UNITED STATES NUCLEAR REGULATORY COMMISSION ust 23, 2018

SUBJECT:

MILLSTONE POWER STATION - CYBER SECURITY INSPECTION REPORT 05000336/2018403 AND 05000423/2018403

Dear Mr. Stoddard:

On August 3, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Millstone Power Station (Millstone), Units 2 and 3. On this date, NRC inspectors discussed the results of this inspection with Mr. Craig Olsen, Plant Manager, and other members of your staff.

The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

One cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution, Operating Experience, because Dominion did not systematically and effectively collect, evaluate, and implement relevant internal and external operating experience in a timely manner. [P.5]

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at Millstone. In addition, if you disagree with a cross-cutting aspect assignment, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at Millstone.

Enclosure transmitted herewith contain Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket Numbers: 50-336 and 50-423 License Numbers: DPR-65 and NPF-49 Enclosure:

Non-Public Inspection Report 05000336/2018403 and 05000423/2018403 (OUO-SRI)

cc w/o encl; w/o OUO-SRI:

Distribution via ListServ cc w/encl; w/OUO-SRI:

K. Morris, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection ML18239A179 (Cover letter)

ADAMS ACCESSION NUMBER: ML18239A184 (Cover letter w/enclosure-OUO-SRI)

Cover Letter Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRS NAME JRady CCahill/DWerkheiser for DSchroeder GDentel DATE 8/21/18 8/23/18 8/22/18 8/23/18