Pages that link to "13R-04"
← 13R-04
Jump to navigation
Jump to search
The following pages link to 13R-04:
Displayed 44 items.
- IR 05000482/2013003 (← links)
- ML13226A255 (← links)
- ML112240223 (← links)
- ML11227A253 (← links)
- ML110350512 (← links)
- ML11269A018 (← links)
- ML103360335 (← links)
- ML101650127 (← links)
- ML100261546 (← links)
- ML092300514 (← links)
- ML091530248 (← links)
- ML090860715 (← links)
- ML090710423 (← links)
- ML090640876 (← links)
- ML090640189 (← links)
- ML090500702 (← links)
- ML083260136 (← links)
- ML081330466 (← links)
- ML081330464 (← links)
- ML073610587 (← links)
- ML070800741 (← links)
- ML070240620 (← links)
- ML063060478 (← links)
- RS-15-131, Response to Request for Additional Information Regarding Proposed Alternative Testing Requirements for Code Class 1, 2, and 3 Snubbers (← links)
- RS-12-134, Relief Request Associated with the Third Inservice Inspection Interval (← links)
- RS-10-118, Response to Request for Additional Information Related to Relief Requests I3R-01, I3R-02, I3R-03, I3R-04, and I3R-05 (← links)
- RS-09-072, Relief Requests Associated with the Third Inservice Inspection Interval (← links)
- RS-09-048, Response to Additional Questions Regarding Braidwood I3R-04, Request for Relief from 10 CFR 50.55a(g)(6)(ii)(E), Reactor Coolant Pressure Boundary Examination Scheduling Requirements in Accordance with 10 CFR 50.55a(a)(3)Ii) (← links)
- RS-09-043, Response to Request for Additional Information Supporting 13R-04 for Relief Request from 10 CFR 50.55a(g)(6)(ii)(E), Reactor Coolant Pressure Boundary Examination Scheduling Requirements in Accordance (← links)
- RS-09-033, Supplemental Information Regarding Relief Request 13R-04 Associated with the Third 10-Year Inservice Inspection (ISI) Interval (← links)
- RS-09-019, Third 10-Year Inservice Inspection Interval, Relief Request 13R-04, Request for Relief from 10CFR50.55a(g)(6)(ii)(E), Reactor Coolant Pressure Boundary Examination Scheduling Requirements in Accordance with 10CFR50.55a(a)(3)(i) (← links)
- HNP-08-038, Transmittal of Third Interval Inservice Inspection Program (← links)
- RA-07-079, Submittal of Program Plan Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inspection (Cisi) Interval (← links)
- RA07-036, Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inservice Inspection (Cisi) Interval (← links)
- BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval (← links)
- BVY 12-086, Inservice Inspection Program Relief Request ISI-PT-02, (Fourth ISI Program Interval) (← links)
- RS-17-072, Fourth 10-Year Interval Inservice Inspection Program Relief Requests (← links)
- BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15) (← links)
- ULNRC-06176, Request I4R-02 for Relief from Requirements of ASME Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports (← links)
- RNP-RA/10-0044, Request for Relief from ASME Boiler and Pressure Vessel Code, Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Interval (Relief Request No. RR-22) (← links)
- ULNRC-05271, 10 CFR 50.55a Requests for Relief from ASME Section XI Inservice Inspection Requirements for Third 10-Year Inspection Interval (← links)
- W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 (← links)
- ET 16-0005, Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval (← links)
- ET 06-0010, Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-04 (← links)