ENS 57021 | Hatch | 11 March 2024 17:37:00 | Manual Reactor Trip | |
ENS 56975 | Hatch | 18 February 2024 16:33:00 | Fitness for Duty | Fitness for Duty |
ENS 56959 | Hatch | 11 February 2024 15:11:00 | Primary Containment Degraded | |
ENS 56896 | Hatch | 18 December 2023 07:23:00 | High Pressure Coolant Injection System Inoperable | |
ENS 56897 | Hatch | 2 November 2023 01:11:00 | 60 Day Notification for an Invalid Specified System Actuation | |
ENS 56826 | Hatch | 1 November 2023 10:48:00 | Manual Reactor Trip Due to Trip of Reactor Feed Pump | |
ENS 56779 | Vogtle | 7 August 2023 18:39:00 | 60-DAY Optional Telephonic Notification for an Invalid Specified System Actuation | |
ENS 56648 | Vogtle | 31 July 2023 19:06:00 | Failed Fitness for Duty Test | Fitness for Duty |
ENS 56632 | Vogtle | 21 July 2023 15:48:00 | Automatic Reactor Trip | |
ENS 56614 | Vogtle | 9 July 2023 17:28:00 | Automatic Reactor Trip | |
ENS 56497 | Vogtle | 2 May 2023 08:23:00 | Manual Reactor Trip | |
ENS 56460 | Vogtle | 10 April 2023 04:48:00 | Automatic Reactor Trip | |
ENS 56446 | Hatch | 31 March 2023 18:32:00 | Manual Reactor Scram and Automatic Actuation of Containment Isolation Valves (Civs) | |
ENS 56415 | Vogtle | 16 March 2023 12:45:00 | Failed FITNESS-FOR-DUTY (FFD) Test | |
ENS 56414 | Vogtle | 16 March 2023 01:57:00 | Automatic Reactor Trip | |
ENS 56367 | Vogtle | 16 February 2023 12:43:00 | Failed Fitness for Duty Test | Fitness for Duty |
ENS 56342 | Hatch | 7 February 2023 22:38:00 | Primary Containment Degraded | Local Leak Rate Testing |
ENS 56311 | Vogtle | 14 January 2023 12:21:00 | Manual Actuation of Reactor Protection System (RPS) | |
ENS 56294 | Vogtle | 4 January 2023 03:59:00 | Loss of Offsite Power Source | |
ENS 56231 | Vogtle | 17 November 2022 15:09:00 | Fitness for Duty Report | Fitness for Duty |
ENS 56175 | Vogtle | 23 October 2022 08:05:00 | Stage Four Automatic Depressurization System (ADS) Inoperable | |
ENS 56147 | Vogtle | 6 October 2022 06:44:00 | Automatic Actuation of Reactor Protection System (RPS) | |
ENS 56115 | Vogtle | 17 September 2022 02:57:00 | Fitness for Duty (FFD) Report | Fitness for Duty |
ENS 56114 | Vogtle | 17 September 2022 02:57:00 | Fitness for Duty (FFD) Report | Fitness for Duty |
ENS 56113 | Hatch | 17 September 2022 02:57:00 | Fitness for Duty (FFD) Report | Fitness for Duty |
ENS 55875 | Vogtle | 3 May 2022 19:41:00 | Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System | |
ENS 55735 | Vogtle | 7 February 2022 14:14:00 | Fitness for Duty Report | Fitness for Duty |
ENS 55679 | Hatch | 29 December 2021 20:52:00 | Manual Reactor Trip and Automatic Actuation of Containment Isolation Valves | |
ENS 55552 | Vogtle | 29 October 2021 14:10:00 | Contractor Supervisor FITNESS-FOR-DUTY Failure | |
ENS 55448 | Hatch | 8 September 2021 05:59:00 | Unit 1 High Pressure Coolant Injection (HPCI) System Inoperable | |
ENS 55420 | Hatch | 20 August 2021 12:43:00 | Fitness for Duty Report | Fitness for Duty |
ENS 55394 | Hatch | 3 August 2021 14:26:00 | Automatic Reactor Trip | |
ENS 55328 | Vogtle | 24 June 2021 04:00:00 | 10 Cfr 50.55(E) Report Regarding Electrical Construction and Measuring and Test Equipment Control | |
ENS 55303 | Hatch | 11 June 2021 21:10:00 | Technical Specificiation Required Shutdown | Unidentified leakage |
ENS 55185 | Vogtle | 9 April 2021 18:05:00 | Fitness for Duty Report | Fitness for Duty |
ENS 55188 | Hatch | 18 February 2021 03:20:00 | Automatic Actuation of Group 2 Containment Isolation Logic | |
ENS 55187 | Hatch | 13 February 2021 03:23:00 | Automatic Actuation of Group I Containment Isolation Logic | |
ENS 55055 | Vogtle | 3 January 2021 11:45:00 | Nonfunctional Seismic Monitoring System | Earthquake |
ENS 54995 | Vogtle | 12 November 2020 22:32:00 | Automatic Reactor Trip Due to Turbine Trip | |
ENS 54963 | Vogtle | 19 October 2020 08:00:00 | Update to Acceptance Criteria for Itaac | |
ENS 54864 | Vogtle | 26 August 2020 04:00:00 | Design Change Altered Basis for ITAAC | |
ENS 54776 | Vogtle | 13 July 2020 12:31:00 | Supervisor Failed Fitness for Duty Test | Fitness for Duty |
ENS 54677 | Hatch | 22 April 2020 14:15:00 | High Pressure Coolant Injection System (Hpci) Inoperable | |
ENS 54650 | Vogtle | 8 April 2020 12:42:00 | Fitness-For-Duty - Licensed Supervisor Confirmed Positive for Alcohol | |
ENS 54596 | Vogtle | 21 March 2020 20:44:00 | Automatic Actuation of the 1B Emergency Diesel Generator | |
ENS 54491 | Hatch | 22 January 2020 01:05:00 | Fitness for Duty (Ffd) Issue Involving Contract Personnel | Fitness for Duty |
ENS 54463 | Hatch | 4 January 2020 16:09:00 | Primary Containment Degraded | |
ENS 54359 | Vogtle | 29 October 2019 13:09:00 | Fitness for Duty - Contract Supervisor Failed Random Test | Fitness for Duty |
ENS 54318 | Vogtle | 9 October 2019 14:23:00 | Automatic Start of Emergency Diesel Generator and Auxilliary Feedwater System | |
ENS 54237 | Hatch | 23 August 2019 02:34:00 | High Pressure Coolant Injection (Hpci) System Inoperable | |
ENS 54175 | Vogtle | 19 July 2019 13:45:00 | Automatic Reactor Trip Due to Main Steam Isolation Valve Failing Shut | |
ENS 54018 | Vogtle | 22 April 2019 15:30:00 | En Revision Imported Date 5/1/2019 | |
ENS 54017 | Vogtle | 22 April 2019 15:30:00 | Contract Supervisor Test Positive for Drugs on a Follow-Up Test | |
ENS 53967 | Vogtle | 31 March 2019 01:30:00 | Manual Reactor Trip Due to Msiv Failing Closed | |
ENS 53953 | Hatch | 24 March 2019 05:59:00 | Manual Reactor Scram Due to Degrading Condenser Vacuum | |
ENS 53944 | Hatch | 19 March 2019 05:40:00 | High Pressure Coolant Injection System Inoperable | |
ENS 53893 | Hatch | 23 February 2019 07:12:00 | Automatic Actuation of 2C Emergency Diesel Generator | |
ENS 53832 | Vogtle | 17 January 2019 05:00:00 | Fitness-For-Duty - Contractor Supervisor Confirmed Positive for Alcohol | |
ENS 53789 | Vogtle | 12 December 2018 05:00:00 | Contractor Supervisor Subverts a Follow-Up Fitness for Duty Test | Fitness for Duty |
ENS 53817 | Hatch | 12 November 2018 05:00:00 | Invalid Specified System Actuation | |
ENS 53643 | Vogtle | 4 October 2018 04:00:00 | En Revision Imported Date 10/22/2018 | |
ENS 53628 | Vogtle | 27 September 2018 04:00:00 | Fitness for Duty - Contractor Supervisor Tests Positive | Fitness for Duty |
ENS 53610 | Vogtle | 17 September 2018 04:00:00 | Contract Supervisor Test Positive on Random Fitness for Duty Test | Fitness for Duty |
ENS 53599 | Vogtle | 12 September 2018 04:00:00 | Contractor Supervisor Tests Positive on Fitness-For-Duty Test | |
ENS 53595 | Vogtle | 11 September 2018 04:00:00 | Contractor Supervisor Tests Positive on Fitness-For-Duty Test | |
ENS 53563 | Vogtle | 24 August 2018 04:00:00 | Contractor Supervisor Subverts a Follow-Up Fitness for Duty Test | Fitness for Duty |
ENS 53538 | Vogtle | 7 August 2018 04:00:00 | Contractor Supervisor Tests Positive for Alcohol | |
ENS 53528 | Vogtle | 27 July 2018 04:00:00 | Contractor Supervisor Tests Positive for Alcohol | |
ENS 53526 | Vogtle | 26 July 2018 14:40:00 | Contractor Supervisor Subverts a For-Cause Fitness for Duty Test | Fitness for Duty |
ENS 53517 | Vogtle | 18 July 2018 04:00:00 | Non-Licensed Contract Supervisor Subverts Fitness for Duty Test | Fitness for Duty |
ENS 53515 | Vogtle | 18 July 2018 04:00:00 | Contractor Supervisor Tested Positive for Alcohol | |
ENS 53511 | Vogtle | 17 July 2018 04:00:00 | Non-Licensed Contract Supervisor Tests Positive on Fitness for Duty Test | Fitness for Duty |
ENS 53499 | Vogtle | 9 July 2018 04:00:00 | Contractor Supervisor Tests Positive on Fitness for Duty Test | Fitness for Duty |
ENS 53484 | Vogtle | 3 July 2018 04:00:00 | Manual Reactor Trip Due to High Steam Generator Water Level | |
ENS 53479 | Vogtle | 28 June 2018 04:00:00 | Fitness-For-Duty Test Positive for Non-Licensed Supervisor | |
ENS 53469 | Vogtle | 22 June 2018 04:00:00 | Non-Licensed Supervisory Contractor Subverts Fitness for Duty Test | Fitness for Duty |
ENS 53403 | Vogtle | 16 May 2018 15:33:00 | Fitness-For-Duty Test Positive for Non-Licensed Supervisor | |
ENS 53309 | Vogtle | 2 April 2018 19:15:00 | Contractor Supervisor Tests Positive During Fitness for Duty Test | Fitness for Duty |
ENS 53277 | Vogtle | 21 March 2018 19:50:00 | Fitness for Duty Test Subversion | Fitness for Duty |
ENS 53221 | Vogtle | 20 February 2018 14:25:00 | Fitness for Duty - Contract Supervisor Subverts Fitness for Duty Test | Fitness for Duty |
ENS 53018 | Vogtle | 16 October 2017 12:51:00 | Fitness for Duty - Non Licensed Supervisor Subverted Test | Fitness for Duty |
ENS 52992 | Vogtle | 26 September 2017 09:43:00 | Automatic Start of the 2B Emergency Diesel Due to a Valid Undervoltage Signal | |
ENS 52968 | Vogtle | 13 September 2017 19:30:00 | Contractor Manager Confirmed Positive for Alcohol | |
ENS 52763 | Vogtle | 8 May 2017 12:10:00 | Fitness-For-Duty Report | |
ENS 52818 | Hatch | 27 April 2017 04:29:00 | Invalid Specified System Actuation Due to Failed Relay | |
ENS 52700 | Hatch | 21 April 2017 03:45:00 | Valid Reactor Protection System Actuation While Shutdown | |
ENS 52696 | Hatch | 20 April 2017 07:02:00 | Automatic Reactor Scram During Startup | |
ENS 52803 | Hatch | 17 April 2017 15:20:00 | 60-Day Optional Telephonic Notification of Invalid Specified System Actuation | Half scram |
ENS 52650 | Hatch | 30 March 2017 13:22:00 | Unanalyzed Condition Due to Potential Tornado Generated Missiles | Unanalyzed Condition Tornado Missile Enforcement Discretion Tornado-Generated Missile Tornado Generated Missile |
ENS 52641 | Vogtle | 27 March 2017 13:40:00 | Fitness-For- Duty Test Positive for Non-Licensed Contractor | |
ENS 52619 | Vogtle | 17 March 2017 19:17:00 | Automatic Actuation of Emergency Diesel Generator | |
ENS 52567 | Hatch | 20 February 2017 04:23:00 | Containment Penetration Exceeded Allowable Leakage | |
ENS 52563 | Hatch | 17 February 2017 19:14:00 | Secondary Containment Inoperable | Time of Discovery |
ENS 52685 | Hatch | 17 February 2017 15:21:00 | 60-Day Optional Telephonic Notification of Invalid Specified System Actuation | |
ENS 52558 | Hatch | 16 February 2017 18:20:00 | Unexpected Autostart of an Emergency Diesel Generator | |
ENS 52543 | Hatch | 8 February 2017 16:51:00 | High Pressure Coolant Injection System Inoperable Due to Degraded Dc to Ac Inverter | |
ENS 52534 | Vogtle | 3 February 2017 20:45:00 | Unit 1 Manual Reactor Trip Due to Loop 1 Msiv Starting to Fail Closed | |
ENS 52531 | Hatch | 3 February 2017 19:58:00 | Unanalyzed Condition - Appendix R Fire Analysis | Hot Short Safe Shutdown Unanalyzed Condition Operator Manual Action |
ENS 52526 | Hatch | 1 February 2017 21:05:00 | Unusual Event - Potential Security Event | |
ENS 52518 | Vogtle | 30 January 2017 16:43:00 | Offsite Notification Due to Onsite Fatality | Fatality |