05000263/FIN-2011003-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Update USAR for Cask Lift Height Restrictions |
Description | A Severity Level IV non-cited violation (NCV) of 10 CFR 50.71(e),Periodic Update of the Final Safety Analysis Report and an accompanying Green finding were identified by the inspectors for the licensees failure to update the Updated Safety Analysis Report (USAR) with the cask maximum lift height restrictions imposed by Nuclear Regulatory Commission (NRC) staff. As a result, the licensee had not adequately evaluated whether the plant licensing basis necessitated retention of cask lift height limitations when transitioning from the use of the 25 ton NFS-4 or 25 ton NAC-1 spent fuel shipping cask and 70 ton IF-300 spent fuel shipping cask to the heavier 105 ton NUHOMS cask. The licensee entered this issue into its corrective action system. The inspectors determined that the failure to update the USAR with the cask lift height restrictions for the 25 ton and 70 ton spent fuel cask was contrary to 10 CFR 50.71(e) and was a performance deficiency warranting a significance evaluation. Violations of 10 CFR 50.71 (e) are dispositioned using the traditional enforcement process instead of the SDP because they are considered to be violations that potentially impede or impact the regulatory process. However, if possible, the underlying finding is evaluated under the SDP to determine the significance of the violation. The finding was determined to be more than minor in accordance with IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, because, if left uncorrected, the performance deficiency could have led to a more significant safety concern. Specifically, the inspectors could not readily conclude that the absence of lift height limitations would not require additional calculational analyses and/or require a license amendment. The inspectors determined that the finding was of very low safety significance following a qualitative significance determination review. Specifically, the inspectors determined that only seismic events exceeding the level of an Operational Basis Earthquake (OBE) of 0.03g could impact core damage frequency (CDF). The licensee supplied information that the median annual probability of exceeding the peak ground acceleration for the OBE at Monticello was approximately 7.0E-4/yr. In addition, the predicted shipping cask lifts was 19.2/yr with an average lift duration of 30 minutes. Thus, the frequency of exceeding the OBE while lifting a shipping cask was estimated to be 7.7E-7/year. This value is a bounding frequency estimate for delta-CDF in that it does not imply with certainty that there will be a cask drop during an earthquake nor does it imply with certainty of core damage during an earthquake given a cask drop. The Senior Reactor Analyst (SRA) concluded that the risk due to simultaneous occurrence of an OBE or greater seismic event during use of the reactor building crane for shipping cask lifts was best characterized as very low (Green). The inspectors determined that this finding did not reflect current performance because it was a legacy issue with the failure to properly update the USAR occurring almost 30 years ago and, therefore, there was no cross-cutting aspect associated with this finding. |
Site: | Monticello |
---|---|
Report | IR 05000263/2011003 Section 1R20 |
Date counted | Mar 31, 2011 (2011Q1) |
Type: | TEV: Severity level IV |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.2 |
Inspectors (proximate) | K Riemer M Mitchell S Thomas J Bozga P Voss A Scarbeary |
INPO aspect | |
' | |
Finding - Monticello - IR 05000263/2011003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Monticello) @ 2011Q1
Self-Identified List (Monticello)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||