Pages that link to "L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10"
Jump to navigation
Jump to search
The following pages link to L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10:
Displayed 50 items.
- ML15356A185 (← links)
- ML15314A580 (← links)
- ML15183A020 (← links)
- ML15154B079 (← links)
- ML15154B077 (← links)
- ML15149A283 (← links)
- ML15149A282 (← links)
- ML15149A280 (← links)
- ML12151A397 (← links)
- L-2015-260, St. Lucie, Units 1 and 2 - EPU Biological Study Quality Assurance Plan, Final (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 3 of 3 (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 2 of 3 (← links)
- L-2015-160, WCAP-17939-NP, Revision 0, Analysis of Capsule 97 Degrees from the Florida Power & Light Company St. Lucie, Unit 2, Reactor Vessel Radiation Surveillance Program, Part 1 of 3 (← links)
- ML18127A526 (← links)
- L-2011-418, ANP-2903Q1(NP), Revision 0, St Lucie Nuclear Plant Unit 1 EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding. (← links)
- ML103560448 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 10; WCAP-17094-NP, Revision 2, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis (← links)
- ML103560186 (← links)
- L-2010-078, WCAP-17197-NP, Rev. 0, St. Lucie Unit 1 RCS Pressure & Temperature Limits & Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years. (← links)
- ML101160204 (← links)
- L-2010-078, ANP-2903(NP), Rev. 0, St. Lucie Nuclear Plant Unit 1 EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding. (← links)
- ML101160197 (← links)
- ML091340438 (← links)
- ML091250571 (← links)
- ML061520336 (← links)
- L-HU-06-023, Supplement to Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (← links)
- ML061030088 (← links)
- L-HU-06-006, Nuclear Management Company 30-Day Response to Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. (← links)
- L-2015-053, WCAP-17973-NP, Revision 1, Turkey Point, Units 3 and 4, Pressurizer Heater Sleeve Flaw Evaluation to Support Half-Nozzle Repairs, Enclosure 1 (Non-Proprietary) (← links)
- L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. (← links)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years (← links)
- SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation (← links)
- L-2010-299, License Amendment Request for Extended Power Uprate, Attachment 12; WCAP-17070-NP, Revision 0, Westinghouse Setpoint Methodology for Protection Systems (← links)
- L-2009-242, Response to Request for Additional Information on Decommissioning Funding Status for NextEra Energy'S Ownership Interests (← links)
- L-2007-157, Notice of Change of Senior Management Relating to License Transfer (← links)
- L-2007-156, Transfer of Ownership on September 28, 2007 (← links)
- L-2007-149, Notice of Closing Related to NRC Order Approving Transfer of Licenses and Conforming Amendments, Dated July 31, 2007 (← links)
- L-2007-134, Notice of Change of Senior Management & Copy of Non-Qualified Decommissioning Trust Agreement Relating to License Transfer, Per NRC Order Dated July 31, 2007 (← links)
- L-2007-133, Proof of Insurance Related to License Transfer, Per NRC Order Dated July 31, 2007 (← links)
- L-2007-025, Supplemental Response Regarding Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds (← links)
- NRC 2006-0089, License Amendment Request Number 247, Spent Fuel Pool Storage Criticality Control (← links)
- L-HU-06-035, Response to Request for Additional Information for the Point Beach Nuclear Plant in Regards to Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (← links)
- L-HU-06-029, Supplement to Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (← links)
- L-2017-122, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal (← links)
- L-2016-186, Official Service List Change and Distribution for Safeguards Information (← links)
- L-2016-146, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications (← links)
- RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 (← links)
- CNL-17-012, Organization Topical Report, TVA-NPOD89-A (← links)
- L-2014-138, Official Service List Changes (← links)
- L-2013-229, Request for Additional Information - 2013 Decommissioning Funding Status Reports (← links)