Three Mile Island Nuclear Generating Station Medical Services Drill After Action Report/Improvement Plan Drill Date - October 10, 2018 Radiological Emergency Preparedness (REP) Program Published October 26, 2018

This page is intentionally blank.

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (TMI) Nuclear Generating Station Three Mile Island (TMI) Nuclear Generating Station Medical Services Drill After Action Report/Improvement Plan Published Date: October 26, 2018 Contents EXECUTIVE

SUMMARY

............................................................................................................. 3 SECTION 1: EXERCISE OVERVIEW ...................................................................................... 4 1.1 Drill Details ........................................................................................................................... 4

  • 1.2 Planning Team Leadership .................................................................................................. 4 1.3 Participating Organizations ....................................................................... ~ ......................... 5 SECTION 2: DESIGN

SUMMARY

............................................................................................... 6 2.1 Purpose and Design .............................................................................................................. 6 2.2 Objectives, Capabilities and Activities ................................................................................ 7 2.3 Scenario Summary ............................................................................................................... 8 SECTION 3: ANALYSIS OF CAPABILITIES ............................................................................. 9 3.1 Evaluation and Results ......................................................................................................... 9

  • 3.2 Summary Resul~s of Evaluation ............................................... :..................... :.................... 9 3.3 Criteria Evaluation Summaries ......................................................................................... 12 3.3.1 Private Organizations ......................................................................... :................... 12 SECTION 4: CONCLUSION ....................................................................................................... 13 APPENDIXA: EVALUATORS AND TEAM LEADERS .......................................................... 14 APPENDIX B: ACRONYMS AND ABBREVIATIONS ............................................................. 15 APPENDIXC: EXTENT-OF-PLAY AGREEMENT .......................................... ,...................... 16 1

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station This page is intentionally blank.

. (

2

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (TMI) Nuclear Generating Station EXECUTIVE

SUMMARY

On October 10, 2018 a Medical Services (MS-1) Drill was conducted for the IO-mile Plume Exposure Pathway, Emergency Planning Zone (EPZ) around the Three Mile Island (TMI)

Nuclear Generating Station by the Department of Homeland Security (DHS), Federal Emergency Management Agency (FEMA) Region III. The most recent prior MS-1 Drill for this site was conducted on October 12, 2016.

The purpose of the (TMI) MS- I Drill was to assess the State and local offsite response organizations preparedness in responding to a radiological medical emergency. The Drill was held in accordance with FEMA's policies and guidance concerning the evaluation of State and local Radiological Emergency Response Plans (RERP) and procedures.

FEMA wishes to acknowledge the efforts of the many individuals in the Commonwealth of Pennsylvania, Adams County Office of Emergency Management, Wellspan Gettysburg Hospital and the Adams Regional Emergency Medical Services, who were evaluated during this

])rill.

Protecting the public health and safety is the full-time job of some of the Drill participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility as volunteers providing vital emergency services twenty-four (24) hours a day to the communities in which they live. Cooperation and teamwork of all the participants was observed during this Drill.

This report contains the final evaluation of the MS-1 Drill. The Commonwealth of Pennsylvania and local organizations demonstrated knowledge of their emergency response plans and procedures and adequately implemented them. There were no Level 1 or Level 2 Findings or Plan Issues as a result of this Drill.

3

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (l'MI) Nuclear Generating Station SECTION 1: EXERCISE OVERVIEW 1.1 Drill Details Drill Name Wellspan Gettysburg Hospital 2018 Medical Services Drill Type of Drill Medical Services Drill Date October 10, 2018 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radioactive Contaminated/Injured Person 1.2 Planning Team Leadership Joseph A. Suders Senior Technological Hazards Program Specialist Federal Emergency Management Agency One Independence Mall 615 Chestnut Street Philadelphia, PA 19106 (215) 478-2925 Joseph.suders@fema.dhs.gov Laurin Fleming Emergency Management Specialist Bureau of Technological Hazards Pennsylvania Emergency Management Agency 1310 Elmerton A venue Harrisburg, PA 17110 (717) 651-2119 laufleming@pa.gov Glenn Fehring Senior Emergency Preparedness Specialist Exelon Corporation 200 Exelon Way Kennett Square, PA 19348 (610) 427-3958 Glenn.Fehring@exeloncorp.com 4

Unclassified

~diological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island ({Ml) Nuclear Generating Station 1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the TMI 2018 Medical Services Drill:

  • State Jurisdictions

Private Sector Organizations

  • Well span Gettysburg Hospital
  • Adams Regional Emergency Medical Services (EMS) 5

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (TMI) Nuclear Generating Station SECTION 2: DESIGN

SUMMARY

2.1 Purpose and Design On December 7, 1979, the President directed the Federal Emergency Management Agency (FEMA) to assume the lead responsibility for all off-site radiological planning and response.

FEMA's activities were conducted pursuant to 44 Code of Federal Regulations (CFR) Parts 350, 351 and 352. These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the TMI accident in March 1979.

44 CFR 350 establishes the policies and procedures for FEMA's initial and continued approval of St~te and local governments' radiological emergency planning and preparedness for commercial nuclear power plants. This approval is contingent, in part, on State and local government participation in joint exercises with licensees. FEMA's responsibilities in radiological emergency planning for fixed nuclear facilities include the following:

A. Taking the lead in offsite emergency planning and in the review and evaluation of radiological ~mergency response plans and procedures developed by State and local governments; B. Determining whether such plans and procedures can be implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted by State and local governments; C. Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the Memorandum of Understanding between the NRC and FEMA dated December 7, 2015 (Federal Register, Vol. 81, No. 57, March 24, 2016) and; D .. Coordinating the activities of the following Federal agencies with responsibilities in the radiological emergency planning process:

- U.S. Department of Commerce

- U.S. Nuclear Regulatory Commission

- U.S. Enyironmental Protection Agency

- U.S. Department of Energy

- U.S. Department of Health and Human Services

- U.S. Department of Transportation

- U.S. Department of Agriculture

- U.S. Department of the Interior

- U.S. Food and Drug Administration Representatives of these agencies serve on the Region III Regional Assistance Committee (RAC),

which is chaired by FEMA. A Radiological Emergency Preparedness MS-1 Drill was conducted

. on October 10, 2018, to assess* the capabilities of State and local emergency preparedness organizations in implementing their radiological emergency response plans and procedures to protect the public health and safety during a !adiological emergency involving TMI.

6

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (FMI) Nuclear Generating Station The purpose of this After Action Report (AAR) is to present the Drill results, and findings on the performance of the Off-site Response Organizations (OROs) during a simulated radiological emergency involving a contaminated injured individual.

The Drill was designed to demonstrate and evaluate the responder's knowledge of patient and responder personal protective measures, equipment preparation and employment, and decontamination procedures. All activities were demonstrated in accordance with the participants' plans and procedures as they would be performed in an actual emergency, except as agreed to in the Exercise Plan and Extent-of-Play (EOP) Agreement.

The findings presented in this report ate based on the evaluations of the Federal evaluator team, with final determinations made by the FEMA Region III Regional Assistance Committee (RAC)

Chairperson and approved by FEMA Headquarters. These reports are provided to the Nuclear Regulatory Commission (NRC) and participating States. State and local governments utilize the findings contained in these reports for the purposes of planning, training, and improving emergency response capabilities.

  • Section 1 of this report, entitled Overview, presents the Exercise Planning Team and the Participating Organizations.
  • Section 2 of this report, entitled Design Summary, includes the Purpose and Design, Objectives, Capabilities and Activities, and the Scenario Summary.
  • Section 3 of this report entitled Analysis of Capabilities contains detailed Evaluation and Results; a Summary Results of Evaluation; and Criteria Evaluation Summary. Information on the demonstration for each jurisdiction or functional entity evaluated is presented in a jurisdiction-based, issue-only format.
  • Section 4 of this report entitled Conclusion, is a description ofFEMA's overall assessment of the capabilities of the participating organizations.

The criteria utilized in the FEMA evaluation process are contained in the following:

  • NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980;
  • Radiological Emergency Preparedness Program Manual, January 2016 2.2 Objectives, Capabilities and Activities The TMI MS-1 Drill evaluated by FEMA, was designed to demonstrate that the ORO can transport, transfer, monitor, decontaminate and treat a contaminated/injured person while minimizing any cross contamination during a radiological emergency.

7

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station The demonstration included the ability to:

A. Respond to a radiation medical emergency following Adams County Office of Emergency Management, Wellspan Gettysburg Hospital and Adams Regional Emergency Medical Services procedures.

B. Monitor for radiation contamination and uptake, and to valid~te persons providing these services are adequately prepared to handle contaminated individuals.

C. Conduct timely and accurate communications between the hospital and offsite response agencies.

D. Exhibit correct priorities and appropriate techniques in Emergency Medical Services (EMS); transportation of patients; and pre-hospital and hospital emergency care of patients contaminated with radiation.

E. Demonstrate inter-agency cooperation between the Adams Regional Emergency Medical Services and Wellspan Gettysburg Hospital.

2.3 Scenario Summary The scenario began with an initial declaration of a Site Area Emergency (SAE) declared at Three Mile Island (TMI) Nuclear Generating Station with the first call to Adams County Office of Emergency Management made at 0805 via controller inject. A follow-on call was made to Wellspan Gettysburg Hospital at 0810 and all other critical facilities within Adams County of the SAE. At 0819, an escalation to General Emergency (GE) was received and relayed to the hospital communications nurses station. At 0825, the Adams Regional EMS staff was dispatched to the scene to begin medical treatment of an injured evacuee. At 0835, the Adams Regional Emergency Medical Services (EMS) staff notified the hospital that an evacuee of the TMI 10-mile Emergency Planning Zone (EPZ) sustained injuries froin the tailgate of an evacuee vehicle and received severe lacerations, abrasions, and a visible disfigurement to the left hand. The patient was C-collared, cocooned, and placed on a back board to stabilize potential neck and cervical spine injuries prior to transport. The Adams Regional EMS crew prioritized injuries over contamination concerns by dressing the victim's wounds, initiated contamination control protocols and deferred radiological surveying to the medical staff at Wellspan Gettysburg Hospital. A follow on call to Wellspan Gettysburg Hospital was communicated via radio by Adams Regional EMS at 1915 and included an update on the patient's condition. The patient arrived at the hospital at 0940 and was clean transferred to the hospital medical staff at 0945 for treatment. After treatment of the victim's wounds and completion of decontamination, the exercise was terminated at 1019.

8

Unclassified Radiological Emergency Preparedness Program (REPP)

. Mter Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Evaluation and Results Contained in this section are the results and findings of the evaluations of all jurisdictions and locations that participated in the October 10, 2018 TMI MS-1 Drill. The Drill was conducted to demonstrate the ability of the OROs to respond to a potentially contaminated injured person a~sociated with TMI.

Each jurisdiction and functional entity was evaluated on the basis of its demonstration of the appropriate Demonstration Criteria contained in the REP Program Manual. Detailed information on the Demonstration Criteria and the Extent-of-Play Agreement are found in Appendix C.

The Drill was conducted and evaluated in accordance with the Radiological Emergency Preparedness Program Manual (January 2016) and NUREG-0654/FEMA-REP-1, Rev. 1. The Demonstration Criteria included:

1.e.1- Equipment, maps, displays, monitoring instruments, dosimetry, Potassium Iodide (KI) and other supplies are sufficient to support emergency operations.

3.a.1- The OROs issue appropriate dosimetry, KI, and procedures, and manage radiological exposure to emergency workers in accordance with the plans/procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. OROs maintain appropriate record-keeping of the administration of KI to emergency workers.

6.d.1- The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

3.2 Summary Results of Evaluation The matrix presented in Table 3 .1, on the following pages, presents the status of the Demonstration Criteria from the REP Program Manual that were scheduled for demonstration during this Drill by all participating jurisdictions and functional entities. Drill Demonstration

  • Criteria are listed by number and the demonstration status of the criteria is indicated by the use of the following letters:

(LI) Level 1 Finding: An observed or identified inadequacy of organizational performance in an exercise that could cause a determination that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in ~vent of a radiological emergency to protect the health and safety of the public living in the vicinity of a Nuclear Power Plant (NPP).

(L2) Level 2 Finding: An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety.

9

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station (P) Plan Issue: An observed or identified inadequacy in the off-site response organizations' emergency plan/implementing procedures, rather than that of the ORO's performance.

(N) Not Demonstrated: The term applied to the status of a REP Evaluation Area Criterion indicating that the ORO, for a justifiable reason, did not demonstrate the Evaluation Area Criterion, as required in the Extent-of-Play Agreement or at the two-year or eight-year interval required in the FEMA REP Program Manual.

(M) Met: The status of a REP Evaluation Area Criterion indicating that the participating ORO demonstrated all demonstration criteria for the Evaluation Area Criterion to the level required in the Extent-of-Play Agreement with no findings assessed in the current exercise and no unresolved prior -findings.

10

Unclassified Radiological Emergency Preparedness Program (REPP)

Mter Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station Table 3.1 - Summary of Drill Evaluation Date: 2018-0ctober, 10 Site: TMI Cl)

(M) Met, (1) Level 1 Finding, (2) Level 2 Finding, (P) Planning Issue s

. :3=

.. ... .. . .. . :,.**7r

  • ,. ~ .
  • Erii~rgeilcy E>perations M:image111-ent .. .. . (}.:'t/ *.. ;,, .. _.,

. ~~:::.<{i"~ ..-., *".*.:_~.,-.:.. *, -.-- *"'** _::',

'"*. .. ~-

Mobilization lal Facilities lbl Direction and Control lcl Communications ldl Equipment and Supplies to Suooort Operations lel M M

,-,1, ,. **: **:* ..

Protective Action D~isioO: Making *'

Emergency Worker Exposure Control

  • 2al Accident Assessment and Pars for the Emergency Event 2bl PAD decision-making process and coordination for the General Public* 2b2 P ADs for disabilities & access/functional needs people 2cl Radiological Assessment & Decision making for the Ingestion Pathway* 2el Radiological Assessment & Decision making for Relocation/Reentry/Return 2dl Protective Action Imt,lem~ritation'- .

Implementation of Emergency Worker Exposure Control 3al M M Implementation of KI PAD for Institutionalized Individuals/Public 3b2 Implementation of PADs for disabilities & access/functional needs people 3cl Implementation of PADS for Schools 3c2 Implementation of Traffic and Access Control 3dl Impediments to Evacuation 3d2 Implementation of Relocation/Reentry/Return Decisions 3fl

. Fielcl Measurethents and* Atiatysis .  ;* .. *, .*. '

RESERVED 4al Field TeaniManagement 4a2 Plume Phase Field Measurement, Handling, & Analyses 4a3 *.

Post Plume Phase Field Measurements & Sampling 4bl Enierg~:µcyN'otificatjori an,d Publi¢ IriforwatiQn . .. -.,;

Activation of the Prompt Alert & Notification System (ANS) 5al RESERVED 5a2.

Activation of the Back-up ANS 5a3 Activation of the Exception Area ANS 5a4 Emergency Information & Instructions to the Public/Media 5bl Support Operalio~/Fllcilities ' ,, .,.

Monitoring, Decontamination; & Registration of Evacuees 6al Monitoring/Decontamination of Emergency Workers and Equipment 6bl Temporary Care of Evacuees 6cl Transportation/Treatment e>fContaminated Injured Individuals 6dl M M 11

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (I'Ml) Nucl~r Generating Station 3.3 Criteria Evaluation Summaries 3.3.1 Private Organizations In summary, the status ofDHS/FEMA criteria for the Private Sector Organizations are as follows:

3.3.1.1 Wellspan Gettysburg Hospital

a. MET: l.e.l; 3.a.l; 6.d.l b .. LEVEL 1 FINDINGS: NONE
c. LEVEL 2 FINDINGS: NONE
d. PLAN ISSUES: NONE
  • e. PRIOR ISSUES - RESOLVED; NONE
f. PRIOR ISSUES - UNRESOLVED: NONE 3.3.1.2 Adams County, Adams Regional Emergency Medical Services
a. MET: l.e.l; 3.a.l; 6.d.l
b. LEVEL 1 FINDINGS: NONE
c. LEVEL2 FINDINGS: NONE
d. PLAN ISSUES: NONE
e. PRIOR ISSUES - RESOLVED: NONE
f. PRIOR ISSUES - UNRESOLVED: NONE 12

_j

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (TMI) Nuclear Generating Station SECTION 4: CONCLUSION The Commonwealth of Pennsylvania and private sector organizations, except where noted in this report, demonstrated knowledge of their radiological emergency response plans and procedures and they were successfully implemented during the TMI MS-1 Drill evaluated on October 10, 2018.

Two FEMA evaluators provided analyses of six evaluation criteria. These analyses resulted in a determination of no Findings, no new Plan Issues, and no unresolved Plan Issues.

The Adams Regional Emergency Medical Services (DEMS) successfully demonstrated that necessary equipment and supplies were available to support the treatment of an injured/contaminated patient. EMS personnel prioritized life-saving medical practices over contamination concerns, implemented protective measures through the use of Personal Protective Equipment (PPE), regular glove changes, and control of cross contamination. Appropriate patient assessments were demonstrated as well as regular and ongoing communications with Well span Gettysburg Hospital.

The Wellspan Gettysburg Hospital successfully demonstrated the mobilization of staff, staffing assignments, issue of dosimetry and monitoring equipment, and effective use of Personal Protective Equipment during the exercise. The hospital staff effectively responded to communications from the AREMS, initiated the set-up and management of a Radiation Emergency Area (REA), and accepted and successfully treated an injured/contaminated patient while administering life-saving medical attention over contamination concerns. In addition, the medical facility provided security c~mtrol of the facility including the drop off bay for the patient and overall protective measures for contamination control and prevention of cross contamination.

Based on the results of the Drill and a review of the offsite radiological emergency response plans and procedures submitted, FEMA Region III has determined they are adequate (ineet the planning and preparedness standards ofNUREG-0654/FEMA-REP-1, Revision 1, November 1980, as referenced in 44 CFR 350.5) and there is reasonable assurance they can be implemented, as demonstrated during this Drill.

An Improvement Plan (IP) will not be developed as part of this report.

13

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (fMI) Nuclear Generating Station APPENDIX A: EVALUATORS AND TEAM LEADERS The following is the list of Evaluators and Team Leaders for the TMI 2018 MS-1 Drill evaluated on October 10, 2018. The following constitutes the managing staff for the Evaluation:

  • Thomas Scardino, DHS/FEMA, Regional Assistance Committee Chairman
  • Joseph Suders, DHS/FEMA, Senior Technological Hazards Program Specialist, Team Leader and Lead Evaluator DATE: October 10, 2018 SITE: TMI Wellspan Gettysburg Hospital Joseph Suders FEMA RIii Adams Regional EMS Michael Shuler FEMA RIii 14

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island (l'MI) Nuclear Generating Station APPENDIX B: ACRONYMS AND ABBREVIATIONS Acronym Meaning AAR After Action Reoort ACOEM Adams County Office of Emergency Management ALARA As Low As Reasoiiabiy Achievable ALC Annual Letter of Certification ANS Alert and Notification System AREMS Adams Regional Emergency Medical Services BRP Bureau of Radiation Protection DHS Department of Homeland Security DRD Direct Reading Dosimeter EMS Emergency Medical Services BOP Extent of Play EPZ Emergency Planning Zone FASP First Aid and Safety Patrol FEMA Federal Emergency Management Agency FMT Field Monitoring Team GE General Emergency IP hnprovement Plan KI Potassium Iodide MS-1 Medical Services NPP Nuclear Power Plant NRC Nuclear Re!rulatory Commission ORO Offsite Response Organization PEMA Pennsylvania Emergency Management Agency PPB Personal Protective Equipment .

PRD Permanent Record Dosimeter RAC Recional Assistance Committee REA Radiation Emergency Area REP Radiolocical Emergency Preparedness RERP Radiolocical Emergency Preparedness Program SAE Site Area Emergency SOP Standard Operating Procedure TMINGS Three Mile Island Nuclear Generating Station WGH W ellspan Gettysburg Hospital 15

(

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station APPENDIX C: EXTENT-OF-PLAY AGREEMENT The Extent-of-Play Agreement was extracted from the Exercise Plan, which was drafted by Pennsylvania Emergency Management Agency, and is included in this report as an Appendix. The Extent-of-Play was negotiated and agreed upon by FEMA Region III, and Pennsylvania Emergency Management Agency.

The Exercise Plan was created as an overall tool for facilitation and implementation of the TMI MS-1 Drill and to integrate the concepts and policies of the Homeland Security Exercise Evaluation Program with the Radiological Emergency Preparedness Program Exercise Methodology.

16

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station THREE MlLE ISLAND Wellspan Gettysburg Hospital October 10, 2018 Method of Operation

1. The pow~r station and its personnel will not play as active role in the facilitation of this exercise. The plant's simulated events, radiation releases, and emergency classifications will be injected by off-site controllers. A pre-approved scenario will be used.
2. The Pennsylvania Emergency Management Agency (PEMA), PEMA Central Area Office and the Bureau of Radiation Protection (BRP) will not be activated as pf!.11 of this exercise.

The Exercise Coordinator will provide pre-exercise coordination and observe exercise activities.

3. Exelon will participate as a Controller in this exercise.
4. Adams County Office of Emergency Management will provide pre-exercise coordination, participate in this exercise as the county coniri:mnications coordinator and observe exercise activities
5. Controllers will be supplied by PEMA/Exelon. Controllers are not players and will.

provide injects and information to initiate and stimulate exercise play by providing radiological readings during the monitoring of personnel. Live radioactive sources will only be used to perform operational checks of radiological monitoring instruments.

6. PEMA staff and qualified county emergency management personnel will be assigned to key locations for the purpose of observing, noting response actions and conditions, and recording observations for future use. Observers will not take an act.ive part in the proceedings, but will interact with staff members to the extent necessary to fulfill their observer responsibilities. Coaching of players is not permitted, except as appropriate to provide training to participants awaiting a re-demonstration.
7. Department of Homeland Security (OHS) Federal Emergency Management Agency

.(FEMA), Radiological Emergency Preparedness Program (REPP) Evaluators: FEMA Evaluators will be present at designated demonstration locations.

8. Exercise activities are scheduled to commence on or about 0800, October 10, 2018 and continue until the participants have completed the exercise objectives and demonstrated the Exercise Evaluation Criteria.
9. Participants and agencies will Stand Down when the Controllers have confirmed with the evaluators that all evaluation criteria have been demonstrated and when the State and County Observers are satisfied that the Objectives have been met.

17

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station

10. An emergency plan is drafted to address the generally expected conditions of an emergency. Not everything in the emergency plan may be applicable for a given scenario.

The main purpose of an emergency plan is to assemble sufficient expertise and officials so as to properly react to the events as they occur. The responders should not be so tied to a plan that they cannot take actions that are more protective* of the public. Therefore, if, by not following the plan, the responders protect the public equally as well as provided in the plan, it should be noted for possible modification of the plan, but not classified as a negative incident. Furthermore, if, by following the plan there is a failure to protect the public health and safety, it should be noted so that the plan can be modified and the appropriate negative assessment corrected.

11: During the exercise any activity that is not satisfactorily demonstrated may be re-demonstrated by the participants during the exercise, provided it does hot negatively interfere with the exercise. Refresher training may be provided by the piayers, observers, and/or controllers. Re-demonstrations will be negotiated between the players, observers, controllers, and evaluators. It is permissible to extend the'demonstration window, within reason, to accommodate the re-demonstration. Activities corrected from a re-demonstration will be so noted.

Objectives A.

  • Demonstrate the ability to respond to a radiation medical emergency following the procedures of Adams County Office of Emergency Management, Adams Regional Emergency Medical Services (EMS), and Wellspan Gettysburg Hospital.

B. Demonstrate timely and_accurate communications between the hospital and offsite response agencies. (Telephones will be used in lieu of radios whenever possible to limit the potenth~l misinterpretation of the exercise as an actual event.)

C. Demonstrate correct priorities and appropriate techniques in EMS, transportation of patients and pre-hospital and hospital emergency care of rad1.oactively contaminated patients.

D. Demonstrate inter-agency cooperation between the Ambulance Company/ EMS and the Hospital.

18

Unclassified Radiological Emergency Preparedness Program (REPP)

  • After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station THREE MILE ISLAND WELLSPAN GETTYSBURG HOSPITAL MEDICAL SERVICES EXERCISE Extent of Play Agreement Evaluation Area 1-Emergency Operations Management Sub-element 1.e - Equipment and Supplies to Support Operations INTENT This sub-element derives from NUREG-0654 / FEMA-REP-1, which requires that OROs have emergency equipment and supplies adequate to support the emergency response.

Criterion 1.e.1: Equipment, maps, displays, monitoring instruments, dosimetry,potassium iodide (KI) and other supplies are sufficient io support emergency operations.

(NUREG-0654 I FEMA-REP-1, H. 7, 10; L 7, 8, 9; J.10.a, h, c; J.11, 12; K.3.a; K.5.b)

Assessment / Extent-of-Play Assessment of this Demonstration Criterion is accomplished primarily through a baseline evaluation and subsequent periodic inspections.

A particular facility's equipment and supplies must be sufficient and consistent with that facility's assigned role in the ORO's emergency operations plans. Use of maps and other displays is encouraged. For non:.faci!ity-based operations, the equipment and supplies must be sufficient and consistent with the assigned operational role. At locations where traffic and access control personnel are deployed, appropriate equipment (e.g., vehicles, barriers, traffic cones, and signs) must be available, or their availability described; Specific equipment and supplies that must be demonstrated undet this criterion include KI inventories, dosimetry, and monitoring equipment, as follows:

KI: Responsible OROs must demonstrate the capability to maintain inventories of KI sufficient for use by: (1) emergency workers; (2) institutionalized individuals, as indicated in capacity lists for facilities; and (3) where stipulated by the plans /procedures, members of the general public (including transients) within the plume pathway EPZ. In addition, OROs must demonstrate provisions to make KI available to specialized response teams (e.g., civil support team, Special Weapons and Tactics Teams,urban search and rescue, bomb squads, HAZMAT, or other ancillary groups) as identified in plans/ procedures. The plans/ procedures must include the forms to be used for documenting emergency worker ingestion: of KI, as well as, a mechanism for identifying emergency workers that have declined KI _in advance.

ORO quantities of dosimetry and KI available and storage locations(s) will be confirmed by physical inspection at the storage location(s) or through documentation of current inventory submitted during the exercise, provided in the ALC submission, and/or verified during an SAV.

Available supplies of KI must be within the expiration date indicated on Kl bottles or blister 19

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station packs. As an alternative, the ORO may produce a letter from a certified private or state laboratory indicating that the KI supply remains potent, in accordance with U.S. Pharmacopoeia standards.

Dosimetry: Sufficient quantities of appropriate direct-reading and permanent record dosimetry and dosimeter chargers must be available for issuance to all emergency workers who will be dispatched to perform an ORO mission. In addition, OROs must demonstrate provisions to make dosimetry available to specialized response teams (e.g., civil support team, Special Weapons and Tactics Teams, urban search and rescue, bomb squads, HAZMAT, or other ancillary groups) as identified in plans / procedures.

Appropriate direct-reading dosimetry must allow an individual(s) to read the administrative reporting limits and maximum exposure limits contained in the ORO's plans/ procedures.

Direct-reading dosimeters must be zeroed or operationally checked prior to issuance. The dosimeters must be inspected for electrical leakage at least annually and replaced when necessary.

Civil Defense Victoreen Model 138s (CDV-138s) (0-200 mR), due to their documented history of electrical leakage problems, must be inspected for electrical_leakage at least quarterly and replaced when nec~ssary. This leakage testing will be verified during the exercise, through documentation submitted in the (Annual Letter of Certification (ALC) and/or through a Staff Assistance Visit (SAY).

Operational checks and testing of electronic dosimeters must be in accordance with the manufacturer's instructions and be verified during the exercise, through documentation submitted in the ALC and/or through an SAV.

Monitoring Instruments: All instruments must be inspected, inventoried, and operationally checked before each use. Instruments must be calibrated in accordance with the manufacturer's recommendations. Unmodified CDV- 700 series instruments and other instruments without a manufacturer's recommendation must be calibrated annually. Modified CDV- 700 instruments must be calibrated in accordance with the recommendation of the modification manufacturer. A label indicating such calibiation must be on each instrument or calibrated frequency can be verified by other means. In addition, instruments being used to measure activity must have a sticker-affixed to their sides indicating the effective range of the readings. The range of readings documentation specifies the acceptable range of readings that the meter should indicate when it is response-checked using a standard test source.

For Field Monitoring Teams (FMTs), the instruments must be capable of measuring gamma exposure rates and detecting beta radiation. These instruments must be capable of measuring a range of activity and exposure, including radiological protection/ exposure control of team members and detection of activity on air sample collection media, consistent with the intended use of the instrument and the ORO's plans/ procedures. An appropriate radioactive check source must be used to verify proper operational response for each low-range radiation measurement instrument (less than IR/hr) and for high-range instruments when available. If a source is not available for a high-range instrument, a procedure must exist to operationally test the instrument before entering an area where only a high-range instrument can make useful readings.

20

Unclassified Radiological Emergency Preparedness Program (REPP)

Mter Action Report/Improvement Plan . Three.Mile Island Nuclear Generating Station In areas where portal monitors are used, the OROs must set up and operationally check the monitor(s). The monitor(s) must conform to the standards set forth in the Contamination Monitoring Standard for a Portal Monitor Used for Emergency Response, FEMA..:REP-21 (March 1995) or in accordance with the manufacturer's recommendations.

Mutual Aid Resources: If the incoming resources arrive with their own equipment (i.e., monitors and / or dosimetry) they will be evaluated by REP Program standard_s. FEMA will not inventory equipment that is not part of the REP Program. If an agency has a defined role in the REP Plan, they are subject to the planning process and standards, as well as the guidance of this Manual.

All activities must be based on the ORO's plans/ procedures and completed as they would be in an actual emergency, unless noted above or otherwise specified in the Extent-of-Play Agreement.

State Negotiated Extent of Play:

In accordance with PEMA standard operating procedures ambulance crews operating outside the 10 mile Emergency Planning Zone are considered 'Category C" emergency workers; therefore, they are only required to implement protective measures consistent with protection against blood-borne pathogens; i.e., long sleeved garments, trousers, impermeable gloves, and surgical masks.

Ambulance "Category C" emergency workers are notissiled dosimetry or Kl unless they are tasked to enter the 10 mile EPZ. At that time, the county will issue what is needed.

Hospital personnel are also considered "Category C" emergency workers and will conform to PEMA Standard Operating Procedure (SOP) protective measures at minimum. Direct Reading Dosimeters may be issued individually; howev~r, *an Area Kit will be established in the Radiation Emergency Area (REA). Individual PRDs will be issued by the hospital. Radiological Survey Instruments are calibrated per manufactures recommendations.

21

Un.classified Radiological Emergency Preparedn~s Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station Evaluation Area 3-Protective Action Implementation Sub-element 3.a -Implementation ofEmergency Worker Exposure Control INTENT This Sub-element is derived from NUREG-0654 I FEMA-REP-1, which requires that OROs have the capability to provide for the following: distribution, use, collection, and processing of direct-reading dosimetry and permanent record dosimetry; reading of direct-reading dosimetry by emergency workers at appropriate frequencies; maintaining a radiation dose record for each emergency worker; establishing a decision chain or authorization procedure for emergency workers to incur radiation exposures in excess of the PAGs; and the capability to provide KI for emergency workers, always applying the .as low as is reasonably achievable (ALARA) principle as appropriate.

Criterion 3.a.1: The OROs issue appropriate dosimetry, KI, and procedures, and manage radiological exposure to emergency workers in accordance with the plans I procedures.

Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. OROs maintain appropriate record-keeping of the administration ofKI to emergency workers.

(NUREG-0654 I FEMA-REP-1, K.3.a, b; K.4)

Assessment/ Extent-of-Play Assessment of this Demonstration Criterion may be accomplished during a biennial or tabletop exercise. Other means may include drills, seminars or training activities that would fully demonstrate technical proficiency.

OROs must demonstrate the capability to provide emergency workers (including supplemental resources) with the appropriate direct-reading and permanent record dosimetry, dosimeter chargers, KI, and instructions on the use of these items. For evaluation purposes, appropriate direct-reading dosimetry is defined as dosimetry that allows an individual(s) to read the administrative reporting limits that are pre-established at a level low enough to consider subsequent calculation of TEDE and maximum exposure limits, for those emergency workers involved in lifesaving activities, contained in the ORO's plans/ procedures.

Each emergency worker must have basic knowledge of radiation exposure limits as specified in the ORO's plans / procedures. If supplemental resources are used, they must be provided with just-in-time training to ensure basic knowledge of radiation exposure control. Emergency workers

  • must demonstrate procedures to monitor and record dosimeter readings and manage radiological exposure control.

During a plume phase exercise, emergency workers must demonstrate the procedures to be followed when administrative exposure limits and tum-back values are reached. The emergency worker must report accumulated exposures during the exercise as indicated in the plans /

procedures. OROs must demonstrate the actions described in the plans / procedures by determining whether to replace the worker, authorize the worker to incur additional exposures, or 22

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three.Mile Island Nu'clear Generating Station take other actions. If exercise play does not require emergency workers to seek authorizations for additional exposure, evaluators must interview at least two workers to determine their knowledge ofwhom to conta~t in case authorization is needed, and at what exposure levels. Workers may use any available resources (e.g., written procedures and/or coworkers) in providing responses.

a Although it is desirable for all emergency workers to each have direct-reading dosimeter, there may be situations where team members will be in close proximity to each other during the entire mission. hi such cases, adequate control of exposure can be achieved for all team members using one direct-reading dosimeter (DRD) worn by the team leader. Emergency workers assigned to low-exposure rate fixed facilities (e.g'., EOCs and communications center within the EPZ, reception centers, and counting laboratories) may have individual direct-reading dosimeters or they may be monitored using group dosimetry (i.e., direct-reading dosimeters strategically placed in the work area). Each team member must still have his or her own permanent record dosimetry.

Individuals authorized by the ORO to reenter an evacu.ated area during the plume (emergency) phase, must be limited to the lowest radiological exposure commensurate with completing their missions.

OROs may have administrative limits lower than EPA-400-R-92-001 dose limits for emergency workers performing various services (e.g., life-saving, protection of valuable property, all activities). OROs must ensure that th~ process used to seek authorization for exceeding dose limits does not negatively impact the capability to respond to an incident where life-saving and/or protection of valuable property may require an urgent response.

OROs must det)lonstrate the capability to accomplish distribution of KI to emergency workers consistent with decisions made. OROs must have the capability to develop and maintain lists of emergency workers who h~ve ingested KI, including documentation of the date(s) and time(s) they did so. Ingestion of KI recommended by the designated ORO health official is voluntary. For evaluation purposes, the actual ingestion of KI shall not be performed. OROs must demonstrate the capability to formulate and disseminate instructions on using KI for those advised to take it.

Emergency workers must demonstrate basic knowledge of procedures for using KI whether or not the scenario drives the implementation of KI use. This can be accomplished by an interview with the evaluator.

All activities must be based on the ORO's plans/ procedures and completed as they would be in an actual emergency, unless noted above or otherwise specified in the Extent-of-Play Agreement.

State Negotiated Extent of Play:

Radiological briefings will be provided to address exposure limits and procedures to replace personnel approaching limits and how permission to exceed limits is obtained.

  • At any time, players may ask other players or supervisors to clarify radiological injormation. In Pennsylvania, emergency workers outside the EPZ do not have turn-back values. Standard issue ofdosimetry and potassium iodide for each category of emergency worker is as follows:

Category A: 1 PRD, 1 DRD, and 1 unit ofKl Category B: 1 PRD and 1 unit ofKI 23

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station Category C: 1 PRD All locations that have dosimetry equipment indicated within their Radiological Emergency Response Plan (RERP) will make the dosimetry equipment (and Kl, as appropriate) available for inspection by the Federal Evaluator. in order to demonstrate an understanding of the use of the dosimetry equipment, Kl and associated forms; the location need only remove and distribute I issue a maximum ofsix (6) units ofdosimetry from their inventory. Simulation Permanent Record Dosimeters (PRDs) with mock serial numbers may be used.

EMS units outside the EPZ fall under guidance from the Interim Annex E letter dated April 6, 2009. Under section V-Concept of Operations, subsection D-Survey equipment requirements, Paragraph 8 EMS crews outside the EPZ are exempted from needing PRD, DRD, or Kl (Page 17 7) 24

~ Unclassified

~diological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan . Three Mile .Island Nuclear Generating Station Evaluation Area 6--Support Operation/ Facilities Sub-element 6.d - Transportation and Treatment of Contaminated Injured Individuals INTENT This Sub-element is derived from NUREG-0654 / FEMA-REP-1, which requires that OROs have the capability to transport contaminated injured individuals to medical facilities with the capability to provide medical services.

Criterion 6.d.1: The facility I ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, deco.ntamination, and medical services to contaminated injured individuals. (NUREG-0654 I FEMA-REP-1, F.2; H.10; K.5.a, b; L.1, 4)

Assessment / Extent,-of-Play Assessment of this Demonstration Criterion may be accompiished during a biennial exercise, an actual event, or drills. FEMA has determined that these capabilities have been enhanced anci consistently demonstrated as adequate; therefore, offsite niedical services drills need only be evaluated biennially. FEMA will, at the request of the involved ORO, continue to evaluate the drills on an annual basis. If more than two medical facilities and transportation providers are designated as primary or backup, they are also evaluated biennially.

Monitoring, decontamination, and contamination control efforts must not delay urgerit medical care for the victii;n.

OROs must demonstrate the capability to transport contaminated injured individuals to medical facilities.

An ambulance must be used for response to the victim. However, to avoid taking an ambulance out of service for an extended time, OROs may use any vehicle ( e.g., car, truck, or van) to transport the victim to the medical facility. It is allowable for an ambulance to demonstrate up to the point of departure for the medical facility and then have a non.:.specialized vehicle transport the

victim(s)" to the medical facility. This option is used in areas where removing an ambulance from service to drive a great distance (over an hour) for a drill would not be in the best interests of the community.

Normal communications between the ambulance/dispatcher and the receiving medical facility must be demonstrated. If a substitute vehicle is µsed for transport to the medical facility, this communication must occur before releasing the ambulance from the drill. This communication would include reporting radiation monitoring results, if available. In addition, the ambulance crew must demonstrate, by interview, knowledge of where the ambulance and crew would be monitored and decontaminated, if required, or whom to contact for such information.

Monitoring of the victim may b~ performed before transport or enroute, or may be deferred to the 25

Unclassified Radiological Emergency Preparedness Program (REPP)

After Action Report/Improvement Plan Three Mile Island Nuclear Generating Station medical facility. Contaminated injured individuals transported to medic~l facilities are monitored as soon as possible to assure that everyone (ambulance and medical facility) is aware of the medical and radiological status of the individual(s). However, if an ambulance defers monitoring to the medical facility, then the ambulance crew presumes that the patient(s) is contaminated and demonstrate appropriate contamination controls until the patient(s) is monitored. Before using monitoring instruments, the monitor(s) must demonstrate the process of checking the instrument(s) for proper operation. All monitoring activities must be completed as they would be in an actual emergency. Appropriate contamination control measures must be demonstrated before and during transport and at the receiving medical facility.

The medical facility must demonstrate the capability to activate and set up a radiological ,

emergency area for treatment. Medical facilities are expected to have at least one trained physician and one trained nurse to perform and supervise treatment of contaminated injured

( '

individuals. Equipment and supplies must be available for treatment of contaminated injured individuals.

The medical facility must demonstrate the capability to make decisions on the need for decontamination of the individual, follow appropriate decontamination procedures, and maintain records of all survey measurements and samples taken. All procedures for collection and analysis of samples and decontamination of the individual must be demonstrated or described to the evaluator. Waste water from decontamination operations must be handled according to facility plans / procedures.

All activities must be based on the ORO's plans/ procedures and completed as they would be in an actual emergency, unless noted above or otherwise specified in the Extent-of-Play Agreement.

State Negotiated Extent of Plav:

Demonstrate that the facility has the appropriate space, adequate resources and trained personnel to provide monitoring, decontamination and medical services to contaminated/injured individuals.

Demonstrate the ability to transport contaminated/injured individuals while using ALARA principles.

The Ambulance Service will pick-up a'pre-staged simulated contaminated/injured victim.