Pages that link to "RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report"
Jump to navigation
Jump to search
The following pages link to RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report:
Displayed 50 items.
- ML15280A342 (← links)
- ML15238A900 (← links)
- ML15238A898 (← links)
- ML15238A896 (← links)
- ML15238A883 (← links)
- ML13085A025 (← links)
- ML12195A346 (← links)
- ML12125A297 (← links)
- ML110980601 (← links)
- ML110200322 (← links)
- RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants (← links)
- ML092750008 (← links)
- ML092010498 (← links)
- ML080500179 (← links)
- RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- RA-16-0032, Duke Energy Regulatory Commitment Change Related to Loss of Coolant Accident Reanalysis to Address Fuel Pellet Thermal Conductivity Degradation (← links)
- RA-14-0015, Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2013 for Catawba and McGuire Nuclear Stations (← links)
- ML073200112 (← links)
- ML072120221 (← links)
- ML071350378 (← links)
- ML070950275 (← links)
- ML062340363 (← links)
- ML062060311 (← links)
- ML060740319 (← links)
- ML060390154 (← links)
- RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report (← links)
- CNS-16-020, Inservice Inspection Report for End of Cycle 22 Refueling Outage (← links)
- CNS-15-074, CISI-1462.10.0040, Revision 0, Fourth Interval Inservice Inspection Outage Schedule, Quality Assurance Program Related (← links)
- CNS-15-061, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 20 Refueling Outage (← links)
- CNS-15-047, Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage, Response to NRC Requests for Additional Information (Rais) (← links)
- CNS-14-105, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage (← links)
- CNS-14-001, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 19 Refueling Outage (← links)
- RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. (← links)
- RA-18-0169, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. (← links)
- CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information (← links)
- RA-17-0036, Supplement to the Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- RA-17-0029, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- RA-17-0017, Withdrawal of the License Amendment Request (LAR) to Revise the Updated Final Safety Analysis Report to Reflect Electrical Power System Alignments for Shared Systems (← links)
- RA-16-0028, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- CNS-16-042, Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval (← links)
- RA-16-0021, License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems (← links)
- RA-16-0013, Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0406, Revision 1 (← links)
- CNS-15-022, Request to Use a Portion of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section Xl, for Inservice Inspection Activities (← links)
- RA-18-0162, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal (← links)
- RA-19-0092, Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 (← links)
- RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)
- RA-18-0199, (Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis (← links)
- RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)