Pages that link to "L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2"
Jump to navigation
Jump to search
The following pages link to L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2:
Displayed 50 items.
- ML17067A079 (← links)
- ML17306A989 (← links)
- ML14120A321 (← links)
- ML14119A332 (← links)
- ML13140A043 (← links)
- ML13133A003 (← links)
- ML13120A005 (← links)
- ML12137A870 (← links)
- ML11126A180 (← links)
- ML111250574 (← links)
- ML110950683 (← links)
- ML18115A053 (← links)
- ML12221A329 (← links)
- ML103610279 (← links)
- ML101380296 (← links)
- ML091390288 (← links)
- ML091260374 (← links)
- ML091260371 (← links)
- ML071280378 (← links)
- ML071230082 (← links)
- L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors (← links)
- L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- CNL-18-040, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report (← links)
- CNL-16-057, Transmittal of l0 CFR 50.46 Annual Report (← links)
- CNL-15-053, Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model (← links)
- L-88-017, Response Clarification to Generic Letter 88-017 (← links)
- L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation (← links)
- ML19066A046 (redirect page) (← links)
- L-19-019 (redirect page) (← links)
- L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual (← links)
- CNL-14-035, CFR 50.46 30-Day Report of Changes & Errors to Calculated Peak Cladding Temperature (← links)
- L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) (← links)
- L-19-015, Annual Non-Radiological Environmental Operating Report - 2018 (← links)
- L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision (← links)
- L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report (← links)
- L-19-016, Annual Radiological Environmental Operating Report - 2018 (← links)
- L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report (← links)
- L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions (← links)
- L-19-026, Revised Pressure and Temperature Limits Report (PTLR) (← links)
- L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation (← links)
- L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 (← links)
- L-19-041, Cycle 2 Steam Generator Tube Inspection Report (← links)
- L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met (← links)
- L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies (← links)
- ML051380366 (← links)
- L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision (← links)