L-2020-004, Mock Adversary Force

From kanterella
Jump to navigation Jump to search

Mock Adversary Force
ML20015A061
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold  NextEra Energy icon.png
Issue date: 01/13/2020
From: Parks W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2020-004
Download: ML20015A061 (2)


Text

L-2020-004 January 13, 2020 Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Re: Florida Power & Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 N extEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 N extEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301

Subject:

N extEra Energy Mock Adversary Force

References:

1) NextEra Energy letter to U.S. Nuclear Regulatory Commission (NRC), "NextEra Energy-Entergy Joint Composite Adversary Force," dated March 8, 2018 (ADAMS Accession No. ML18072A104)
2) NSIR/STD-2004/15-001, Rev. 2, "Mock Adversary Force Performance Standards Gui1dance Document", dated December 10, 2019 (ADAMS Accession No. ML19297G952)

As described in Reference 1, Florida Power & Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook), the licensee for Seabrook Station; NextEra Energy-Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy) implemented a Joint Composite Adversary Force GCAF) with Entergy for the purpose of replicating adversary characteristics during Triennial Force On Force exercises.

On December 10, 2019, NSIR/STD-2004/15-001, Rev. 2, "Mock Adversary Force Performance Standards Guidance Document" was issued (Reference 2). This Mock Adversary Force (MAF) Performance Standards Guidance Document, as provided by the NRC, outlines the performance standards for industry MAF teams.

N extEra Energy is adopting the MAF Performance Standards as provided in Reference 2. These performance standards supersede those submitted within Reference 1. :i;X~1 Florida Power & Light Company JVI< (Z 700 Universe Boulevard, Juno Beach, FL 33408

  • L-2020-004 Page 2 of2 This letter contains no new regulatory commitments.

Should you have any questions, please contact Steve Catron at (561) 304-6206.

Respectfully, William L. Parks Safety Assurance and Learning, General Manager Florida Power & Light Company cc: USNRC Director, Office of Nuclear Security and Incident Response USNRC Regional Administrator, Region I USNRC Regional Administrator, Region II USNRC Regional Administrator, Region III USNRC Project Manager, Seabrook Station USNRC Project Manager, St. Lucie Nuclear Plant USNRC Project Manager, Turkey Point Nuclear Plant USNRC Project Manager, Duane Arnold Energy Center USNRC Project Manager, Point Beach Nuclear Plant USNRC Senior Resident Inspector, Seabrook Station USNRC Senior Resident Inspector, St. Lucie Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Duane Arnold Energy Center USNRC Senior Resident Inspector, Point Beach Nuclear Plant