Category:Letter type:RS
MONTHYEARRS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-032, Amended Decommissioning Trust Agreements2021-02-25025 February 2021 Amended Decommissioning Trust Agreements RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping 2023-09-07
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21188A0202021-08-11011 August 2021 Issuance of Amendment No. 239 One-Time Extension of Containment Type a Integrated Leakage Rate Test Frequency RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-053, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2020-04-30030 April 2020 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 12018-09-28028 September 2018 Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 RS-18-105, License Amendment Request to Recapture Low-Power Testing Time2018-09-17017 September 2018 License Amendment Request to Recapture Low-Power Testing Time RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2018-04-25025 April 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML18053A1822018-01-31031 January 2018 Enclosure 3 - Clinton Power Station, Unit 1 - Evaluation of Proposed Changes RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements ML18053A1702018-01-31031 January 2018 Attachment 3A - Clinton Power Station, Unit 1 - Marked-up Emergency Plan EP-AA-1000 Pages ML18053A1712018-01-31031 January 2018 Attachment 3B - Clinton Power Station, Unit 1 - Clean Emergency Plan EP-AA-1000 Pages RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation2018-01-0909 January 2018 License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level2017-07-18018 July 2017 License Amendment Request to Revise Spent Fuel Pool Level RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations2017-05-0404 May 2017 License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-211, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 12016-11-0404 November 2016 License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1 ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-143, Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-143, License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition ML16229A2792016-08-11011 August 2016 Attachments 1 - 7: Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-153, License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition2016-07-28028 July 2016 License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. 2023-08-21
[Table view] Category:Technical Specification
MONTHYEARRS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b2020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control U-604454, Transmittal of Revision 20 to Technical Specification Bases2018-12-31031 December 2018 Transmittal of Revision 20 to Technical Specification Bases U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases2017-12-22022 December 2017 Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases RS-16-211, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 12016-11-0404 November 2016 License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. U-604257, Transmittal of Revision 17 to the Technical Specification Bases2015-12-21021 December 2015 Transmittal of Revision 17 to the Technical Specification Bases RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process U-604152, Transmittal of Revision 15 to Technical Specification Bases2013-12-31031 December 2013 Transmittal of Revision 15 to Technical Specification Bases U-604075, Transmittal of Revision 14 to the Technical Specification Bases2012-06-0404 June 2012 Transmittal of Revision 14 to the Technical Specification Bases RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies.2011-06-13013 June 2011 License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing2010-10-28028 October 2010 License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing U-603987, Transmittal of Revision 13 to Technical Specification Bases2010-10-0101 October 2010 Transmittal of Revision 13 to Technical Specification Bases RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-03-0303 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2010-02-15015 February 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) U-603908, Transmittal of Revision 12 to the Technical Specification Bases2009-08-0404 August 2009 Transmittal of Revision 12 to the Technical Specification Bases RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature2009-06-15015 June 2009 Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes2009-04-22022 April 2009 Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes RS-08-111, Supplemental Information Related to Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2008-09-0505 September 2008 Supplemental Information Related to Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im U-603859, Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases2008-05-23023 May 2008 Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process2007-06-21021 June 2007 Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements2007-01-26026 January 2007 Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program.2006-11-16016 November 2006 Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases2006-08-16016 August 2006 Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases RS-06-079, Request for Technical Specification Change to Revise Surveillance Requirement Note2006-06-30030 June 2006 Request for Technical Specification Change to Revise Surveillance Requirement Note ML0603302132006-01-26026 January 2006 Technical Specification Pages Re Addition of Oscillation Power Range Monitor RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements2005-12-0101 December 2005 Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values2005-09-21021 September 2005 Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values ML0506802222005-03-0202 March 2005 Technical Specifications, Increased Flexibility in Mode Restraints RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-042004-05-20020 May 2004 Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-04-30030 April 2004 Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process U-603640, Transmittal of Revision 8 to the Technical Specification Bases2003-11-13013 November 2003 Transmittal of Revision 8 to the Technical Specification Bases ML0326806192003-09-17017 September 2003 Technical Specification for Amendment 158 RS-03-069, Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations2003-03-28028 March 2003 Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0208503812002-03-19019 March 2002 Technical Specification Pages Amendment 144, Changes TS Surveillance Requirements for Manual Actuation of Certain Main Steamline Safety/Relief Valves, Including Those Valves That Provide the Automatic Depressurization 2023-05-25
[Table view] Category:Amendment
MONTHYEARRS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-03-0303 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2010-02-15015 February 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature2009-06-15015 June 2009 Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes2009-04-22022 April 2009 Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process2007-06-21021 June 2007 Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements2007-01-26026 January 2007 Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements RS-06-079, Request for Technical Specification Change to Revise Surveillance Requirement Note2006-06-30030 June 2006 Request for Technical Specification Change to Revise Surveillance Requirement Note ML0603302132006-01-26026 January 2006 Technical Specification Pages Re Addition of Oscillation Power Range Monitor RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements2005-12-0101 December 2005 Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values2005-09-21021 September 2005 Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values ML0506802222005-03-0202 March 2005 Technical Specifications, Increased Flexibility in Mode Restraints RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-04-30030 April 2004 Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0326806192003-09-17017 September 2003 Technical Specification for Amendment 158 RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0208503812002-03-19019 March 2002 Technical Specification Pages Amendment 144, Changes TS Surveillance Requirements for Manual Actuation of Certain Main Steamline Safety/Relief Valves, Including Those Valves That Provide the Automatic Depressurization 2023-05-25
[Table view] |
Text
AmerGen Energy Company, LLC www.exeloncorp.com AmerGenS An Exelon Company 4300 Winfield Road Warrenville, I L60555 RS-06-079 10 CFR 50.90 June 30, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Request for Technical Specification Change to Revise Surveillance Requirement Note Pursuant to 10 CFR 50.90, "Application for amendment of license or construction permit," AmerGen Energy Company, LLC (AmerGen) hereby requests an amendment to Appendix A, Technical Specifications (TS), of Facility Operating License No. NPF-62 for Clinton Power Station (CPS), Unit 1. The proposed change revises the Note preceding TS Surveillance Requirement (SR) 3.4.6.1 to be consistent with the wording in NUREG-1434, "Standard Technical Specifications General Electric Plants, BWR/6," Revision 3.
Specifically, the Note will be revised to read, "Not required to be performed in MODE 3."
The current wording of this Note differs from the Standard TS wording and is not consistent with the required Modes for performance of this Surveillance Requirement.
This proposed revision will support the performance of this SR during the required Modes and will provide the necessary clarification to ensure that the intent of the SR is met.
Attachment 1 to this letter provides the evaluation of the proposed change to the Note preceding TS SR 3.4.6.1. Attachment 2 provides a copy of the marked up TS page and Attachment 3 contains copies of the marked up TS Bases pages provided for information only.
AmerGen is requesting approval of this change by June 30, 2007 with implementation within 60 days of issuance of the amendment.
There are no regulatory commitments contained in this letter.
This proposed change has been reviewed by the CPS Plant Operations Review Committee and approved by the Nuclear Safety Review Board in accordance with the requirements of the Quality Assurance Program.
0ool
June 30, 2006 U. S. Nuclear Regulatory Commission Page 2 AmerGen is notifying the State of Illinois of this application for amendment by transmitting a copy of this letter and its attachments to the designated State Official.
If you have any questions concerning this letter, please contact Mr. Timothy A. Byam at (630) 657-2804.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3 0 th day of June 2006.
Resp ctfully, Keith R. Jury Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Attachments:
- 1. Evaluation of Proposed Changes
- 2. Markup of Proposed Technical Specification Page
- 3. Markup of Proposed Technical Specification Bases Page (For Information Only) cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT 1 Evaluation of Proposed Changes Page 1 of 8
Subject:
Request for Technical Specification Change to Revise Surveillance Requirement Note
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
S
3.0 BACKGROUND
4.0 TECHNICAL ANALYSIS
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL CONSIDERATION
7.0 REFERENCES
ATTACHMENT 1 Evaluation of Proposed Changes Page 2 of 8
1.0 DESCRIPTION
This is a request from AmerGen Energy Company, LLC (AmerGen) to amend Appendix A, Technical Specifications (TS), of Facility Operating License No. NPF-62 for Clinton Power Station (CPS). The proposed change revises the Note preceding TS Surveillance Requirement (SR) 3.4.6.1 to be consistent with the wording of this Note in the Standard TS (Reference 1). The current wording of this Note differs from the Standard TS wording and is not consistent with the required Modes for performance of this Surveillance Requirement. This proposed revision will support the performance of this SR during the required Modes and will provide the necessary clarification to ensure that the intent of the SR is met.
2.0 PROPOSED CHANGE
S The proposed change revises the Note to TS SR 3.4.6.1 to read as follows.
"Not required to be performed in MODE 3."
In addition, the TS Bases will be revised to document the basis for the proposed Note.
The Bases changes will be implemented in accordance with the CPS TS Bases Control Program defined in TS 5.5.11.
3.0 BACKGROUND
TS Section 3.4.6, "Reactor Coolant System (RCS) Pressure Isolation Valve (PIV)
Leakage," requires the leakage from each RCS PIV to be within limit. RCS PIVs are defined as any two normally closed valves in series within the reactor coolant pressure boundary (RCPB). The function of RCS PIVs is to separate the high pressure RCS pressure boundary from an attached low pressure system. This protects the RCS pressure boundary described in 10 CFR 50.2, "Definitions," 10 CFR 50.55a, "Codes and standards," paragraph (c), and Criterion 55 of 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants." This limiting condition for operation (LCO) allows RCS high pressure operation when leakage through these valves exists in amounts that do not compromise safety. RCS PIV leakage is leakage into closed systems connected to the RCS. Although TS Section 3.4.6 provides a limit on allowable PIV leakage rate, its main purpose is to prevent overpressure failure of the low pressure portions of the connecting systems.
LCO 3.4.6 is applicable in Mode 1, "Power Operation," Mode 2, "Startup," and Mode 3, "Hot Shutdown," since the PIV leakage potential is greatest when the RCS is pressurized. In Mode 3, valves in the Residual Heat Removal (RHR) flowpath are not required to meet the requirements of this LCO when in, or during transition to or from, the RHR shutdown cooling mode of operation.
ATTACHMENT 1 Evaluation of Proposed Changes Page 3 of 8 The purpose of TS SR 3.4.6.1 is to verify that leakage is below the specified limit and to identify each leaking valve. The specified leakage limit of 0.5 gallons per minute (gpm) per inch of nominal valve diameter up to 5 gpm maximum at an RCS pressure > 1000 psig and < 1025 psig applies to each valve. Leakage testing requires a stable pressure condition.
SR 3.4.6.1 is modified by a Note that states the leakage surveillance is only required to be performed in Modes 1 and 2. However, the CPS procedure that implements SR 3.4.6.1 indicates that the plant is required to be in Mode 4, "Cold Shutdown," or Mode 5, "Refueling," to conduct this surveillance. As a result, performance of this procedure could be considered to be in conflict with the Note to SR 3.4.6.1. While the Note indicates that performance of SR 3.4.6.1 is only required to performed in Modes 1 and 2, it does not preclude performance of this SR in Modes 4 or 5. However, to provide clarification and ensure this SR is performed in accordance with the intent of the surveillance, AmerGen proposes that this Note be revised to be consistent with the wording provided in the applicable Improved Standard TS (Reference 1).
4.0 TECHNICAL ANALYSIS
As noted above, the primary purpose of this TS is to prevent overpressure failure of the low pressure portions of connecting systems. The leakage limit is an indication that the PIVs between the RCS and the connecting systems are degraded or degrading. PIV leakage could lead to overpressure of the low pressure piping or components. Failure consequences could be a loss of coolant accident (LOCA) outside of containment, an unanalyzed accident that could degrade the ability for low pressure injection. Various PIV configurations, leakage testing of the valves, and operational changes have been evaluated (Reference 2) to determine the effect on the probability of intersystem LOCAs.
This study concluded that periodic leakage testing of the PIVs can substantially reduce the probability of an intersystem LOCA.
As stated in the TS 3.4.6 Bases, this LCO applies in Modes 1, 2, and 3 because the PIV leakage potential is greatest when the RCS is pressurized. In Mode 3, valves in the RHR flowpath are not required to meet the requirements of this LCO when in, or during transition to or from, the RHR shutdown cooling mode of operation. In Modes 4 and 5, leakage limits are not provided because the lower reactor coolant pressure results in a reduced potential for leakage and for LOCA outside the containment. Therefore, the LCO is not applicable in these modes of operation.
Performance of leakage testing on each RCS PIV is required to verify that leakage is below the specified limit and to identify each leaking valve. Leakage testing requires a stable pressure condition and SR 3.4.6.1 iequires verification that the equivalent leakage from each RCS PIV is within the specif ied Ilimits at an RCS pressure
- 1000 psig and 5,1025 psig. The ASME Operations and Maintenance Code (Reference 3), however, permits leakage testing at a lower pressure differential than between the specified maximum RCS pressure and the normal pressure of the connected system during RCS operation (i.e., the maximum pressure differential). In accordance with Reference 3, the
ATTACHMENT 1 Evaluation of Proposed Changes Page 4 of 8 observed rate may be adjusted to the maximum pressure differential by assuming leakage is directly proportional to the pressure differential to the one-half power.
The leakage testing at CPS is performed every 24 months (i.e., in accordance with the Inservice Testing Program) and is performed in Modes 4 or 5 to accommodate required access to areas of the plant not accessible during plant operation. Testing is performed using a test rig capable of producing the high pressures required by this test (i.e., greater than 1000 psig). Since CPS is capable of generating the required pressure to perform this surveillance independent of the reactor, the testing is performed in Modes 4 or 5.
Hence, it is not necessary to perform the surveillance during modes of operation when the RCS is at the pressures required to verify leakage is within the specified limits.
Performing this SR in Modes 4 or 5 allows access to the valves located in the drywell that are being tested. This ensures any necessary repairs can be made prior to entering a Mode in which the LCO is applicable. Testing in Modes 4 or 5 also precludes the potential for an unplanned transient if the surveillance were performed with the reactor at power. The proposed change to the Note preceding SR 3.4.6.1 will not alter the method for performing this testing, the limits the test results are evaluated against or the frequency at which the testing is performed.
Therefore, to gain the benefits associated with performing SR 3.4.6.1 in Modes 4 or 5, AmerGen proposes to revise the Note associated with this SR. By revising the Note to be consistent with the Note provided in Reference 1, entry into Mode 3 is permitted for leakage testing at high differential pressures with stable conditions not possible in the lower Modes. It also ensures that the SR can be performed in Modes 4 or 5. The current Note implies that the SR must be performed in Mode 1 or 2, which is not consistent with the intent of the TS. Revising this Note will ensure there is no confusion in determining when this SR must be performed.
In summary, performance of SR 3.4.6.1 in Modes 4 or 5 will preclude the potential for unplanned transients associated with performing the SR at power. It will also ensure that access to the valves being tested is available in the event that repairs are required.
The proposed revision to the Note associated with SR 3.4.6.1 will provide clarification as to when this SR can be performed and will ensure that the performance of SR 3.4.6.1 can take place in Modes 4 or 5.
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration AmerGen Energy Company (AmerGen), LLC is requesting a revision to the Facility Operating License No. NPF-62 for Clinton Power Station (CPS), Unit 1.
The proposed change revises the Note preceding TS Surveillance Requirement (SR) 3.4.6.1 to be consistent with the wording in NUREG-1434, "Standard Technical Specifications General Electric Plants, BWR/6," Revision 3. The current wording of this Note differs from the Standard TS wording and is not consistent with the desired Modes for performance of this Surveillance
ATTACHMENT 1 Evaluation of Proposed Changes Page 5 of 8 Requirement. This proposed revision will support the performance of this SR during the desired Modes and will provide the necessary clarification to ensure that the intent of the SR is met.
AmerGen has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below.
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment revises the note associated with TS SR 3.4.6.1, which requires verification that the leakage past the Reactor Coolant System (RCS)
Pressure Isolation Valves (PIVs) is less than a specified limit. The proposed revision provides clarification that performance of this SR is allowed during plant shutdown (i.e., a Mode other than Modes 1 and 2).
The proposed change does not require modification to the facility. The proposed change does not affect the operation of any facility equipment, the interface between facility systems, or the reliability of any equipment. In addition, the proposed change does not alter the requirement to perform the leakage testing of the RCS PIVs and does not revise the leakage limits associated with this SR.
The function of the RCS PIVs is to separate the high pressure RCS from an attached low pressure system. Periodic testing of PIVs can substantially reduce intersystem Loss of Coolant Accident (LOCA) probability. Since the proposed change does not alter the method or limits associated with the leak rate testing of the RCS PIVs there is no significant increase in the probability of a LOCA.
Therefore, the proposed amendment does not involve a significant increase in the probability of an accident previously evaluated.
The consequences of a previously analyzed event are dependent on the initial conditions assumed in the analysis, the availability and successful functioning of equipment assumed to operate in response to the analyzed event, and the setpoints at which these actions are initiated. The method for performing the leakage testing of the RCS PIVs and the specified leakage limit for this testing will not change as a result of the proposed revision and, therefore, there is no change in the consequences associated with the LOCA analysis. The radiological consequences remain within applicable regulatory limits. The proposed change does not alter any system's performance measures or the ability to perform its accident mitigation functions. The radiological consequences associated with any previously evaluated accident do not change as a result of the proposed revision. Therefore, the proposed change does not involve a significant increase in the consequences of an accident previously evaluated.
ATTACHMENT 1 Evaluation of Proposed Changes Page 6 of 8 Based on the above, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to the wording of the Note to TS SR 3.4.6.1 clarifies the plant conditions for when the surveillance is required to be performed. The proposed change does not affect the design, functional performance or operation of the facility. No new equipment is being introduced and installed equipment is not being operated in a new or different manner. Similarly, the proposed change does not affect the design or operation of any structures, systems or components involved in the mitigation of any accidents, nor does it affect the design or operation of any component in the facility such that new equipment failure modes are created. There are no setpoints at which protective or mitigative actions are initiated that are affected by this proposed action. No change is being made to procedures relied upon to respond to an off-normal event.
As such the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
Margins of safety are established in the design of components, the configuration of components to meet certain performance parameters, and in the establishment of setpoints to initiate alarms or actions. The proposed change revises a note associated with a surveillance requirement to clarify the plant conditions for when the surveillance needs to be performed. This change involves an administrative clarification to reflect the original intent of the TS. The equipment will continue to be tested in a manner and at a frequency necessary to provide confidence that the equipment can perform its intended safety function.
There is no change in the design of the affected systems, no alteration of the setpoints at which alarms or actions are initiated, and no change in plant configuration from original design. There is no impact on the plant safety analyses.
Therefore, operation of CPS in accordance with the proposed change will not involve a significant reduction in a margin of safety.
ATTACHMENT 1 Evaluation of Proposed Changes Page 7 of 8 Conclusion Based on the above, AmerGen concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92, "Issuance of amendment," paragraph (c), and, accordingly, a finding of no significant hazards consideration is justified.
5.2 Applicable Regulatory Requirements/Criteria The proposed change has been evaluated to determine whether applicable regulations and requirements continue to be met. AmerGen has determined that the proposed change does not require any exemptions or relief from regulatory requirements, other than the Technical Specifications, and does not affect conformance with any General Design Criteria (GDC) differently than described in the CPS Updated Safety Analysis Report (USAR). The proposed change revises the Note associated with TS SR 3.4.6.1 to provide clarification as to when the surveillance is to be performed and does not change the intent of the SR to ensure that equivalent leakage from each RCS PIV is within the specified limit at the specified pressure.
CPS continues to test the PIVs for leakage to verify the RCS pressure boundary is protected in compliance with the requirements of 10 CFR 50.2, "Definitions,"
10 CFR 50.55a, ""Codes and standards," paragraph (c), and Criterion 55 of 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants." The test frequency required by the Inservice Testing Program does not change as a result of the proposed revision and continues to be in accordance with the ASME Code, Section Xl, frequency requirement.
In conclusion, based on the considerations described above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the NRC regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use a facility component located within the restricted area, as defined in 10 CFR 20, "Standards for Protection Against Radiation," or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii)a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22, "Criterion for categorical exclusion; identification of
ATTACHMENT 1 Evaluation of Proposed Changes Page 8 of 8 licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review," paragraph (c)(9). Therefore, pursuant to 10 CFR 51.22, paragraph (b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7.0 REFERENCES
- 1. NUREG-1434, "Standard Technical Specifications General Electric Plants, BWR/6," Volumes 1 and 2, Revision 3.0, dated June 2004
- 2. NUREG-0677, '"he Probability of Intersystem LOCA: Impact Due to Leak Testing and Operational Changes," dated May 1, 1980
- 3. ASME Operations and Maintenance Code, Part 10, "Inservice Testing of Valves in Light-Water Reactor Power Plants," Section 4.2.2.3(b)(4)
ATTACHMENT 2 Markup of Proposed Technical Specification Page
RCS PIV Leakage 3.4.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 4 -
~required to beNOTE -- - -in - MODEO./3 performed - -- - -
SR 3.4.6. --------------------------
NT ---------------
Verify equivalent leakage of each RCS PIV In accordance is
- 0.5 gpm per nominal inch of valve size with Inservice up to a maximum of 5 gpm, at an RCS Testing Program pressure Ž 1000 psig and 5 1025 psig.
CLINTON 3.4-16 Amendment No. 95
ATTACHMENT 3 Markup of Proposed Technical Specification Bases Page (For Information Only)
I*
RCS PIV Leakage B 3.4.6 BASES (continued)
SURVEILLANCE SR 3.4.6.1 REQUIREMENTS Performance of leakage testing on each RCS PIV is required to verify that leakage is below the specified limit and to identify each leaking valve. The leakage limit of 0.5 gpm per inch of nominal valve diameter up to 5 gpm maximum applies to each valve. Leakage testing requires a stable pressure condition. For the two PIVs in series, the leakage requirement applies to each valve individually and not to the combined leakage across both valves. If the PIVs are not individually leakage tested, one valve may have failed completely and not be detected if the other valve in series meets the leakage requirement. In this situation, the protection provided by redundant valves would be lost.
The Frequency required by the Inservice Testing Program is within the ASME Code, SectioP XI, Frequency requirement Therefore, this SR is Mojified by a Note that states the leakage Surveillance is 1 required to be performed in ODE Entry into MODE 3 is permitted for leakage ies ing at high differential pressures with stable conditions not possible in the lower MODES.
With regard to leakage values obtained pursuant to this SR, as read from plant indication instrumentation, the specified limit is considered to be a nominal value and therefore does not require compensation for instrument indication uncertainties (Ref. 9).
(continued) 4-4~ 11a44 alkf%
ctý. 4-ckA4(1le CLINTON B 3.4-32 Revision No. 4-6