP Baskets Inside ContainmentPast operability
Significance Determination Process
05000275/FIN-2017002-012017Q2Diablo CanyonInadequate Expansion Scope of Risk - Informed WeldsSignificance Determination Process
05000285/FIN-2016004-012016Q4Fort CalhounFailure to Provide Training on Changes to Protective Action Recommendation ProceduresSignificance Determination Process
05000416/FIN-2016007-012016Q4Grand GulfInadequate Technical Specification Surveillance Requirements for Reactor Protection SystemSignificance Determination Process
Fuel cladding
05000298/FIN-2016004-022016Q4CooperFailure of an Analysis to Demonstrate that Changes Did Not Reduce the Effectiveness of the Emergency PlanSignificance Determination Process
05000368/FIN-2016009-032016Q2Arkansas NuclearFailure to Ensure that the Assumptions in the Engineering Analysis Remain ValidSafe Shutdown
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
05000482/FIN-2016002-012016Q2Wolf CreekFailure to Adequately Establish Control Room Air Conditioning System Testing Flow Rate Acceptance CriteriaSignificance Determination Process
05000498/FIN-2016007-072016Q1South TexasFailure to Implement Administrative Controls for a Nonconservative Technical Specification of Standby Diesel Generator Frequency VariationCondition Adverse to Quality
Significance Determination Process
05000313/FIN-2016007-142016Q1Arkansas NuclearFailure to Properly Implement the Corrective Action ProgramSignificance Determination Process
05000285/FIN-2015012-012015Q4Fort CalhounFailure to Adequately Implement and Maintain Required NFPA 805 Implementation ItemsSignificance Determination Process
Fire Protection Program
05000285/FIN-2015012-032015Q4Fort CalhounFailure to Set Action Levels to Ensure that the Assumptions in the Engineering Analysis Remain ValidSignificance Determination Process
Maintenance Rule Program
Fire Protection Program
05000458/FIN-2015004-022015Q4River BendFailure to Properly Implement Surveillance Testing of Penetration Valve Leakage Control System Leads to Inoperability in Excess of Technical Specification Allowed Outage Time
05000397/FIN-2015502-012015Q2ColumbiaFailure to follow an emergency plan requirement to provide for a shelter as a protective action for the publicSignificance Determination Process
05000445/FIN-2015405-012015Q2Comanche PeakSecurity
05000529/FIN-2015002-032015Q2Palo VerdeFailure to Identify and Correct Engineered Safety Features Actuation System Steam Generator Differential Pressure Setpoint Drift
05000285/FIN-2015001-012015Q1Fort CalhounFailure to Conduct and Evaluate Simulator Testing In Accordance with ANSI/ANS-3.5-2009Significance Determination Process
05000285/FIN-2015001-022015Q1Fort CalhounFailure to Implement Risk Management Actions for Planned Maintenance ActivitiesSignificance Determination Process
05000298/FIN-2014004-022014Q3CooperFailure to Follow a Requirement of the Emergency PlanSignificance Determination Process
05000298/FIN-2014202-012014Q3CooperSecurity
05000483/FIN-2014007-082014Q2CallawayInadequate Procedure for Cooling Instrumentation During a Station Blackout Event.Significance Determination Process
05000397/FIN-2014003-022014Q2ColumbiaFailure to Implement Procedures That Ensure Operators Could Perform Time Critical Steps For Fire EventsSignificance Determination Process
05000458/FIN-2014002-022014Q1River BendFailure to Assess and Manage Risk for Electrical Switchyard Impacting MaintenanceSignificance Determination Process
Large early release frequency
05000528/FIN-2013009-052014Q1Palo VerdeImproper Extension of Surveillance Interval for Surveillance Requirements Associated with the Engineered Safety Features Actuation Signal System Sequencer and RelaysSignificance Determination Process
Surveillance Frequency Control Program