ENS 47853
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
19:30 Apr 19, 2012 | |
Title | Hpci Failed Trip Testing Surveillance |
Event Description | On 04/19/12 at 1430 while performing 1-SR-3.5.1.7, HPCI [High Pressure Coolant Injection] Main & Booster Pump Set developed head & flow rate at rated reactor pressure. The HPCI turbine failed to trip using the manual trip pushbutton. This manual trip pushbutton should have caused the 1-FCV-73-18, HPCI TURBINE STOP VALVE, to go closed. HPCI was secured by taking the 1-FCV-73-16, HPCI TURBINE STEAM SUPPLY VALVE, to close. The 1-FCV-73-18, HPCI TURBINE STOP VALVE, also failed to go closed locally using the 1-XCV-73-18, HPCI TURBINE MECHANICAL TRIP, nor did it go closed when the auxiliary oil pump was secured.
With the 1-FCV-73-18, HPCI TURBINE STOP VALVE, open, the HPCI ramp generator is no longer in the circuit therefore, should an initiation occur and cause the 1-FCV-73-16, HPCI TURBINE STEAM SUPPLY VALVE, to open there is the potential for the HPCI turbine to over speed. Therefore, HPCI was isolated using 1-FCV-73-3, HPCI STEAM LINE OUTBD ISOL VALVE. This incident is reportable as an 8-hour ENS notification under 10CFR 50,72 (b)(3)(v) as 'any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.' It also requires a 60 day written report in accordance with 10CFR 50.73(a)(2)(vii). The NRC Resident Inspector has been notified. |
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+1.47 h0.0613 days <br />0.00875 weeks <br />0.00201 months <br />) | |
Opened: | Rodney Nacoste 20:58 Apr 19, 2012 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Apr 19, 2012 |
47853 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47853&oldid=86669"