MONTHYEARRS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-094, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements2022-07-25025 July 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station2022-05-25025 May 2022 Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station RS-22-059, CFR50.46 Annual Report2022-05-0404 May 2022 CFR50.46 Annual Report RS-22-056, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-054, Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval2022-04-13013 April 2022 Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-030, Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations 2024-01-03
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office July 25, 2022 10 CFR 50.55a RS-22-094 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements
Reference:
Letter from N.L. Salgado (U.S. NRC) to B.C. Hanson (Exelon Generation Company, LLC), "Byron Station, Unit Nos. 1 And 2; Dresden Nuclear Power Station, Units 2 and 3; James A. Fitzpatrick Nuclear Power Plant; Lasalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 And 2 - Request to Use Provisions in the 2013 Edition of the ASME Boiler And Pressure Vessel Code For Performing Non-Destructive Examinations (EPID L-2019-LLR-0080)," dated April 17, 2020 (ADAMS Accession No. ML20099D955)
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (z)(1), Constellation Energy Generation (CEG), LLC requests NRC approval of relief request I6R-09 associated with the Sixth Inservice Inspection (ISI) Interval for Quad Cities Nuclear Power Station (QCNPS),
Units 1 and 2.
The Sixth Interval of the QCNPS, Units 1 and 2, ISI Program will comply with the 2017 Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV)
Code. However, this request proposes short-term application of certain 2013 Edition non-destructive examination requirements to maintain QCNPS requirements consistent with the remainder of the CEG fleet. Request I6R-09 is attached.
The Sixth ISI Interval at QCNPS will begin on April 2, 2023; accordingly, CEG requests approval of this request by March 31, 2023, to support the Sixth ISI Interval.
U.S. Nuclear Regulatory Commission July 25, 2022 Page 2 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Ms. Rebecca L. Steinman at 630-657-2831.
Respectfully, Patrick R. Simpson Sr. Manager - Licensing Constellation Energy Generation, LLC
Attachment:
10 CFR 50.55a Relief Request I6R-09, Rev. 0 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station
10 CFR 50.55a Relief Request I6R-09, Rev. 0 Page 1 of 4 Alternative to Permit Continued Application of Certain ASME Section XI 2013 Edition NDE Requirements for Short Term Fleet Consistency in Accordance with 10 CFR 50.55a(z)(1) -
"Alternative Provides Acceptable Level of Quality and Safety"
- 1. ASME Code Component(s) Affected Code Class: 1, 2, 3, and MC
Reference:
ASME Section XI, 2013 Edition ASME Section XI, 2017 Edition Examination Category: All, as related to NDE Methods and Requirements Item Number: All, as related to NDE Methods and Requirements
Description:
Alternative to Permit Continued Application of Certain ASME Section XI 2013 Edition NDE Requirements for Short Term Fleet Consistency Components: Class 1, 2, 3, and MC Component Exams
- 2. Applicable Code Edition The Sixth Interval of the Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, Inservice Inspection (ISI) Programs will be based on the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section XI, 2017 Edition.
The Fifth Interval of the QCNPS, Units 1 and 2, ISI Programs are currently based on the ASME Section XI, 2013 Edition for all non-destructive examination (NDE) requirements.
The approval for using the 2013 Edition NDE requirements was made under NRC Safety Evaluation dated April 17, 2020 (ML20099D955). Similarly, all Constellation Energy Generation (CEG), LLC plants are currently standardized on the 2013 Edition for NDE requirements, either via this same relief request or under the normal plant ISI Program ASME Section XI code of record.
- 3. Applicable Code Requirements CEG is required to update the QCNPS, Units 1 and 2, ISI Program for the Sixth Interval to the latest Edition of the ASME BPV Code, Section XI, approved by the Nuclear Regulatory Commission (NRC) in 10 CFR 50.55a(a).
10 CFR 50.55a(g)(4)(ii), Applicable ISI Code: Successive 120-month intervals, states:
"Inservice examination of components and system pressure tests conducted during successive 120-month inspection intervals must comply with the requirements of the latest edition and addenda of the ASME Code incorporated by reference in paragraph (a) of this section 18 months before the start of the 120-month inspection interval" In accordance with 10 CFR 50.55a(a)(1)(ii)(C)(55), the 2017 Edition is the latest NRC approved version of ASME Section XI as of 18 months prior to the QCNPS Sixth Interval start date.
10 CFR 50.55a Relief Request I6R-09, Rev. 0 Page 2 of 4 Alternative to Permit Continued Application of Certain ASME Section XI 2013 Edition NDE Requirements for Short Term Fleet Consistency in Accordance with 10 CFR 50.55a(z)(1) -
"Alternative Provides Acceptable Level of Quality and Safety"
- 4. Reason for Request The QCNPS, Units 1 and 2, Sixth ISI Interval is currently scheduled to begin on April 2, 2023. The current fleet approval for all CEG plants to be governed by the NDE requirements of the 2013 Edition of ASME Section XI will expire for QCNPS on this date.
And based on 10 CFR 50.55a(g)(4)(ii) the Sixth Interval ISI Program for QCNPS will be required to update to the 2017 Edition.
The CEG fleet of plants currently uses a common Code Edition specifically for NDE requirements such that inservice inspection related NDE activities across the fleet are performed in accordance with a standardized fleet program. The standardized NDE requirements and procedures are currently based on the 2013 Edition of ASME Section XI. While the overall ISI Program requirements are managed in site-specific documents under plant-specific code editions, the NDE program is controlled in common corporate procedures that are implemented across the entire CEG nuclear fleet.
This standardized fleet program is currently based on either the NRC approval referenced in Section 2 or is in accordance with the individual plant ASME Section XI code of record for the stations ISI Program. Quad Cities was included in the April 17, 2020 approval to use ASME Section XI, 2013 Edition for the performance of NDE activities through the end of the current Fifth ISI interval in order to allow use of common CEG procedures, processes, training, knowledge, and technical skills.
Due to the difference in interval start dates for QCNPS as compared to the other CEG sites, the upcoming QCNPS Sixth Interval would require development and implementation of a separate and unique NDE Program with unique supporting procedures affecting multiple organizations. Additionally, CEG would be required to create a unique skill set with unique training applicable specifically QCNPS. This minimizes the potential for using shared resources with other CEG sites, presents human performance concerns when applying different criteria, and prevents the use of common site and fleet procedures.
Pursuant to 10 CFR 50.55a(a)(z)(1), CEG requests authorization to continue to utilize the NDE specific requirements in the 2013 Edition of ASME Section XI for QCNPS, Units 1 and 2 for a period of time consistent with the First Period of the new Sixth Interval. The conclusion of the First Period for QCNPS, Units 1 and 2 coincides with the time when the balance of the plants in the CEG fleet will update to the latest ASME Section XI NDE requirements approved in 10 CFR 50.55a. The continued use of ASME Section XI 2013 Edition at QCNPS will be limited to the performance of NDE activities during the First Period and is subject to the applicable conditions contained in 10 CFR 55.55a(b)(2).
- 5. Proposed Alternative and Basis for Use CEG proposes to continue to utilize the 2013 Edition of ASME Section XI for NDE activities related to performing inservice inspections during the First Period of the QCNPS Sixth Interval. In implementing this proposed alternative, CEG will comply with
10 CFR 50.55a Relief Request I6R-09, Rev. 0 Page 3 of 4 Alternative to Permit Continued Application of Certain ASME Section XI 2013 Edition NDE Requirements for Short Term Fleet Consistency in Accordance with 10 CFR 50.55a(z)(1) -
"Alternative Provides Acceptable Level of Quality and Safety" all applicable NRC conditions and limitations related to the NDE requirements of the ASME Section XI 2013 Edition specified in 10 CFR 50.55a(b)(2).
Specifically, CEG is requesting the continued use of the provisions in the 2013 Edition of ASME Section XI for NDE activities associated with inservice inspections. These NDE activities are primarily driven from ASME Section XI Subarticles IWA-2100, IWA-2200, and IWA 2300. CEG will comply with all related NDE requirements of the 2013 Edition of ASME Section XI, as they interface with the General Requirements of IWA-1000 as well as certain Mandatory and Nonmandatory Appendices.
This request will allow QCNPS NDE requirements to remain standardized with the rest of the CEG fleet until the balance of the plants update to the latest approved edition of ASME Section XI, nominally at the end of the QCNPS First Period of the Sixth Interval.
It is important to note that this request does not apply to the balance of the ISI Program including the selection, planning, and scheduling of ISI examinations and tests as defined in IWB-, IWC-, IWD-, IWE-, and IWF-2500 or NRC approved ISI alternatives.
Therefore, ISI examinations and tests will be selected, planned, and scheduled in accordance with 2017 Edition of ASME Section XI which is the Sixth Interval Code of Record.
Continued application of the 2013 Edition of ASME Section XI specifically for NDE requirements (consistent with the other CEG sites) will provide an acceptable level of quality and safety, and will enhance the effective management and implementation of the NDE activities at QCNPS. Approval of this request supports CEGs ability to maximize efficiencies, minimize human performance and procedure error traps, and optimize the use of internal operating experience as all CEG units will continue to utilize common procedures, processes, training, and knowledge for NDE implementation.
- 6. Duration of Proposed Alternative Relief is requested for the Sixth ISI Interval, First Inspection Period, for QCNPS, Units 1 and 2.
- 7. Precedents
- Exelon Generation Company Fleet Letter Request RS-19-089 (JAFP-19-0084) "Byron Station, Unit Nos. 1 and 2; Dresden Nuclear Power Station, Units 2 and 3; James A.
Fitzpatrick Nuclear Power Plant; Lasalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2
- Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations (EPID L-2019-LLR-0080)" was approved by the NRC Safety Evaluation (SE) dated April 17, 2020 (NRC Accession No. ML20099D955).
10 CFR 50.55a Relief Request I6R-09, Rev. 0 Page 4 of 4 Alternative to Permit Continued Application of Certain ASME Section XI 2013 Edition NDE Requirements for Short Term Fleet Consistency in Accordance with 10 CFR 50.55a(z)(1) -
"Alternative Provides Acceptable Level of Quality and Safety"
- Arkansas Nuclear One, Unit 2 (AN0-2) Relief Request AN02-ISI-021, "Arkansas Nuclear One, Unit 2 - Request for Alternative AN02-ISI-021 to Permit Continued Application of the 2007 Edition through the 2008 Addenda of the ASME Code (EPID L-2018-LLR-0122)" was approved by the NRC SE dated June 11, 2019 (NRC Accession No. ML19156A400).
- 8. References None