Pages that link to "L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System"
← L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System
Jump to navigation
Jump to search
The following pages link to L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System:
Displayed 42 items.
- TAC:ME4640 (← links)
- CAC:MF9805 (← links)
- L-12-001 (redirect page) (← links)
- ML16104A301 (← links)
- ML13024A275 (← links)
- ML13016A376 (← links)
- ML12191A327 (← links)
- ML12067A349 (← links)
- ML12030A143 (← links)
- ML12021A009 (← links)
- L-13-160, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 40 (← links)
- L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal (← links)
- RNP-RA/13-0001, Relief Request (RR)-20 for Limited Examinations Performed in the Fourth Ten-Year Inservice Inspection Program Plan (← links)
- ML13247A157 (← links)
- L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors (← links)
- L-16-308, Request for an Amendment to Revise Technical Specification 3.3.1. Reactor Protection System ≪Rps) Instrumentation. (← links)
- L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-89-010, Revision to the Generic Letter 89-10, Safety-related Motor-operated Valve, Scope (← links)
- L-88-017, Response Clarification to Generic Letter 88-017 (← links)
- L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation (← links)
- L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 (← links)
- L-17-244, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual (← links)
- L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) (← links)
- L-19-015, Annual Non-Radiological Environmental Operating Report - 2018 (← links)
- L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision (← links)
- L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report (← links)
- L-19-016, Annual Radiological Environmental Operating Report - 2018 (← links)
- L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report (← links)
- L-87-002, (BFN) Unit 1, Request for Additional Information (RAI) for Response to Generic Letter (GL) GL 87-02, Supplement 1 (S1) (← links)
- L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions (← links)
- L-19-026, Revised Pressure and Temperature Limits Report (PTLR) (← links)
- L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation (← links)
- L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 (← links)
- L-19-041, Cycle 2 Steam Generator Tube Inspection Report (← links)
- L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met (← links)
- L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies (← links)
- L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision (← links)
- L-19-058, Statement of Payment of Civil Penalty (← links)
- ML19360A259 (redirect page) (← links)
- L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision (← links)
- L-20-006, Unit 2, Emergency Plan Implementing Procedure Revision (← links)
- L-12-001, New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit NYS000469, Indian Point Units 2 & 3, 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System (redirect page) (← links)
- ML12341A292 (redirect page) (← links)
- L-12-001, Units 1 & 2 - Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System Regulatory Commitment Change (redirect page) (← links)
- CAC:MF9805 (← links)
- ML18361A573 (redirect page) (← links)
- L-12-001, U1 and U2 - NRC Inspection of Ti 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative Associated with the OPC Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-11) - IR 05000454(455)/2018011 (redirect page) (← links)
- L-12-001, Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 - Clarification of Request for Additional Information Response and Associated License Amendment Request Revision (redirect page) (← links)
- L-12-001, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 23 (redirect page) (← links)
- L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 (← links)
- L-90-009, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Request for Relief 1-ISI-18, Examination and Testing of Snubbers (← links)
- L-88-004, Completion of NRC Bulletin 88-04, Potential Safety-Related Pump Loss (← links)
- L-87-009, Revisions to the Technical Requirements Manual (TRM) (Revisions 21, 22, 23, 24, 25, 26, and 27) and Technical Specification (TS) Bases (Unit 1 Revisions 22, 23, and 24; Unit 2 Revisions 22 and 23) (← links)
- L-90-017, Technical Specifications (TS) Change 437 - Scram Discharge Volume Water Level Setpoint (← links)
- L-79-012, Regulatory Framework for Restart (← links)