Letter to Fisher Fort Calhoun Unit 1 Revised PSDAR Request for Additional Information - RAI
ML20111A215
Person / Time
Site: Fort Calhoun  Omaha Public Power District icon.png
Issue date: 05/20/2020
From: Jack Parrott
Division of Operating Reactor Licensing
To: Fisher M
Omaha Public Power District
J PARROTT
Shared Package
ML20111A214 List:
References
EPID L-2020-DPS-0000
Download: ML20111A215 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 20, 2020 Ms. Mary J. Fisher VP Energy Production and Nuclear Decommissioning Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1, REVISED POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID No. L-2020DPS-0000)

Dear Ms. Fisher:

The U.S. Nuclear Regulatory Commission (NRC) staff is conducting a review of the revised Omaha Public Power District (OPPD) Revised Post-Shutdown Decommissioning Activities Report (PSDAR) for the Fort Calhoun Station, Unit No. 1 (FCS), dated December 16, 2019.

The FCS revised PSDAR includes a description of the planned decommissioning activities, a schedule for their accomplishments, a site-specific decommissioning cost estimate and a discussion that provides a basis for concluding that the environmental impacts associated with site-specific decommissioning will be bounded by appropriate, previously issued, environmental impact statements. The revised PSDAR was submitted pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Sections 50.82(a)(4)(i) and 50.82(a)(7) for Fort Calhoun Station, Unit No. 1.

The environmental impacts of site-specific decommissioning activities documented in the PSDAR are being evaluated against the regulatory requirements in 10 CFR 50.82(a)(4)(i),

50.82(6)(ii) and the regulatory guidance in Regulatory Guide 1.185, Standard Format and Content for Post-Shutdown Decommissioning Activities Report. Based on this evaluation, additional information is needed for the NRC staff to determine whether the revised PSDAR contains the information required by the regulations. In particular, the additional information requested in the enclosure is needed regarding the basis for concluding that the environmental impacts associated with site-specific decommissioning activities are bounded by previously issued environmental impact statements for Fort Calhoun Station, such as the Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (NUREG-0586),

Supplement 1, Regarding the Decommissioning of Nuclear Power Plants (November 2002) and the site-specific Supplement 12, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) Regarding Fort Calhoun Station, Unit 1.

This request for additional information was discussed with your staff on May 14, 2020. Please respond within 60 days of the date of this letter.

M. Fisher 2 If you have any questions, please contact me at 301-415-6634 or via e-mail at Jack.Parrott@nrc.gov.

Sincerely, Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 and 72-54

Enclosure:

Request for Additional Information cc: Listserv Julia A. Schmitt, Manager NE Dept. of Health & Human Services julia.schmitt@nebraska.gov Angela Leek, Bureau Chief Bureau of Radiological Health Iowa Department of Public Health angela.leek@idph.iowa.gov

M. Fisher 3

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1, REVISED POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID No. L-2020DPS-0000)

DATE May 20, 2020 DISTRIBUTION:

PUBLIC RDB r/f RidsNMSSResource RidsRgn4MailCenter Resource AMoreno, OCA DMcIntyre, OPA GWarnick, RIV VDricks, RIV BMaier, RIV ADAMS Accession Number: ML20111A214 *via email DUWP REFS DUWP OGC DUWP OFFICE NAME JParrott RElliott* BWatson* SClark* JParrott DATE 04/21/2020 04/22/2020 04/22/2020 05/08/2020 05/20/2020 OFFICIAL RECORD COPY