Finding | |
---|---|
Title | Risk Mitigation Actions Not Performed for Excavation of Nuclear River System Cable Conduits |
Description | The inspectors identified a finding of very low safety significance (Green) involving a non-cited violation (NCV) of 10 CFR Part 50.65(a)(4), Requirements for monitoring the effectiveness of maintenance at nuclear power plants, because Exelon did not implement risk management actions (RMAs) to manage risk associated with the nuclear service river pump B (NR-P-1B) during excavation for fire service piping replacement. Specifically, the excavation exposed a cable conduit duct bank containing safety-related cables for nuclear service river valve 1B (NR-V-1B) without having adequate RMAs in place to ensure NR-V- 1B cabling would remain protected from a tornado generated missiles. Exelon entered the condition into their corrective action program as IR 1670876 and took immediate corrective actions to modify the work instructions to include RMAs for soil restoration over the conduit duct bank in the event of a tornado. The performance deficiency is more than minor because it is associated with the Protection Against External Factors attribute of the Mitigating Systems cornerstone, and adversely affected the cornerstones objective to ensure the availability and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated the findings using IMC 0609.04, Initial Characterization of Findings. The finding involved the licensees management of risk in accordance with 10 CFR 50.65(a)(4) therefore, the inspectors evaluated the significance using IMC 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process. The inspectors determine that this performance deficiency was of very low safety significance (Green) because the finding was associated with RMAs only and the incremental core damage probability (IDCP) was not >1E-6. This finding has a cross-cutting aspect in the area of Human Performance, Work Management; because Exelon did not manage risk associated with the underground piping replacement project and did not effectively communicate job activities between work groups to ensure the RMAs would be implemented as required. |
Site: | Three Mile Island |
---|---|
Report | IR 05000289/2014003 Section 1R13 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | B Bollinger D Werkheiser H. Anagnostopoulus J Brand J Heinly J Tomlinson K Mangan R Rolph W Schmidt |
Violation of: | 10 CFR 50.65(a)(4) 10 CFR 50.65 |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |