| Q | CCA | Title |
---|
05000289/FIN-2013005-01 | 2013Q4 | P.3 | Improper Storage of Material in Reactor Building |
05000289/FIN-2013005-02 | 2013Q4 | | Failure to Perform Leak Rate Testing on Containment Boundary Piping |
05000289/FIN-2014002-01 | 2014Q1 | P.5 | Failure to Perform a 10 CFR 50.59 Evaluation for the BWST Seismic Qualifications |
05000289/FIN-2014002-02 | 2014Q1 | H.8 | Loss of Air Intake Tunnel Sump Pump Function due to Inadequate Work Execution |
05000289/FIN-2014002-03 | 2014Q1 | H.7 | Failure to Restore Station Blackout Diesel Generator Cooling Water Lineup following Maintenance and Testing Activities |
05000289/FIN-2014009-01 | 2014Q2 | P.2 | Inadequate Corrective Actions for a Condition Adverse to Quality that Caused the Failure of Two Primary Containment Isolation Valves |
05000289/FIN-2014003-01 | 2014Q2 | H.5 | Risk Mitigation Actions Not Performed for Excavation of Nuclear River System Cable Conduits |
05000289/FIN-2014003-02 | 2014Q2 | | UFSAR Max Hypothetical Dose Not Updated, Consistent with Current Plant Conditions |