Pages that link to "RS-19-051, Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies"
Jump to navigation
Jump to search
The following pages link to RS-19-051, Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies:
Displayed 50 items.
- ML17178A076 (← links)
- ML16074A415 (← links)
- ML14321A705 (← links)
- RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-17-039, Attachments 7 - 10, Affidavits (← links)
- RS-16-061, Braidwood, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Revision (← links)
- RS-14-223, Enclosure C - Application for Withholding Proprietary Information from Public Disclosure Supporting the Following Set 31 RAI Response RAI 4.3.4-3a (← links)
- RS-12-227, Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package (← links)
- RS-12-457, Attachment 4, Cameron International Corporation Affidavit Supporting Withholding of Information in Attachment 3 (Non-Proprietary) (← links)
- ML103190426 (← links)
- EPID:L-2018-LLA-0208 (← links)
- ML18225A229 (← links)
- ML18267A204 (← links)
- RS-18-095, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-03 (← links)
- RS-18-094, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-06 (← links)
- RS-17-084, Response to Request for Additional Information for Byron Station and Braidwood Station Post Peening Relief Requests (← links)
- RS-15-155, Response to Preliminary RAI Regarding Braidwood and Byron Stations Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- ML18316A003 (← links)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ... (← links)
- RS-16-231, Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-172, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-218, Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-085, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-083, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-18-129, Supplement to License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 (← links)
- RS-17-091, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-093, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-16-171, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ 2xSSE with High Frequency Exceedances (← links)
- RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- RS-16-168, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-086, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-112, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-329, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-282, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-266, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-18-099, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- ML19038A489 (← links)
- ML19031C846 (← links)
- ML19031C845 (← links)
- RS-17-138, Stations - Response to Request for Additional Information Related to License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements' (← links)
- RS-17-085, Response to Request for Additional Information Regarding Amendments to Remove Obsolete License and Technical Specification Items (← links)
- RS-16-079, Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems, Including Change to Request NRC Approval Under 10 CFR 50.55a.. (← links)
- RS-16-078, Clarification to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-067, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-045, Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-039, Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems. (← links)