Pages that link to "SR-3.3.2.1.9"
Jump to navigation
Jump to search
The following pages link to SR-3.3.2.1.9:
Displayed 50 items.
- ML15307A349 (← links)
- ML14142A161 (← links)
- ML113430851 (← links)
- ML110200143 (← links)
- ML102920260 (← links)
- ML102380477 (← links)
- RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases (← links)
- ML102660403 (← links)
- ML093140463 (← links)
- ML092220694 (← links)
- ML091270818 (← links)
- ML082460877 (← links)
- RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I (← links)
- ML072120096 (← links)
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- TSTF-07-19, Response to NRC Request for Additional Information (RAI) Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated February 28, 2007 (← links)
- TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) (← links)
- TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) (← links)
- RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 (← links)
- GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (← links)
- L-09-218, Submittal of Technical Specification Bases, Revision 7 (← links)
- L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control (← links)
- GNRO-2008/00014, License Amendment Request, Application to Technical Specification Changes Using the Consolidated Line Item Improvement Process - TSTF-475 Control Rod Notch Testing (← links)
- L-08-046, Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process (← links)
- ML19066A008 (← links)
- ML19094A799 (← links)
- U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases (← links)
- ML19238A308 (← links)
- ML052980008 (← links)
- RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 (← links)
- ML032530038 (← links)
- U-603588, Transmittal of Revision 7 to Clinton Power Station Technical Specification Bases (← links)
- ML021970138 (← links)
- JAFP-02-0124, Revision K to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications (← links)
- ML021750467 (← links)
- ML021680369 (← links)
- RBG-45935, Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases (← links)
- ML20078N270 (← links)
- ML20097C354 (← links)
- ML20108A258 (← links)
- ML20140E321 (← links)
- ML20134A702 (← links)
- ML20134H880 (← links)
- ML20196A140 (← links)
- ML20236S381 (← links)
- ML20217E876 (← links)
- ML20211P287 (← links)
- U-602836, Forwards Rev 7 to Clinton Power Station Usar.Attached Clinton Power Station 10CFR50.59 Rept Identifies All Safety Evaluations for Implemented Changes Affecting USAR for Period of 950430-970630 (← links)
- ML20211E715 (← links)
- RBG-44726, Application for Amend to License NPF-47,adding New Proposed TS 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned in Early Dec 1998 (← links)