Pages that link to "ML18227D863"
Jump to navigation
Jump to search
The following pages link to ML18227D863:
Displayed 40 items.
- ML11293A368 (← links)
- ML11195A147 (← links)
- L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps (← links)
- ML18257A031 (← links)
- L-2014-028, LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process (← links)
- L-2013-219, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d (← links)
- L-2018-100, Submittal of 10 CFR 50.59(d)(2) Summary Report (← links)
- L-2017-100, License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... (← links)
- L-2017-006, Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b. (← links)
- L-2014-369, License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B. (← links)
- L-2014-033, License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement (← links)
- L-2011-276, Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System (← links)
- L-2011-264, Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope Habitability (← links)
- L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 (← links)
- L-2009-177, Supplement to License Amendment Request 196 - Summary of Sump Ph Calculation Inputs, Assumptions, Methodology, and Results (← links)
- L-2009-093, Emergency License Amendment Request No. 197, Revision of Technical Specification 3.9.10: Water Level - Reactor Vessel (← links)
- L-2009-033, Submittal of License Amendment Request No. 195, Application to Delete Technical Specification 3/4.4.10, & to Implement a Technical Specification Improvement to Extend Inspection Interval for Reactor Coolant Pump Flywheels. (← links)
- L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 (← links)
- L-2007-175, Rod Position Indication Systems (← links)
- L-2007-131, Administrative Changes to Technical Specifications to Remove Notes Regarding the Inoperability of Rod Position Indication for Control Rods F-8 (Unit 4) and M-6 (Unit 3) (← links)
- L-2007-083, License Amendment Request (LAR 192) Inoperable Rod Position Indication (← links)
- L-2006-074, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (← links)
- L-2016-128, License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps (← links)
- L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases (← links)
- ML18227D672 (← links)
- ML18227C733 (← links)
- L-76-189, 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters, (← links)
- L-76-192, 05/03/1976 Letter Request to Amend Appendix a of Facility Operating Licenses. Revises Technical Specifications to Conform as Near as Possible to Standard Technical Specifications Without Making Any Hardware Changes (← links)
- L-76-200, 05/20/1976 Letter Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Technical Specification Changes Relating to Surveillance of Containment Building Tendons (← links)
- L-76-199, Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Changes in Response to 04/14/1975 Letter from George Lear Which Requested That Heatup & Cooldown Rates in Technical Specifications ... (← links)
- L-77-106, 04/04/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty (← links)
- L-77-130, 04/28/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs (← links)
- L-77-174, 06/09/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Revised 05/03/1976 Proposal on Subject of Air Filtration Systems (← links)
- L-2005-243, 10 CFR 50.59 Report (← links)
- L-2005-006, Proposed License Amendment Reactor Trip System Technical Specifications Changes (← links)
- L-2005-008, Proposed License Amendment Adoption of Improved Standard Technical Specification (ISTS) Travelers (← links)
- ML041250367 (← links)
- L-2021-096, 10 CFR 50.59(d)(2) Summary Report (← links)
- L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis (← links)