Event Description | Recent Operating Experience at Callaway has shown that the pressure transient experienced in the Essential Service Water (ESW) system during Engineered Safety Feature Actuation System (ESFAS) testing can result in gasket failure on the Control Room Air Conditioners rendering the units nonfunctional. Previously, this pressure transient was considered to be the result of the system alignment used to perform the surveillance test, which is not the same as the system lineup which would occur on an actual Loss of Offsite Power (LOOP) or Safety Injection Signal Design Basis Accident (DBA) event. However, on April 20th, 2016, Callaway received preliminary analysis results that predict the Control Room Air Conditioners would actually experience a greater pressure transient during a DBA than what is currently experienced during ESFAS testing. This condition could result in the Control Room Air Conditioners not being capable of performing their safety function following a DBA event, and challenge Control Room Habitability. Therefore, this condition meets the reporting criteria of 10 CFR 50.72(b)(3)(ii)(B).
Based on current conditions (i.e., the plant is not in Power Operation), this condition does not present an immediate safety concern. The analysis of the pressure transient experienced by the ESW system during a postulated DBA event is preliminary and further evaluation of the analysis is ongoing. The NRC Resident Inspector has been notified. |
Where | |
---|---|
Callaway ![]() Missouri (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+2.98 h0.124 days <br />0.0177 weeks <br />0.00408 months <br />) | |
Opened: | David Hurt 22:04 Apr 20, 2016 |
NRC Officer: | Jeff Herrera |
Last Updated: | Apr 20, 2016 |
51874 - NRC Website | |
WEEKMONTHYEARENS 548062020-07-30T13:15:00030 July 2020 13:15:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 534852018-07-03T05:00:0003 July 2018 05:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition En Revision Imported Date 8/1/2018 ENS 532232018-02-20T18:25:00020 February 2018 18:25:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition All Three Auxiliary Feedwater Pumps Inoperable Due to Helb Door Being Open ENS 529052017-08-15T16:46:00015 August 2017 16:46:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovery of Non-Conforming Conditions During Tornado Hazards Analysis ENS 526072017-03-13T18:58:00013 March 2017 18:58:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovery of Non-Conforming Conditions During Tornado Hazards Analysis ENS 518742016-04-20T19:05:00020 April 2016 19:05:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Essential Service Water Pressure Transient ENS 506252014-11-19T01:00:00019 November 2014 01:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to All Four Safety Injection Accumulators Inoperable ENS 504742014-09-19T16:34:00019 September 2014 16:34:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to a Postulated Hot-Short Fire Event That Could Adversely Impact Safe Shutdown Equipment ENS 494222013-10-09T20:00:0009 October 2013 20:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated Fire Event Could Result in a Hot Short That Could Adversely Impact Safe Shutdown Equipment ENS 478852012-05-01T18:00:0001 May 2012 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Floor Drain Blockage Adversely Affects Asumptions of Pipe Break Analysis for Electrical Switghear Rooms ENS 477832012-03-28T20:00:00028 March 2012 20:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Degraded Condition Identified in the B Train Containment Cooler Units ENS 474262011-11-09T23:50:0009 November 2011 23:50:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Failure of High Density Polyethylene Piping in Esw System ENS 470842011-07-21T16:00:00021 July 2011 16:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Adverse Effect on Esw Train During a Postulated Control Room Fire ENS 467152011-03-31T19:32:00031 March 2011 19:32:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Identified for Inoperable Rwst Level ENS 466932011-03-24T04:54:00024 March 2011 04:54:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Pressure Transmitters Needed for Auxiliary Feedwater Suction Path Not Analyzed for Potential High Energy Line Break ENS 465972011-02-07T15:18:0007 February 2011 15:18:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition High Energy Line Break Analysis for Aux Steam to the Auxiliary Building ENS 457472010-03-05T19:25:0005 March 2010 19:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Steam Supply Valve Credited as Closed in Fsar Analysis Is Normally Open During Operations ENS 455712009-12-15T20:30:00015 December 2009 20:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Helb Configuration Calculations Not Consistent with Previous Helb Analysis ENS 422422006-01-04T19:45:0004 January 2006 19:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Related to Emergency Diesel Fuel Oil Tank Vortex Formation ENS 413262005-01-12T19:30:00012 January 2005 19:30:00 Other Unspec Reqmnt, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 24 Hour Condition of License Report Regarding Halon System Actuator Port Connection Error ENS 403732003-12-03T18:30:0003 December 2003 18:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Emergency Procedure Deficiency Causes Unanalyzed Condition 2020-07-30T13:15:00 | |
Retrieved from "https://kanterella.com/wiki/index.php?title=ENS_51874&oldid=421080"