| Q | CCA | Title |
---|
05000382/FIN-2017001-01 | 2017Q1 | | Failure to Perform Field Changes in Accordance with Design Control Measures |
05000382/FIN-2017002-01 | 2017Q2 | H.5 | Failure to Prepare the Site for Impending Adverse Weather |
05000382/FIN-2017002-02 | 2017Q2 | H.4 | Failure to Ensure Containment Equipment Hatch Closure Prior to RCS Time to Boil |
05000382/FIN-2017002-03 | 2017Q2 | H.3 | Failure to Ensure Appropriate Testing of TSP Baskets Inside Containment |
05000382/FIN-2017002-04 | 2017Q2 | H.14 | Failure to Perform a Post Maintenance Test on a Main Steam Isolation Valve Solenoid Valve |
05000382/FIN-2017002-05 | 2017Q2 | H.12 | Failure to Perform Maintenance on the Correct Safety-Related Component |
05000382/FIN-2017010-01 | 2017Q3 | | Failure to Evaluate Departures from Approved Methodologies for Reactor Vessel Fluence |
05000382/FIN-2017008-01 | 2017Q4 | | Three examples of Failure to Establish and Maintain Preventive Maintenance Procedures for Safety-Related Electrical Equipment |
05000382/FIN-2017008-02 | 2017Q4 | H.11 | Failure to Meet RG 1.9 Emergency Diesel Testing Requirements during Surveillance Test Results in Missed Surveillance |
05000382/FIN-2017008-03 | 2017Q4 | | Two Examples of Failure to Submit and Receive Prior Authorization of Alternatives to ASME OM Code Leak Testing Requirements |
05000382/FIN-2017008-04 | 2017Q4 | | Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval |
05000382/FIN-2017403-01 | 2017Q4 | P.6 | Security |