Pages that link to "RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections"
Jump to navigation
Jump to search
The following pages link to RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections:
Displayed 50 items.
- RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. (← links)
- RA-18-0169, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. (← links)
- RA-17-0036, Supplement to the Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- RA-17-0029, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- RA-17-0017, Withdrawal of the License Amendment Request (LAR) to Revise the Updated Final Safety Analysis Report to Reflect Electrical Power System Alignments for Shared Systems (← links)
- RA-16-0028, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers (← links)
- RA-16-0021, License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems (← links)
- RA-16-0013, Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0406, Revision 1 (← links)
- RA-18-0162, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal (← links)
- RA-19-0092, Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)
- RA-18-0199, (Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis (← links)
- RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System (← links)
- RA-19-0121, Commitment Change Evaluation Report for 2018 (← links)
- RA-18-0269, Transmittal of Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core (← links)
- RA-19-0209, 2018 Annual Radioactive Effluent Release Report (← links)
- RA-19-0275, Independent Spent Fuel Storage Installation (ISFSI) - Registration of Spent Fuel Storage Cask (← links)
- RA-19-0280, Response to NRC RAI Clarifications Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 (← links)
- RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (← links)
- RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes (← links)
- RA-19-0312, Supplement to License Amendment Request Proposing Changes to the Technical Specification 3.8.1 (← links)
- RA-19-0364, Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core, Rev. 1 (← links)
- RA-19-0365, Core Operating Limits Report (COLR) for Unit 2 Cycle 23 Reload Core, Rev. 1 (← links)
- RA-19-0355, Reply to a Notice of Violation, NRC Inspection Report 05000413/414/2019002-01 (← links)
- RA-19-0357, Reply to a Notice of Violation - NRC Inspection Report 05000413/2019002-04 (← links)
- RA-18-0156, Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability (← links)
- RA-17-0034, Withdrawal of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-285-A, Rev. 1, Charging Pump Sway LTOP Allowance. (← links)
- RA-19-0385, Core Operating Limits Report (COLR) for Unit 2 Cycle 24 Reload Core (← links)
- RA-19-0389, Emergency Plan, Revision 19-04 (← links)
- RA-19-0391, Refuel 23 (C2R23) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-19-0434, Emergency Plan, Revision 19-05 (← links)
- RA-20-0042, SR-2020-001 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Non-Functional for Greater than 7 Days (← links)
- RA-20-0065, Emergency Plan, Revision 20-02 (← links)
- RA-20-0002, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (← links)
- RA-20-0009, Emergency Plan, Revision 20-01 (← links)
- RA-20-0116, Special Report 2020-002-00 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Annual Data Recovery (← links)
- RA-20-0104, Response to NRC Request for Additional Information - Catawba Nuclear Station-SG Report (RA-19-0391)-C2R23 (← links)
- RA-20-0135, Core Operating Limits Report (COLR) for Unit 2 Cycle 24 Reload Core, Rev. 1 (← links)
- RA-20-0186, Core Operating Limits Report (COLR) for Unit 1 Cycle 26 Reload Core (← links)
- RA-21-0106, Core Operating Limits Report (COLR) for Unit 2 Cycle 25 Reload Core (← links)
- RA-21-0145, Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method (← links)
- RA-21-0133, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method (← links)
- RA-21-0100, Proposed Alternative to Use ASME Code Case N-885 for Catawba Nuclear Station Unit 2 (← links)
- RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A (← links)
- RA-21-0223, Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-21-0265, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core (← links)
- RA-21-0283, Commitment Change Evaluation Report for 2020 to October 28, 2021 (← links)
- RA-21-0303, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Revisions 1, 2, and 3 (← links)
- RA-21-0329, Core Operating Limits Report Cycle 25 Reload Core, Rev. 1 (← links)