ENS 40373
ENS Event | |
---|---|
18:30 Dec 3, 2003 | |
Title | Emergency Procedure Deficiency Causes Unanalyzed Condition |
Event Description | While reviewing operator emergency response times contained in Callaway Plant's Final Safety Analysis Report (FSAR), it was determined that emergency procedure E-0 did not contain specific guidance for actions to be taken when one train of Control Room Emergency Ventilation System (CREVS) failed to properly operate. In FSAR Chapter 15A, the limiting single failure analyzed for the CREVS is the failure of a filtration fan within one train of CREVS. In this accident analysis scenario, a Control Room Filtration Unit fan fails and the train must be secured to prevent inadequately filtered Control Building air from being introduced into the Control Room. If the train is not isolated within 30 minutes, postulated dose to Control Room staff could potentially exceed GDC 19 limits.
While procedure E-0 addressed identifying faulted CREVS equipment and an attempted restoration of the faulted equipment, it did not contain sufficient guidance to ensure the Control Room staff would isolate the faulted train of CREVS if the equipment restoration attempt failed. A revision to procedure E-0 has been issued to correct this procedural deficiency. The licensee has notified the NRC Resident Inspector.
This notification is being retracted. Further evaluations concluded that a local area radiation monitor would have alerted the Control Room staff to a developing adverse condition in sufficient time for operators to have identified and isolated the faulted CREVS train prior to exceeding regulatory dose limits. This event does not represent an unanalyzed condition reportable per 10CFR50.72(b)(3)(ii)(B)." The NRC Resident Inspector was notified of this retraction by the licensee. Notified R4 DO (A. Gody) |
Where | |
---|---|
Callaway Missouri (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-1.1 h-0.0458 days <br />-0.00655 weeks <br />-0.00151 months <br />) | |
Opened: | David Lantz 17:24 Dec 3, 2003 |
NRC Officer: | Jeff Rotton |
Last Updated: | Feb 2, 2004 |
40373 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40373\u003C/a\u003E - \u003Ca href=\"/Callaway\" title=\"Callaway\"\u003ECallaway\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EEmergency Procedure Deficiency Causes Unanalyzed Condition\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40373 - Callaway\n","link":"","lat":38.76076111111111,"lon":-91.78175833333333,"icon":"/w/images/0/06/Ameren_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 548062020-07-30T13:15:00030 July 2020 13:15:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 534852018-07-03T05:00:0003 July 2018 05:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition En Revision Imported Date 8/1/2018 ENS 532232018-02-20T18:25:00020 February 2018 18:25:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition All Three Auxiliary Feedwater Pumps Inoperable Due to Helb Door Being Open ENS 529052017-08-15T16:46:00015 August 2017 16:46:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovery of Non-Conforming Conditions During Tornado Hazards Analysis ENS 526072017-03-13T18:58:00013 March 2017 18:58:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovery of Non-Conforming Conditions During Tornado Hazards Analysis ENS 518742016-04-20T19:05:00020 April 2016 19:05:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Essential Service Water Pressure Transient ENS 506252014-11-19T01:00:00019 November 2014 01:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to All Four Safety Injection Accumulators Inoperable ENS 504742014-09-19T16:34:00019 September 2014 16:34:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to a Postulated Hot-Short Fire Event That Could Adversely Impact Safe Shutdown Equipment ENS 494222013-10-09T20:00:0009 October 2013 20:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated Fire Event Could Result in a Hot Short That Could Adversely Impact Safe Shutdown Equipment ENS 478852012-05-01T18:00:0001 May 2012 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Floor Drain Blockage Adversely Affects Asumptions of Pipe Break Analysis for Electrical Switghear Rooms ENS 477832012-03-28T20:00:00028 March 2012 20:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Degraded Condition Identified in the B Train Containment Cooler Units ENS 474262011-11-09T23:50:0009 November 2011 23:50:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Failure of High Density Polyethylene Piping in Esw System ENS 470842011-07-21T16:00:00021 July 2011 16:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Adverse Effect on Esw Train During a Postulated Control Room Fire ENS 467152011-03-31T19:32:00031 March 2011 19:32:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Identified for Inoperable Rwst Level ENS 466932011-03-24T04:54:00024 March 2011 04:54:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Pressure Transmitters Needed for Auxiliary Feedwater Suction Path Not Analyzed for Potential High Energy Line Break ENS 465972011-02-07T15:18:0007 February 2011 15:18:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition High Energy Line Break Analysis for Aux Steam to the Auxiliary Building ENS 457472010-03-05T19:25:0005 March 2010 19:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Steam Supply Valve Credited as Closed in Fsar Analysis Is Normally Open During Operations ENS 455712009-12-15T20:30:00015 December 2009 20:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Helb Configuration Calculations Not Consistent with Previous Helb Analysis ENS 422422006-01-04T19:45:0004 January 2006 19:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Related to Emergency Diesel Fuel Oil Tank Vortex Formation ENS 413262005-01-12T19:30:00012 January 2005 19:30:00 Other Unspec Reqmnt, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 24 Hour Condition of License Report Regarding Halon System Actuator Port Connection Error ENS 403732003-12-03T18:30:0003 December 2003 18:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Emergency Procedure Deficiency Causes Unanalyzed Condition 2020-07-30T13:15:00 | |