ML032680619

From kanterella
Jump to navigation Jump to search

Technical Specification for Amendment 158
ML032680619
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/17/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML032680619 (3)


Text

Primary Containment 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE------------------------------- ----

Applicable Conditions and Required Actions are not required to be entered for the Inclined Fuel Transfer System (IFTS) penetration for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per cycle when the IFTS blind flange is unbolted.

CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore primary 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. containment to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> CLINTON 3. 6-1 Amendment No. 158

PCIVs 3.6.1.3 3.6 CONTAINMENT SYSTEMS 3.6.1.3 Primary Containment Isolation Valves (PCIVs)

LCO 3.6.1.3 Each PCIV shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 for RHR Shutdown Cooling System suction from the reactor vessel isolation valves when associated isolation instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment and Drywell Isolation Instrumentation," Function 5.c.


NOTE---------------------- ------

The following Applicabilities apply only to secondary containment bypass leakage isolation valves.

During CORE ALTERATIONS, During movement of irradiated fuel assemblies in the primary or secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS


NOTES------------------------------------

1. Penetration flow paths may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each penetration flow path.
3. Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
4. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria in MODES 1, 2, and 3.
5. Not applicable for the Inclined Fuel Transfer System (IFTS) penetration when the associated primary containment blind flange is removed, provided that the fuel building fuel transfer pool water is maintained > el. 753 ft., the steam dryer pool to reactor cavity pool gate is installed with the seal inflated and a backup air supply provided, the total time the flange is open does not exceed 40 days per operating cycle, and the IFTS transfer tube drain valve(s) remain(s) closed, except that the IFTS tube drain valve(s) may be opened under administrative controls.

(continued)

CLINTON 3.6-9 Amendment No. 158

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.3 NOTES------------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment Prior to isolation manual valve and blind flange entering MODE 2 that is located inside primary or 3 from containment, drywell, or steam tunnel MODE 4, if not and is required to be closed during performed accident conditions is closed. within the previous 92 days (continued)

CLINTON 3.6-17 Amendment No. 158