Pages that link to "U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases"
Jump to navigation
Jump to search
The following pages link to U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases:
Displayed 34 items.
- ML062340346 (redirect page) (← links)
- ML060330213 (← links)
- RS-08-111, Supplemental Information Related to Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process (← links)
- RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. (← links)
- RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing (← links)
- RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature (← links)
- RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes (← links)
- RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements (← links)
- RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. (← links)
- RS-06-079, Request for Technical Specification Change to Revise Surveillance Requirement Note (← links)
- RS-16-211, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1 (← links)
- RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- U-604454, Transmittal of Revision 20 to Technical Specification Bases (← links)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases (← links)
- U-604257, Transmittal of Revision 17 to the Technical Specification Bases (← links)
- U-604152, Transmittal of Revision 15 to Technical Specification Bases (← links)
- U-604075, Transmittal of Revision 14 to the Technical Specification Bases (← links)
- U-603987, Transmittal of Revision 13 to Technical Specification Bases (← links)
- U-603908, Transmittal of Revision 12 to the Technical Specification Bases (← links)
- U-603859, Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases (← links)
- U-603781 (redirect page) (← links)
- RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements (← links)
- RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values (← links)
- ML050680222 (← links)
- RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 (← links)
- U-603640, Transmittal of Revision 8 to the Technical Specification Bases (← links)
- ML032680619 (← links)
- RS-03-069, Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations (← links)
- ML020850381 (← links)
- RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b (← links)
- RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values (← links)
- RS-24-031, Enclosure 3: Clinton Power Station, Unit 1, Technical Specifications Bases, Revision 22-09 (← links)