ML020850381
| ML020850381 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/19/2002 |
| From: | NRC/NRR/DLPM |
| To: | |
| Hopkins J | |
| References | |
| TAC MB2256 | |
| Download: ML020850381 (3) | |
Text
S/RVs 3.4.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify the safety function lift setpoints of the required S/RVs are as follows:
Setpoint (psig) 1165 +/- 34.9 1180 +/- 35.4 1190 +/- 35.7 Following testing, lift settings shall be within +/- 1%.
-NOTE N
Valve actuation may be excluded.
Verify each required relief function S/RV actuates on an actual or simulated automatic initiation signal.
SR 3.4.4.3 -- -----
NOTE N
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each required S/RV actuator strokes when manually actuated.
In accordance with the Inservice Testing Program 18 months 18 months I-_____________________
CLINTON Amendment No.144 Number of S/RVs 7
5 4
3.4-11
ECCS-Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.1.5 NOTE-------------------N Vessel injection/spray may be excluded.
Verify each ECCS injection/spray subsystem 18 months actuates on an actual or simulated automatic initiation signal.
NOTE -------------------
Valve actuation may be excluded.
Verify the ADS actuates on an actual or 18 months simulated automatic initiation signal.
NOTE -------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each ADS valve actuator strokes when 18 months manually actuated.
NOTE -------------------
ECCS actuation instrumentation is excluded.
Verify the ECCS RESPONSE TIME for each ECCS injection/spray subsystem is within limits.
18 months CLINTON Amendment No.144 3.5-5
LLS Valves SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 NOTE-------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each LLS valve actuator strokes 18 months when manually actuated.
NOTE-------------------
Valve actuation may be excluded.
Verify the LLS System actuates on an 18 months actual or simulated automatic initiation signal.
Amendment No. 144 CLINTON 3.6-23