Letter Sequence Meeting |
---|
|
|
MONTHYEARML0835700272008-12-23023 December 2008 Meeting Notice, Meeting with Dominion Energy Kewaunee, Inc., to Discuss a Future Application to Convert the Kewaunee Technical Specifications from the Current Custom Format to the Improved Standard Format Project stage: Meeting ML0901601222009-01-15015 January 2009 Pre-application Meeting Re. a Future Amendment to Convert the Kewaunee Technical Specifications to the ITS Format Project stage: Meeting ML0901601132009-01-15015 January 2009 Pre-Application Meeting Re. a Future Amendment to Convert the Technical Specifications to ITS Format Project stage: Meeting ML0900801102009-02-0505 February 2009 Summary of Meeting Between NRC Staff and Kewaunee to Discuss a Future Amendment to Convert Technical Specifications to the Improved Standard TS Format Project stage: Meeting ML0910603302009-04-22022 April 2009 Notice of Meeting with Dominion to Discuss Issues Related to the Future Application to Convert the Kewaunee TS from Custom to Improved Standard Format Project stage: Meeting ML0913301112009-05-12012 May 2009 Technical Specifications Project Meeting Handouts Project stage: Meeting ML0913300252009-05-21021 May 2009 Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format Project stage: Meeting 2009-02-05
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML13204A1382013-06-25025 June 2013 2012 End-of-Cycle Slides ML13191B2632013-04-24024 April 2013 F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg ML13112A8122013-04-22022 April 2013 Oversight Presentation, Reactor Decommissioning Inspection Program ML13112A7682013-04-22022 April 2013 Power Reactor Decommissioning Process ML13112A7632013-04-22022 April 2013 Post-Shutdown Decommissioning Activities Report ML13112A6812013-04-22022 April 2013 Public Meeting to Discuss the Decommissioning of the Kewaunee Power Station ML13112A8462013-04-22022 April 2013 PSDAR Meeting Public Participation Ground Rules ML13066A3312013-03-0707 March 2013 Regulatory Conference Presentation 3-12-2013 ML1113904092011-05-26026 May 2011 NRC EOC Slide Presentation for Public Meeting ML1013104192010-05-18018 May 2010 Draft Supplement Environmental Impact Statement Meeting Slides March 24, 2010 ML1011304432010-04-21021 April 2010 NRC Slides for Kewaunee End-Of-Cycle Meeting ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station ML0926003762009-09-15015 September 2009 Handout 2 - Drawings, Analyzed RCS - Not Limiting Break ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 ML0916904622009-06-17017 June 2009 Powerpoint Presentation for NRC Briefing Graded Exercise June 23, 2009 ML0913301112009-05-12012 May 2009 Technical Specifications Project Meeting Handouts ML0911904992009-04-28028 April 2009 Meeting Slides, Kewaunee Power Station - Annual Assessment Meeting, Reactor Oversight Program - 2008 ML0901601132009-01-15015 January 2009 Pre-Application Meeting Re. a Future Amendment to Convert the Technical Specifications to ITS Format ML0901601222009-01-15015 January 2009 Pre-application Meeting Re. a Future Amendment to Convert the Kewaunee Technical Specifications to the ITS Format ML0830505892008-10-22022 October 2008 License Renewal Public Meeting Presentation Slides ML0727805042007-10-0404 October 2007 Presentation Slides for Kewaunee Public Meeting ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721904612007-08-0909 August 2007 Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure ML0712902162007-05-0808 May 2007 Public Meeting Presentation Slides, Kewaunee Power Station Cross-Cutting Issues. ML0634604952006-11-30030 November 2006 Slides, Internal Flooding Risk Reduction Activities, from Kewaunee Regulatory Public Meeting ML0604003522006-01-31031 January 2006 Enclosure 2 - Slides on Application of Dominion Safety & Core Design Methods to Kewaunee Power Station (KPS) ML0531903272005-11-0808 November 2005 Regulatory Conference Kewaunee Turbine Building Flooding Issues ML0527102572005-08-0909 August 2005 EOC 2004 Slides ML0513202602005-04-20020 April 2005 Presentation to NRC - Enclosure 2 to Acknowledgement of Receipt of Letter and Summary of Public Meeting Conducted to Discuss Commitments for the Kewaunee Nuclear Plant Letter ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML0331603312003-11-0606 November 2003 ,Kewaunee & Hatch Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term ML0331603242003-11-0606 November 2003 Praire Island Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term ML0315307202003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F2 - Chris Bakken - Region III Breakout ML0223406082002-08-0808 August 2002 Meeting Handouts Knpp/Nrc Meeting Covering: Licensing Submittals for Fuel Transition and Power Uprates (Mur and Stretch) ML0210100402002-04-0909 April 2002 EOC Meeting Slides 2013-06-25
[Table view] |
Text
Kewaunee Conversion Pre-Submittal Meeting IT8B Topics for Discussion Based on internallTSB discussions of lessons learned from previous Tech Spec Conversions including Davis Bessie (18-19 Dec. 2008)
Preparation of Submittal
- The completeness and complexity (or simplicity) of the submittal affects evaluation process
- Submittal letter must confirm that the CD is equivalent to hard copy
- STS 3.0 is the latest version and basis for conversion, not 3.1
- List all TSTF's adopted that are not incorporated into STS Revision 3.0
---t List all TSTF's adopted in which all aspects of the TSTF were not followed (l.e.
deviations, not adopting commitments, etc)
- All submittals should state if a commitment or license condition has been added modified or deleted
- Identification of Beyond Scope Items (BSI)
---t Current Licensing Basis
---t Definition
-+ Review of CLB during Conversion evaluation Review Process Overview and Lessons Learned
- Describe typical stages and schedule
- Definition and impact of "Beyond Scope Items" (BSI)
---t They are generally characterized as changes that differ from both the existing technical specifications and the improved STS
---t As defined in NRC Administrative Letter 96-04, BSls are those changes to the technical specifications that are not directly related to the conversion amendment.
---t NEI 96-06, Improved Technical Specifications Conversion Guidance, similarly identifies BSls as changes, such as plant-specific risk-based changes and power uprates, which are considered beyond the scope of the ITS conversion application and therefore may result in delays in ... approval of the application.
- Use of Bases during review
- Use of RAl's during review
- Use of Current Licensing Basis during review
- Items requiring Technical Branch Review
---t List of examples Other Items
---t Effect of refueling outages during evaluation period? .
---t Timely and thorough
- Applicability of precedent
- Ongoing reviews of TSTF's can impact conversion
- Use of Excel Services Database
---t Used for both informal questions and information requests
---t Unresolved issues may elevate quickly to RAI's