MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] |
Text
( ~ DUKE Steve Snider Vice President ENERGY Nuclear Engineering 526 South Church Street, EC-07H Charloote, NC 28202 980-373-6195 Steve.Snider@duke-energy.com Serial: RA-20-0191 September 21, 2020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, DOCKET NOS. 50-325, 50-324 CATAWBA NUCLEAR STATION, UNITS 1 AND 2, DOCKET NOS. 50-413, 50-414 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, DOCKET NOS. 50-369, 50-370 OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3, DOCKET NOS. 50-269, 50-270, 50-287 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2, DOCKET NO. 50-261 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, DOCKET NO. 50-400
SUBJECT:
Request to use a provision of a later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI in accordance with 10 CFR 50.55a(g)(4)(iv)
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv), and the guidance provided in NRC Regulatory Issue Summary (RIS) 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI", dated July 28, 2004, Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (hereafter referred to collectively as Duke Energy), requests NRC approval to use specific provisions of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for Duke Energy Nuclear Fleet. Specifically, Duke Energy requests approval to use the ASME Boiler and Pressure Vessel Code, Section XI, 2017 Edition, Articles IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 for pressure testing of Class 1, Class 2, and Class 3 systems.
Duke Energy requests approval of this request by February 25, 2021. There are no regulatory commitments in this letter.
RA-19-0191 Page 2 If you have any questions concerning this request, please contact Art Zaremba, Director - Fleet Licensing, at (980) 373-2062.
Sincerely, Steve Snider Vice President - Nuclear Engineering
Attachment:
Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI cc: L. Dudes, Regional Administrator USNRC Region II G. Smith, USNRC Senior Resident Inspector - BNP J. D. Austin, USNRC Senior Resident Inspector - CNS J. Zeiler, USNRC Senior Resident Inspector - HNP G. A. Hutto, USNRC Senior Resident Inspector - MNS J. Nadel, USNRC Senior Resident Inspector - ONS M. Fannon, USNRC Senior Resident Inspector - RNP A. Hon, NRR Project Manager
RA-20-0191 Attachment Page 1 of 3 Attachment Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI
RA-20-0191 Attachment Page 2 of 3 Pursuant to 10 CFR 50.55a(g)(4)(iv) and in accordance with the guidance provided in NRC Regulatory Issue Summary (RIS) 2004-12, dated July 28, 2004, Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, requests NRC approval to use specific provisions of a later edition of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (B&PV) Code, Section XI, for Duke Energy Nuclear Fleet.
Specifically, Duke Energy requests approval to use the ASME Boiler and Pressure Vessel Code, Section XI, 2017 Edition, Articles IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 for pressure testing of Class 1, Class 2, and Class 3 systems.
- 1. ASME Code Component(s) Affected:
All pressure-retaining components subject to pressure testing requirements of Examination Category B-P for Class 1, Category C-H for Class 2, and Category D-B for Class 3.
2. Applicable Code Edition and Addenda
The applicable Edition and Addenda of the ASME Code, Section XI is identified in Table 1.
Table 1 ISI ASME Section XI Code Plant/Unit(s) Interval Start Date Interval End Date1 Interval Edition/Addenda Brunswick Steam Fifth 2007 Edition, Through 2008 05/11/2018 05/10/2028 Electric Plant Units 1 Addendum and 2 Catawba Nuclear Fourth 2007 Edition, Through 2008 08/19/2015 12/06/2024 (Unit 1)
Station Units 1 and 2 Addendum 02/24/2026 (Unit 2)
H.B. Robinson Steam Fifth 2007 Edition, Through 2008 07/21/2012 02/19/2023 Electric Plant Unit 2 Addendum McGuire Nuclear Fourth 2007 Edition, Through 2008 12/01/2011 (Unit 1) 11/30/2021 (Unit 1)
Station Units 1 and 2 Addendum 07/15/2014 (Unit 2) 02/29/2024 (Unit 2)
Oconee Nuclear Station Fifth 2007 Edition, Through 2008 07/15/2014 07/15/2024 Units 1, 2, and 3 Addendum Shearon Harris Nuclear Fourth 2007 Edition, Through 2008 09/09/2017 09/08/2027 Power Plant Unit 1 Addendum Note 1: Date listed is the currently planned interval end date. In accordance with IWA-2430(c)(1),
this end date may be extended or shortened as necessary.
- 3. Proposed Subsequent Code Edition and Addenda (or Portion):
Duke Energy proposes to utilize portions of the ASME Section XI, 2017 Edition in lieu of the 2007 Edition up to and including the 2008 Addenda. Until the 2017 Edition was published, the ASME Section XI code did not contain requirements for pressure testing pneumatic safety related systems. Additionally, the 2017 edition provides exemptions for periodic system pressure tests, clarification for test condition hold time, and incorporates clarification for systems borated for the purpose of controlling reactivity. The affected ASME Section XI Examination Categories are B-P for Class 1, C-H for Class 2, and D-B for Class 3.
RA-20-0191 Attachment Page 3 of 3
- 4. Related Requirements:
10 CFR 50.55a(g)(4)(iv) states:
"Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met."
Federal Register, Volume 85, Number 86, dated May 4, 2020 (85 FR 26540),
incorporates by reference the 2015 and 2017 Editions of the ASME Code for inservice inspection. Duke Energy will adhere to any conditions that apply to pressure testing.
- 5. Duration of Proposed Request:
The duration of this approval will continue for the remainder of the current inservice inspection interval's listed in Table 1.
- 6.
References:
- 1. NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004
- 2. Federal Register, 85 FR 26540, dated May 4, 2020