05000445/FIN-2018010-01
Jump to navigation
Jump to search
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2018010 Section 1R21 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21M |
Inspectors (proximate) | J Braisted B Correll C Speer M Bloodgood R Deese C Baron S Gardner T Farnholtz D Reinert |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XI |
INPO aspect | |
' | |