Pages that link to "RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process"
Jump to navigation
Jump to search
The following pages link to RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process:
Displayed 38 items.
- RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I (← links)
- ML071770423 (redirect page) (← links)
- ML090710332 (← links)
- ML060330213 (← links)
- RS-08-111, Supplemental Information Related to Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process (← links)
- RS-07-074, Clinton Power Station, Unit 1, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (redirect page) (← links)
- RS-07-074 (redirect page) (← links)
- RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. (← links)
- RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing (← links)
- RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. (← links)
- RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature (← links)
- RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes (← links)
- RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements (← links)
- RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. (← links)
- RS-06-079, Request for Technical Specification Change to Revise Surveillance Requirement Note (← links)
- RS-16-211, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1 (← links)
- RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- U-604454, Transmittal of Revision 20 to Technical Specification Bases (← links)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases (← links)
- U-604257, Transmittal of Revision 17 to the Technical Specification Bases (← links)
- U-604152, Transmittal of Revision 15 to Technical Specification Bases (← links)
- U-604075, Transmittal of Revision 14 to the Technical Specification Bases (← links)
- U-603987, Transmittal of Revision 13 to Technical Specification Bases (← links)
- U-603908, Transmittal of Revision 12 to the Technical Specification Bases (← links)
- U-603859, Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases (← links)
- U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases (← links)
- RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements (← links)
- RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values (← links)
- ML050680222 (← links)
- RS-04-024, Request for Amendment to Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles in Accordance with the Guidance of Generic Letter 91-04 (← links)
- U-603640, Transmittal of Revision 8 to the Technical Specification Bases (← links)
- ML032680619 (← links)
- RS-03-069, Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations (← links)
- RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing (← links)
- ML020850381 (← links)
- RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b (← links)
- RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values (← links)
- RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (← links)