Title | Automatic Reactor Scram Due to Main Turbine Trip |
Event Description | While operating at 100% power on 12/01/2013, at 0613 EST, the main turbine tripped on moisture separator hi level. The reactor scrammed along with the main turbine trip. All safety systems responded as designed and expected. There was no radiological release. There were no injuries.
During the scram, all rods inserted into the core. The plant is stable in mode 3 in its normal shutdown electrical line up. Decay heat is being removed via the turbine bypass valves dumping steam to the main condenser. The licensee notified the NRC Resident Inspector and will be notifying Lower Alloways Creek township. |
Where | |
---|---|
Hope Creek New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
LER: | 05000354/LER-2013-008 |
Time - Person (Reporting Time:+-1.18 h-0.0492 days <br />-0.00702 weeks <br />-0.00162 months <br />) | |
Opened: | Lindsay Koberlein 10:02 Dec 1, 2013 |
NRC Officer: | Howie Crouch |
Last Updated: | Dec 1, 2013 |
49592 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 568892023-12-15T00:39:00015 December 2023 00:39:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 541982019-08-03T23:47:0003 August 2019 23:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Manual Actuation of Reactor Core Isolation Cooling ENS 514302015-09-29T00:46:00029 September 2015 00:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Following Trip of Both Reactor Recirculation Pumps ENS 496082013-12-05T08:25:0005 December 2013 08:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Following Turbine Trip on High Moisture Separator Level ENS 495922013-12-01T11:13:0001 December 2013 11:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Main Turbine Trip ENS 491082013-06-12T17:33:00012 June 2013 17:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Circulating Water Pump Trip Leads to Reactor Scram ENS 450742009-05-17T07:35:00017 May 2009 07:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Scram Air Header ENS 431322007-01-30T04:10:00030 January 2007 04:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Low Reactor Pressure Vessel (Rpv) Water Level ENS 411092004-10-10T22:14:00010 October 2004 22:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Manual Reactor Scram Due to a Steam Leak in the Turbine Building ENS 404372004-01-12T15:48:00012 January 2004 15:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Following Invalid Containment Isolation Signal ENS 402242003-10-04T21:13:0004 October 2003 21:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation While Critical 2023-12-15T00:39:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_49592&oldid=422652"