MONTHYEAR3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-02-17017 February 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-01, ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report2021-02-0202 February 2021 ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report 3F0121-02, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2021-01-19019 January 2021 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 3F0121-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-01-19019 January 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0920-01, License Transfer - Notification of Transfer Date2020-09-15015 September 2020 License Transfer - Notification of Transfer Date 3F0920-02, Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages2020-09-15015 September 2020 Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages 3F0720-03, ISFSI Only Emergency Plan and Implementing Procedure2020-07-21021 July 2020 ISFSI Only Emergency Plan and Implementing Procedure 3F0720-02, License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)2020-07-15015 July 2020 License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w) 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0420-03, Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions2020-04-22022 April 2020 Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions 3F0420-02, 2019 Radiological Environmental Operating Report2020-04-0707 April 2020 2019 Radiological Environmental Operating Report 3F0420-01, 2019 Annual Radioactive Effluent Release Report2020-04-0707 April 2020 2019 Annual Radioactive Effluent Release Report 3F0320-03, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20192020-03-19019 March 2020 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2019 2023-06-01
[Table view] |
Text
a Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 2.201 April 12, 2012 3F0412-10 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Errata - Crystal River Unit 3 - Reply to a Notice of Violation: EA-11-208
References:
- 1. NRC to CR-3 letter, dated December 20, 2011, "Crystal River Unit 3 - Final Significance Determination of a White Finding, Motice of Violation, and Assessment Follow-up Letter (NRC Inspection Report No.
05000302/2011501)" (Accession No. ML113540744)
- 2. CR-3 to NRC letter, 3F011203, dated January 19, 2012, "Crystal River Unit 3
- Reply to a Notice of Violation: EA-1 1-208"
- 3. NRC to CR-3 letter, dated January 25, 2012, "Errata - Crystal River Unit 3 -
Final Significance Determination of a White Finding, Notice of Violation, and Assessment Follow-up Letter (NRC Inspection Report No.
05000302/2011504)" (Accession No. ML12026A827)
Dear Sir:
The purpose of this letter is to provide an updated cover page containing the correct NRC Inspection Report number to the correspondence that was submitted ty Florida Power Corporation by letter dated January 19, 2012 (Reference 2).
By letter dated December 20, 2011, the NRC documented a notice of violation that involved the failure to maintain in effect a standard emergency classification scheme which included facility effluent parameters (Reference 1). Associated Enforcement Action EA-1 1-208 required a written reply within 30 days of the date of NRC Inspection Report.
Florida Power Corporation, doing business as Progress Energy Florida, Inc., submitted the Crystal River Unit 3 (CR-3) required 30-day reply to EA-1 1-208 in Enclosure 1 of Reference 2.
By letter dated January 25, 2012, the NRC provided notification that the Inspection Report Number in Reference 1 was incorrect (Reference 3). The NRC Inspection Report Number should have been 05000302/2011504 instead of 05000302/2011501.
Please replace the cover page of Reference 2 with the enclosed corrected cover page.
If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superi t, Licensing and Regulatory Programs, at (352) 563-4796.
f*ncerely, Jo A. Franke ice President Crystal River Unit 3 JAF/dwh
Enclosure:
Corrected cover page for CR-3 to NRC letter, dated January 19, 2012, "Crystal River Unit 3 - Reply to a Notice of Violation: EA-1 1-208" cc: NRC CR-3 Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ENCLOSURE Corrected cover page for CR-3 to NRC letter, dated January 19, 2012, "Crystal River Unit 3 - Reply to a Notice of Violation: EA-11-208"
k Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR2.201 January 19, 2012 3F01 12-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Reply to a Notice of Violation: EA-1 1-208
Reference:
NRC to CR-3 letter, dated December 20, 2011, "Crystal River Unit 3 - Final Significance Determination of a White Finding, Notice of Violation, and Assessment Follow-up Letter (NRC Inspection Report No. 05000302/2011504)"
Dear Sir:
By letter dated December 20, 2011, the NRC issued NRC Inspection Report No.
05000302/2011504, "Crystal River Unit 3 - Final Significance Determination of a White Finding, Notice of Violation, and Assessment Follow-up Letter," (Reference). This letter documented one notice of violation that involved the failure to maintain in effect a standard emergency classification scheme which included facility effluent parameters.
Enforcement Action EA-1 1-208 requires a written reply within 30 days of the date of NRC Inspection Report 05000302/2011504 (e.g., by January 19, 2012). In accordance with 10 CFR 2.201, Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) required 30-day reply to a Notice of Violation; Enforcement Action EA-11-208, in Enclosure 1. Enclosure 2 contains a list of regulatory commitments made in this submittal.
No personal privacy, proprietary, or safeguards information is contained in this submittal.
If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs, at (352) 563-4796.
Sincer Jon A. 5Fanke Vice eresident C -tal River Unit 3
ýJAF/dwh
Enclosures:
(1) Reply to a Notice of Violation: EA-1 1-208 (2) List of Regulatory Commitments xc: NRC CR-3 Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.