Pages that link to "RA-22-0046, Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d"
Jump to navigation
Jump to search
The following pages link to RA-22-0046, Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d:
Displayed 50 items.
- RA-18-0073, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D (← links)
- RA-10-010, Submittal of Biennial Decommissioning Funding Status Report Correction (← links)
- RA-18-0202, Transmittal for NRC Confirmatory Calculations (← links)
- RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (← links)
- RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System (← links)
- RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (← links)
- RA-18-0027, Supplement to Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material (← links)
- RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... (← links)
- RA-18-0170, Unit 1 Cycle 22 and Unit 2 Cycle 23 Core Operating Limits Reports (← links)
- RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report (← links)
- RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (← links)
- RA-18-0110, Request for One-Time Allowance to Submit License Amendment Request Referencing Topical Report Draft Safety Evaluation (← links)
- RA-18-0101, Unit 1 Cycle 22 and Unit 2 Cycle 23 Reload Safety Analysis Reports (← links)
- RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 (← links)
- RA-15-0036, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RA-12-015, Carolina Power & Light Company'S Answer to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- RA-09-016, Request for Exemptions from Physical Security Requirements (← links)
- RA-09-020, NRC Correspondence Distribution List Update (← links)
- RA-19-2019, Brunswick 2019-301 Post-Exam Comments (← links)
- RA-19-0083, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation (← links)
- RA-19-0029, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. (← links)
- RA-18-0241, Update to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves (← links)
- RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... (← links)
- RA-18-0258, (Bsep), Unit Nos. 1 and 2 - Ninth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... (← links)
- RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves. (← links)
- RA-18-0132, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes (← links)
- RA-18-0041, (Bsep), Unit Nos. 1 and 2 - Eighth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... (← links)
- RA-18-0017, (Bsep), Unit No. 1, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time (← links)
- RA-19-0162, Cycle 24 Core Operating Limits Report (COLR) (← links)
- RA-19-0150, Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation (← links)
- RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors. (← links)
- RA-19-0130, Submittal of Annual Radioactive Effluent Release Report 2018 (← links)
- RA-19-0217, Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ... (← links)
- RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request (← links)
- RA-19-0256, Submittal of Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 (← links)
- RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request (← links)
- RA-18-0222, Submittal of Evacuation Time Estimates (ETE) Analysis (← links)
- RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 (← links)
- RA-19-0295, Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 2 (← links)
- RA-19-0297, Revision to Radiological Emergency Response Plan (← links)
- RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0380, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request (← links)