Pages that link to "RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information"
Jump to navigation
Jump to search
The following pages link to RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information:
Displayed 50 items.
- IR 05000395/2015404 (← links)
- ML17087A151 (← links)
- ML16235A242 (← links)
- ML16028A196 (redirect page) (← links)
- ML17089A617 (← links)
- ML20139A087 (← links)
- ML15310A076 (← links)
- ML15253A721 (← links)
- ML15243A450 (← links)
- ML15147A056 (← links)
- ML14056A067 (← links)
- ML14037A228 (← links)
- ML14034A339 (← links)
- ML13305A100 (← links)
- ML13247A338 (← links)
- ML13203A180 (← links)
- TAC:MF2338 (← links)
- TAC:MF1173 (← links)
- RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) (← links)
- RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ (← links)
- RC-16-0001 (redirect page) (← links)
- RC-13-0123, V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information (← links)
- RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 (← links)
- RC-17-0093, License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. (← links)
- RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information (← links)
- RC-17-0032, Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident (← links)
- RC-16-0077, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information (← links)
- RC-16-0046, Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds (← links)
- RC-16-0036, License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information (← links)
- RC-16-0031, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response (← links)
- RC-16-0028, Notification of an Intended Changed to a Commitment Date for Response to Request for Additional Information Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima.. (← links)
- RC-16-0006, Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis (← links)
- RC-15-0142, License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information (← links)
- RC-15-0125, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RC-15-0126, Fifth 6-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- RC-15-0117, Request for Schedule Relaxation from NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (← links)
- RC-15-0116, Response to NRC Request for Information Baseline Radiation Safety Inspection (← links)
- RC-15-0030, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (← links)
- RC-17-0019, Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 (← links)
- RC-16-0091, Response to Request for Additional Information on Relief Request RR-III-12 Proposed Alternative Inspection Requirements for Piping Welds (← links)
- RC-16-0039, Exigent License Amendment Request - LAR (16-00848), Technical Specification Change Request for Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B - Response to Request for Additional.. (← links)
- RC-15-0031, Fourth 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (← links)
- RC-14-0144, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-04) (← links)
- RC-14-0030, South Carolina Electric & Gas Company'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External.. (← links)
- RC-13-0119, Transmittal of Figures Associated with South Carolina Electric & Gas Company Response to the NRC Request for Additional Information Regarding the VCSNS Overall Integrated Plan (RC-13-0119) (← links)
- RC-13-0117, 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (← links)
- RC-13-0109, Online Reference Portal for Review of Mitigation Strategies, Submittal in Response to Order EA-12-049 (← links)
- RC-13-0031, Integrated Plan with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- ML19071A357 (← links)
- RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information (← links)
- RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information (← links)